Road capacity Systems Rail capacity Organization Station roof
- Slides: 8
Road (capacity) Systems Rail (capacity) Organization Station roof (stability) Information Switches (rated speed)
Rotor Scheduling (turbulence) Tower Budget (stiffness) Foundation Operational(stability) window
Bullet payment Income € Income = availability payment Hangers (vibration) Contract Tying chord (forces) Finance Arch. Risk (span) Time Y Operational Expenditures (O&M opex costs) Capital Expenditures (D&B capex costs) Cost € Renewal costs (HM) Exploitation(OM) Realization (EPCm) Availability Date End date
Improving system performance using quantitative methods: modelling, simulation, quantification, optimization
Engineering Asset Management Themes: Construction Informatics Construction Logistics Systems Engineering
Recommended courses for MSc CE students: CIE 4381 Engineering Asset Mngt Q 1 CIE 4120 Information Systems for Construction Q 1 CIE 4481 Systems Engineering Mngt Q 2 CIE 4130 Probabilistic Design CME 2210 Open Design & Construction Mgt CIE 4170 Construction Technology CIE 4391 Integral Asset Planning Q 2*) Q 3 Q 4*) Q 1 (2020) *) 4130 and 4170 are already compulsory for many CE students
ANNOTATION: Integral Design & Management (IDM) Courses: • CIE 4381 Engineering Asset Mngt • CIE 4120 Information Systems for Construction • 6 EC from a shortlist Can be done within 120 ECTS Project: • CIE 4061 Multidisc Project or CIE 4040 Internship with an IDM-flavour *) Graduation Thesis: • CE project with an IDM-flavour *) “IDM Flavour”: Engineering & Management, multi-disciplinary, build upon IDM courses
If you think about an IDM annotation, Or if you want to ask about courses: Contact us! g. a. vannederveen@tudelft. nl r. wolfert@tudelft. nl More information: • For IDM courses and annotation: http: //idm. citg. tudelft. nl • For past graduation projects, see CME brightspace: http: //Brightspace. tudelft. nl/d 2 l/le/content/43167/Home