Run 9 polarized proton Log 9 Jan begin
Run 9 polarized proton Log • • • • • 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4. 5 degrees begins 5 Feb, Blue ring cold but still stabilizing 7 Feb, beam injected into Blue ring, 8 Feb, Yellow cold but still stabilizing 9 Feb, 2 week “Setup” mode begins (0. 5 weeks early) 13 Feb, Beam injected into Yellow ring 14 Feb, STAR magnet on, ramp development begins 17 Feb Nov, First collisions @ s = 500 Ge. V (2. 3 weeks into run – a record!) 24 Feb, “Ramp-Up” mode begins, overnight stores for experiments 6 Mar, Machine in “Physics” mode, integrated lumi begins 16 Mar, Spin rotator ramps established, longitudal polarization available 17 Mar Experiments in Physics mode 13 April (1200), end s = 500 Ge. V physics (3. 9 weeks), begin last s = 500 Ge. V beam development followed by new low level RF setup 15 April (0800), Maintenance and s = 200 Ge. V ramp setup 15 April (2100), begin setup with beam for s = 200 Ge. V 20 April (2341), s = 200 Ge. V physics begins (8 days early) with further ramp-up 21 April (1802), PHENIX physics begins 23 April , STAR physics begins 29 June (0800), pp 2 pp at STAR run begins, PHENIX on • 3 -6 Jul (when pp 2 pp and RHIC studies finished), Run 9 ends (10. 6+ weeks s = 200 Ge. V physics) , • 6 Jul, cryo warm-up begins • 8 Jul, cryo warm-up ~complete, 22. 3 weeks cryo operation
Run 9 s = 200 Ge. V Physics Goals • PHENIX (revised 5/19/09) – 65 pb-1 delivered, ~25 pb-1 recorded – 60% polarization, quality factor is P 4 L – FOM = 65 x (0. 60)4 = 8. 4 pb-1 delivered • STAR – 100 pb-1 delivered, ~50 pb-1 recorded – ~60% polarization, quality factor is P 4 L – FOM = 100 x (0. 6)4 = 13 pb-1 delivered
~2. 3 pb-1/day ~1. 1 pb-1/day
Blue Jet weighted average = 55. 4 ± 0. 5 Yellow Jet weighted average = 54. 9 ± 0. 5
- Slides: 27