RPS Data Products Status The RPS team has


- Slides: 2
RPS Data Products Status • • • The RPS team has been working towards delivery on the higher-order data products that have been part of the RPS plan since PDR Our progress is consistent with impacts from higher priority analyses for programs and relatively limited staff and budget Recent milestones: – Development of 1 -minute average spectra (new level 2 product) – Working on consistency check between two methods of computing flux • 1 We will provide quick-look products on request while we focus on our production codes
RPS Data Products Data Name Level 0 (L 0) Level 0 Data 1 (L 1) Level 1 Data 2 (L 2) Energy Spectra 3 (L 3) Energy. Angle Spectra 4 (L 4) Global Maps Contents Latency Reprocessing Status RPS PTP/CCSDS packets (decoded in CDF version, includes space weather data) Nearly all L 0 data, UTC, energy/photon deposits, singles and coincidence rates, s/c location, RPS boresight vector, magnetic field vector, dead times (including quota effects), minimal OPQ coordinates UTC, flux versus energy spectrum (once per 5 degrees rotation), pitch-angle and full magnetic coordinates (e. g. , Lm, MLT, I, Blocal, Bequ, F) of RPS boresight in OPQ and TS models. Separate 1 -minute spin averaged flux spectra. UTC, energy-pitch angle spectrum (once per spin and once per minute), full magnetic coordinates in OPQ, and TS models UTC, flux vs E/aeq/Lm, flux vs E/K/F, PSD vs M/K/F maps (once per orbit leg) in multilple field models 1 -3 days By MOC Done L 0 + 1 -3 days Daily up to L 0+5 days, and ondemand Quick look code mature, developing production code L 1 + 1 -2 days Daily up to L 0+7 days and ondemand Developing quick look L 2 + 1 -2 days Daily up to L 0+10 days and on-demand L 3 + 1 -2 days Daily up to L 0+14 days and on-demand