Safeguards Training Ankara Turkey May 17 2011 Simplified

  • Slides: 12
Download presentation
Safeguards Training Ankara, Turkey May 17, 2011 Simplified Checklist EMP for Small Scale Civil

Safeguards Training Ankara, Turkey May 17, 2011 Simplified Checklist EMP for Small Scale Civil Works – Introduction and Exercise

Checklist EMP: Rationale and Beginnings • 2007 review of SG implementation in health &

Checklist EMP: Rationale and Beginnings • 2007 review of SG implementation in health & education sectors indicated: – Most of the projects Category “low B” – Environmental impacts usually related only to small scale construction / building rehabilitation – EMPs existed on paper but were long, complex, impractical – and mostly ignored… in most cases, no environmental site management at all • Recognition that issues for small scale construction/rehabilitation are fairly standard… no need to continually “re-invent the wheel” • Conclusion: Conclusion need a streamlined, practical instrument, which would be standardized, easy to prepare, implement and monitor, specifically tailored to small scale infrastructure

Checklist EMP: Eligibility Criteria • Category “low B” Project • Environmental issues known and

Checklist EMP: Eligibility Criteria • Category “low B” Project • Environmental issues known and limited to small scale construction/rehabilitation works* • Area of impact clearly defined & limited: either within an existing “footprint” or relatively small new areas known not to have major environmental or social issues * We’re thinking of developing one for rehabilitation of irrigation & drainage … ideas for other potential applications?

Checklist EMP: Structure and Function • components Part 1: Datasheet • Basic information on

Checklist EMP: Structure and Function • components Part 1: Datasheet • Basic information on project activities • Environmental baseline information 2: Screening: potential impacts • Grouped according to various themes or impact types • Themes / types to be checked as applicable 3: Mitigation measures for each potential impact • Each checked item from Part 2 triggers specific mitigation measures / parameters and specific, concrete activities to be implemented on site 4: Monitoring plan • Focuses on reasonable, meaningful, practical monitoring parameters for key mitigation measures and impacts

How EMP Checklist is used • Parts 1 & 2: 2 description of sub-project

How EMP Checklist is used • Parts 1 & 2: 2 description of sub-project and identification of potential impacts: for use by screener/approver • Part 3: 3 identifies issues and associated mitigation measures: becomes part of construction contract • Part 4: 4 monitoring/supervision plan to verify effective mitigation: for use by construction site supervisor and PMU 5

Typically a project financing small scale works will include multiple subprojects Project level (prior

Typically a project financing small scale works will include multiple subprojects Project level (prior to Appraisal): a brief EMF, describing scope of sub-projects and potential issues Sub-project level (during implementation): an Checklist EMP completed for each sub-project Note: Checklist EMP approach can also be applied to one project component, with regular EMP or EA applied to others 6

Example: Country X Real Estate & Cadastre Project (XRECP) Introductory information (to be filled

Example: Country X Real Estate & Cadastre Project (XRECP) Introductory information (to be filled in prior to Appraisal): • Project will finance rehabilitation of 15 Cadastre office buildings, all currently in use (sub-projects) • No new construction or extension of facilities – all works within existing footprint • All buildings located in urban areas on commercial streets with moderate to heavy traffic. • Some may be registered historical buildings • Rehabilitation will be interior and exterior and may include: repair or replacement of roofs & windows, rewiring, removal/replacement of insulation, masonry repairs, repair/replacement of floors, repair/replacement of plumbing, painting • A site-specific Checklist EMP form will be completed for each sub-project and will be attached to the construction works contract

Sub-project Example: Cadastre office construction in Town A Part 1 (Site Description Section )

Sub-project Example: Cadastre office construction in Town A Part 1 (Site Description Section ) 8

Part 2: Screening/ identification of issues (minor issues only) only Question: what kind of

Part 2: Screening/ identification of issues (minor issues only) only Question: what kind of issues might lead to decision that Checklist EMP is not appropriate? 9

Part 2 completed for Town A Cadastre Office sub-project

Part 2 completed for Town A Cadastre Office sub-project

Part 3: Mitigation Measures (delete any which do not apply)

Part 3: Mitigation Measures (delete any which do not apply)

Part 4: Monitoring Plan for selected potential impacts and mitigation measures 12

Part 4: Monitoring Plan for selected potential impacts and mitigation measures 12