San Joaquin River Stockton Deep Water Ship Channel

  • Slides: 6
Download presentation
San Joaquin River Stockton Deep Water Ship Channel Dissolved Oxygen TMDL v What is

San Joaquin River Stockton Deep Water Ship Channel Dissolved Oxygen TMDL v What is a TMDL? v San Joaquin River DO TMDL Overview v TMDL Control Program & Phase II MS 4 Permit Sue Mc. Connell (Senior WRCE) (916) 464 -4798 Christine Joab (Environmental Scientist) (916) 464 -4655 Phase II MS 4 SJR DO TMDL 22 Jan 2014 1

What is a TMDL? v Waters not meeting water quality standards (objectives) v Impaired

What is a TMDL? v Waters not meeting water quality standards (objectives) v Impaired water bodies list v TMDL = Planning and Management Tool v Identify, quantify and control sources v Implement Control Program (actions, time schedule, monitoring) v Regulatory Programs v NPDES Permits (Municipal, Industrial & Storm Water) v Waste Discharge Requirements (WDRs) v 401 Water Quality Certifications v Technical and Monitoring Report Requirements Phase II MS 4 SJR DO TMDL 22 Jan 2014 2

Impaired Reach of the San Joaquin River Disappointment Slough Turner Cut Impaired Reach Port

Impaired Reach of the San Joaquin River Disappointment Slough Turner Cut Impaired Reach Port of Stockton Phase II MS 4 SJR DO TMDL 22 Jan 2014 3

TMDL Source Area Impaired Reach of the DWSC DO TMDL Source Area Friant Dam

TMDL Source Area Impaired Reach of the DWSC DO TMDL Source Area Friant Dam San Joaquin River Phase II MS 4 SJR DO TMDL 22 Jan 2014 Mendota Pool 4

TMDL Sources v TMDL Studies - 3 Contributing Factors v Channel Geometry v Flow

TMDL Sources v TMDL Studies - 3 Contributing Factors v Channel Geometry v Flow through the Channel v Upstream Oxygen Demanding Substances v City of Stockton WWTP discharges v Algae and nutrients from upstream watershed v Other upstream point sources (includes NPDES & Storm Water) Phase II MS 4 SJR DO TMDL 22 Jan 2014 5

TMDL & Control Program Actions v Contributors collectively responsible v Work together to implement

TMDL & Control Program Actions v Contributors collectively responsible v Work together to implement TMDL v Actions Implemented within Watershed v Stockton WWTP upgrade v Aeration Facility operation v Watershed studies and new WDRs for Ag v Phase II MS 4 – TMDL Implementation v Minimize, control and prevent discharge v Annual Report submittal Phase II MS 4 SJR DO TMDL 22 Jan 2014 6