SA Power Networks 2015 Service & Installation Rules (S&IR) Presenter: Martin Wilkes – Network Connections Manager
Presentation Overview • Meter Isolator • Meter Locations • Subdivisions • Service Points • Feedback for 2015 Service & Installation Rules • Contact Information 2|
Meter Isolator required for: Existing installations § Any alterations and/or upgrades that requires disconnection/reconnection § Change of metering via formal request (Form A) • Requiring disconnection and reconnection Form A requests include § Additional tariffs (PV/OPCL) 3|
Meter Isolator Not Required for: Existing installations Meter Change: § Retailer initiated meter change § Change of tariff with no metering change § Multiple occupancy installations* § Where meter is remote from main switchboard* § Meter mounted on SA Power Networks poles* Reconnection of Supply (inc. after 12 months) § No electrical work has occurred on consumer mains/main switchboard which normally requires SA Power Networks disconnection 4|
Preparation for Meter Exchange Cable 6 mm 2 PVC soft drawn copper (min) 5|
Meter Changed with Isolator Installed 6|
V. I. R. Wiring Cloth Covered Vulcanised Indian Rubber 7|
Metering Locations – General Requirements National Electricity Rules 7. 3. 2 Connection and metering point ‘The responsible person must ensure that the metering point is located as close as practicable to the connection point. ’ For 2015 Service and Installation Rules • Proposed ‘as close as practicable’ deemed 10 m 8|
Metering Locations – General Requirements Non Compliant 9|
10|
Meter Box 11|
Single Occupancy Non Domestic Clause 8. 8. 2. 2 Non Domestic • Metering enclosure to be located in an exterior location • For metering to be located inside a premise is only where agreed by SA Power Networks 12|
Transformer Room 13| Metering Inside
Subdivisions - Community Title Examples 14|
Service Points 7. 7. 8 Wiring Systems For over/under services, the minimum requirement is: • UV stabilised flexible conduit, • UV stabilised Black Nylon corrugated conduit. 15|
Service Points - Over/Under Services N O N 16| M O C A I L P NT NO O C N T N A I L MP
Flexible Conduit PVC Hose 17|
UV Stabilised Black Nylon Corrugated Conduit 18|
P M O T N A LI C N NO 19|
NO 20| O C N L P M T N IA
C N O P M O N 21| T N LIA
M O NC NO 22| T N A I L P
NO 23| O C N L P M T N IA
Feedback for 2015 S&IR Any feedback for the 2015 Service and Installation Rules Remember, exemptions do exist…. So, if in doubt, please call us at the earliest convenience to avoid potential knockbacks 24|
Contact Information • Builders & Electrical Contractors – 1300 650 014 • PV (Solar) Enquiries – 1300 665 913 • General Enquires – 13 12 61 • Faults & Emergencies – 13 13 66 • www. sapowernetworks. com. au 25|
- Service and installation rules
- 05 jun 2015 networks say
- Virtual circuit network
- Basestore iptv
- Power triangle
- Knowledge is power sir francis bacon
- Dear sir/madam i am writing to complain
- Domain name service in computer networks
- Truth tree decomposition rules
- Unlike traditional production rules, association rules
- Windchill bulk migrator installation and usage guide
- Tru count air clutch
- Armored cables manufacturers
- Ebitema
- Technisonic avionics installation
- Solar installation summit county
- Nexus iq
- Non standard installation unifi
- Smoke detector mounting tape
- Plc installation troubleshooting and maintenance
- Parts of floor framing
- Permastore factory
- Nm interlock indigent fund
- Ansi/neca 1-2015
- Meter installation/removal
- Refnet joint installation
- Is spectrum self installation easy