Rooftop Solar PV Systems for Metro Solar Energy

  • Slides: 26
Download presentation
Rooftop Solar PV Systems for Metro Solar Energy Corporation of India 1 st Floor,

Rooftop Solar PV Systems for Metro Solar Energy Corporation of India 1 st Floor, D-3, A Wing, Religare Building District Centre, saket, New Delhi-110017

India’s Current Energy Mix • India has an installed capacity of 238 GW, wherein

India’s Current Energy Mix • India has an installed capacity of 238 GW, wherein contribution from RE is 12%. • Among RE (30 GW), Wind Energy is the major contributor with 66% of the total RE mix but Solar power is still at low level (9%) • India is facing current energy deficit of 6. 7% whereas the peak energy deficit is 6. 2% *ER is surplus

Harnessing India’s Vast Solar Potential • Current peak deficit - 6, 000 MW. •

Harnessing India’s Vast Solar Potential • Current peak deficit - 6, 000 MW. • Future growth is expected @ 5% per annum • Renewable energy sources need to be used – Due to various issues and environmental effects of conventional sources. • Solar energy potential in the country is high 4. 5 -5. 5 k. Wh/m 2 in most of the regions. • High radiation areas are having good amount of waste/barren lands. • 10% of Energy mix through Solar requires 100 GW solar capacity in the country ( after adjusting CUF

SECI- Inception and Objectives OUR MANDATE: A Government of India Enterprise under the administrative

SECI- Inception and Objectives OUR MANDATE: A Government of India Enterprise under the administrative control of MNRE To be the implementing agency for meeting the National Solar Mission objectives To plan and execute an integrated programme on development and Incorporated on 20 th September, 2011 as a “Not for profit” Company under Section 8 of the Companies Act, 2013 deployment of solar energy technologies to achieve commercialization; Authorised capital INR 2, 000 Crores; Paid up capital INR 86. 83 Crores upto FY 2014 -15 To own, operate and manage, both grid-connected & off-grid power stations; 03 -Jun-21 SOLAR ENERGY CORPORATION OF INDIA To promote R&D in Solar 4

SECI Activities : Ongoing Broad mandate : Implementation & Facilitate various activities of the

SECI Activities : Ongoing Broad mandate : Implementation & Facilitate various activities of the JNNSM. As part of the Mission activities SECI has taken up the following projects/ activities. Ø 750 MW Grid connected solar power plants under JNNSM Phase II Ø Implementation of 25 Solar Parks/ UMPP Ø Pilot CSP Projects of around 100 MW Ø Project Management Consultant for about 1000 MW Solar Power Plants Ø Implementation of Grid Connected Solar Roof-Top scheme Ø Development and dissemination of solar home lighting systems/ solar lanterns Ø Solar Thermal installations for water/air heating Ø Solar Mini/Micro Grids/street lights/ Off-grid projects etc Ø R&D Projects 6/3/2021 SECI 5

Global PV installations projections Residential sector continue to be the major part along with

Global PV installations projections Residential sector continue to be the major part along with large scale utility power plants Source: IEA

Growth of Solar Capacity (MW) State Solar Capcity (MW) 3002. 66 2101 1684 936

Growth of Solar Capacity (MW) State Solar Capcity (MW) 3002. 66 2101 1684 936 3 11 36 2008 -09 2009 -10 2010 -11 2011 -12 2012 -13 2013 -14 Dec-14 Source: MNRE, as on 15. 12. 2014 A & N Island Andhra Pradesh Arunachal Pradesh Chhattisgarh Chandigarh Delhi Gujarat Haryana Jharkhand Karnataka Kerela Lakshadweep Madhya Pradesh Maharashtra Orissa Punjab Puducherry Rajasthan Tamil Nadu Telangana Uttar Pradesh Uttarakhand West Bengal Others Total MWp 5. 1 234. 86 0. 025 7. 6 2 5. 465 929. 05 12. 8 16 67 0. 025 0. 75 353. 58 286. 9 31. 5 55. 77 0. 025 839. 5 104. 2 8 29. 51 5 7. 21 0. 79 3002. 66 % 0. 17% 7. 82% 0. 00% 0. 25% 0. 07% 0. 18% 30. 94% 0. 43% 0. 53% 2. 23% 0. 00% 0. 02% 11. 78% 9. 55% 1. 05% 1. 86% 0. 00% 27. 96% 3. 47% 0. 27% 0. 98% 0. 17% 0. 24% 0. 03% 100. 00%

Roof top PV-Towards grid parity Source: KPMG By 2017 roof top solar power cost

Roof top PV-Towards grid parity Source: KPMG By 2017 roof top solar power cost will reach the grid parity.

Benefits of Roof top PV • Land is a scarce resource, rooftop is an

Benefits of Roof top PV • Land is a scarce resource, rooftop is an alternative for solar PV systems • consumers, it – Reduces the dependency on grid power. – Mitigates diesel generator dependency – Long term reliable power source • For Discoms, it reduces – Day Peak load Demand – T&D and conversion losses as power is consumed at the point of generation • Most suitable for commercial establishments – Max generation during day time – Solar power cost has come down almost 50% of the diesel tariff close to the commercial power cost – A 100 k. W capacity Rooftop system requires an area of about 1000 sq. metre – With subsidy, Payback Period of around 3 -4 years for diesel substitution,

SECI’s Grid Connected Rooftop Scheme • MNRE launched a pilot scheme in year 2013

SECI’s Grid Connected Rooftop Scheme • MNRE launched a pilot scheme in year 2013 for grid connected rooftop PV power projects –being implemented by SECI • The scheme allows system size from 100 k. W to 500 k. W – Aggregation of capacity from smaller roofs is allowed. • 30% of the cost would be provided as subsidy and 70% to be met by the consumer • Systems are to be grid connected and without battery back up • Mostly in-house/captive consumption and to replace diesel generation • Surplus solar power to be fed to the grid • Cities across India being covered under the scheme for wider participation/promotion • Developers selected through a competitive process

Implementation • Under the scheme SECI – Allocates capacity for each city/State in consultation

Implementation • Under the scheme SECI – Allocates capacity for each city/State in consultation with MNRE/SNAs – Verifies project proposals w. r. t. technical specifications and releases the sanction for subsidy which is linked to performance up to 2 years – Releases initial subsidy on successful commissioning as per technical specifications (20%) – Release 5 % subsidy each at the end of 1 st and 2 nd year of successful maintenance of the project – Helps developers for identification of projects through dissemination workshops and to discuss any issues with concern authorities

SECI’s Ongoing Scheme of Rooftop PV (Covering 37 Cities of India) Chandigarh (1) Implementing

SECI’s Ongoing Scheme of Rooftop PV (Covering 37 Cities of India) Chandigarh (1) Implementing Rooftop projects with 30% subsidy from MNRE Upto 500 k. W capacity projects being set up in select cities Phase I: 5. 5 MW (4 cities) Phase II: 11. 3 MW (6 cities) Phase III: 10 MW (9 cities) Phase IV: 50 MW (29 cities) Mohali (1) Gurgaon (2. 5) New Delhi (5) Jodhpur (. 25) Jaipur (3. 75) Gwalior (1) Neemrana (. 25) Bhopal (1) Gandhinagar (1) Vadodara (0. 5) Surat (0. 5) Legend Phase III Phase IV Multiple phases () Capacity in MW Nasik (0. 5) Nagpur (0. 5) Mumbai (1) Pune (3) Tirupati (0. 5) Bangalore (3) Coimbatore (1. 5) Amritsar (0. 5) Ludhiana (0. 5) Lucknow (1. 0) Noida/Greater Noida (3. 5) Panchkula (1) Faridabad(0. 5) Patna (2) Palatana (1) Ranchi (2) Kolkata (2) Durgapur (1) Bhubaneswar (1) Raipur (2. 05) Vijaywada (0. 5) Hyderabad (4) Chennai (6) Mysore (1) Madurai (0. 5) 11

Achievements: Grid connected Rooftop Schemes • Total allocated capacity: 60 MWp • Installed capacity:

Achievements: Grid connected Rooftop Schemes • Total allocated capacity: 60 MWp • Installed capacity: 14 MWp • Number of projects under execution: 90 Nos

Phase –IV- Salient features • It was launched on 24. 03. 2014 • 21

Phase –IV- Salient features • It was launched on 24. 03. 2014 • 21 States are covered in this phase. • For new States only capital city is covered • Bids were invited for the capacity of 50 MW • RESCO mode has been introduced for the first time – Capacity under Capex Mode is 40 MW & RESCO mode is 10 MW • Maximum Bid Capacity limit is kept 5 MW instead of 2 MW and Minimum Bid Capacity limit is kept 500 k. W instead of 250 k. W • Residential project size less than 10 k. W have also been considered this time – Aggregate capacity for residential projects is 50 k. W

Contd… • Timeline for project Identification & Execution – 3 months for identification –

Contd… • Timeline for project Identification & Execution – 3 months for identification – 6 months for execution • Requisite documents for project identification – Project report, Agreement between the rooftop owner and the bidder Achievements so far • Total allocated capacity: 60 MWp • Installed capacity: 14 MWp • Number of projects under execution: 90 Nos

Phase –IV – Capex Model • Aggregate allocated capacity of 23. 5 MWp under

Phase –IV – Capex Model • Aggregate allocated capacity of 23. 5 MWp under CAPEX & 9. 0 MWp under RESCO Model in the following States Other details like name of the successful bidders, Price, Cities etc. , are available on our website. www. seci. gov. in CAPEX RESCO Allocated State Capacity Andhra Pradesh 1500 k. W Pradesh 2000 k. W Bihar 1000 k. W Delhi 2000 k. W Gujarat 2000 k. W Karnataka 1000 k. W Haryana 2000 k. W Maharashtra 2000 k. W Jharkhand 2000 k. W Tamil Nadu 2000 k. W Karnataka 2000 k. W Madhya Pradesh 1000 k. W Maharashtra 3000 k. W Punjab 2000 k. W Rajasthan 1000 k. W Tamil Nadu 3000 k. W Uttar Pradesh 3000 k. W

Installations under our Scheme: At a Glance

Installations under our Scheme: At a Glance

Module India Make Plant Capacity 360 k. Wp Rooftop Owner Super Auto Forge Pvt.

Module India Make Plant Capacity 360 k. Wp Rooftop Owner Super Auto Forge Pvt. , Ltd. , City Chennai State Tamilnadu Project Cost Rs. 3. 06 Cr CFA through SECI Rs. 92 lacs

Module India Make Plant Capacity 140 k. Wp Rooftop Owner Tube products India City

Module India Make Plant Capacity 140 k. Wp Rooftop Owner Tube products India City Chennai State Tamilnadu Project Cost Rs. 1. 19 Cr CFA through SECI Rs. 36 lacs

Module India Make Plant Capacity 100 k. Wp Rooftop Owner Rockwell Industries City Hyderabad

Module India Make Plant Capacity 100 k. Wp Rooftop Owner Rockwell Industries City Hyderabad State Andhra Pradesh Project Cost Rs. 0. 74 Cr CFA through SECI Rs. 22. 2 lacs

Module India Make Plant Capacity 300 k. Wp Rooftop Owner IIT Madras City Chennai

Module India Make Plant Capacity 300 k. Wp Rooftop Owner IIT Madras City Chennai State Tamilnadu Project Cost Rs. 2. 49 Cr CFA through SECI Rs. 75 lacs

Module India Make Aggregate Plant Capacity 900 k. Wp Rooftop Owner SKF I &

Module India Make Aggregate Plant Capacity 900 k. Wp Rooftop Owner SKF I & II City Bengaluru State Karnataka Project Cost Rs. 7. 47 Cr CFA through SECI Rs. 2. 24 Cr

Module India Make Plant Capacity 100 k. Wp Rooftop Owner NIAS City Bengaluru State

Module India Make Plant Capacity 100 k. Wp Rooftop Owner NIAS City Bengaluru State Karnataka Project Cost Rs. 83 lacs CFA through SECI Rs. 25 lacs

Module India Make Plant Capacity 300 k. Wp Rooftop Owner Sandhar Components City Gurgaon

Module India Make Plant Capacity 300 k. Wp Rooftop Owner Sandhar Components City Gurgaon State Haryana Project Cost Rs. 1. 90 Cr CFA through SECI Rs. 56. 7 lacs

Module India Make Plant Capacity 500 k. Wp Rooftop Owner Medanta Hospital City Gurgaon

Module India Make Plant Capacity 500 k. Wp Rooftop Owner Medanta Hospital City Gurgaon State Haryana Project Cost Rs. 4. 15 Cr CFA through SECI Rs. 1. 24 Cr Back

THANK YOU Visit us at: www. seci. gov. in

THANK YOU Visit us at: www. seci. gov. in