RMS Overview PRI Registrar RMS Overview PRI Registrar
- Slides: 56
RMS Overview PRI Registrar
RMS Overview • PRI Registrar utilizes an online audit management system, called RMS (Registrar Management System). • All ISO 9001 / ISO 14001 audits will be managed directly through RMS. • All Aerospace audits are scheduled in RMS, but performed through the OASIS database. 2
Auditor Dashboard Navigation 3
Auditor Profile 4
Auditor Calendar 5
Auditor Calendar • The Sales and Scheduling department will use the calendar in RMS as a primary tool in making audit assignments. • Please keep your calendar up to date to assist in the scheduling of audits. 6
Audit Program Search 7
Audit Program Search 8
Master Audit Program • The Master Audit Program page provides information for the organization as a whole. • If the organization has more than one site, all sites will be listed on this page, with links the sites’ individual Site Audit Program pages. 9
Master Audit Program 10
Site Audit Program • The Site Audit Program page provides information specific to each site within the overall organization. • The audit program plan for each site is located on this page. • Links for each audit in the 3 -year cycle are available on this page. 11
Site Audit Program 12
Audit Program • Per the requirements of ANAB, an audit program must be completed for certified organizations, detailing the plan for assessing the organization’s processes. • Aerospace clients’ audit programs will be documented on the RF-117 (Audit Program Detail Form), but all non-Aerospace programs need to be documented in RMS. 13
Audit Search 14
Audit Search 15
Auditor Dashboard Tasks • Whenever an action is required in RMS, a task is created and placed on the dashboard of the individual(s) responsible for the action. • Clicking on the task will take you to the page in RMS where the action can be completed. – Some tasks are merely reminders of actions that must be taken outside of RMS. These can be dismissed when complete. • All tasks are assigned deadlines; please be mindful of meeting these deadlines. 16
Auditor Dashboard Tasks 17
Auditor Confirmation • After the Scheduler assigns an auditor to an audit with audit dates, the auditor will receive a task to accept or decline the audit. • Please be timely in responding to this task; the process for preparing for the audit is not begun until the audit is accepted. • Contact Scheduling (dcoyne@p-r-i. org) if the audit dates need to be modified. • If you need to decline for any reason (e. g. , scheduling conflict, or conflict of interest), add a note briefly describing your reason for declining. 18
Auditor Confirmation 19
AEROSPACE 20
Aerospace • For Aerospace audits, while the audit itself will be conducted using OASIS, the process to this point will be the same for all standard programs. • Prior to audit planning, the auditor shall collect the PRI-specific audit documentation from the Plan tab of the audit in RMS. – This documentation will be uploaded into OASIS when completed. 21
Aerospace 22
ISO 9001 / ISO 14001 / OHSAS 18001 23
ISO: Audit Planning • RMS contains functionality to complete the audit plan in the Plan tab of the audit. However, due to a variety of factors, auditors need to complete the audit plan on the RF-12 form, available in the Help tab of RMS. • Once the plan is completed and sent to the client, click on the “Submit” button on the Plan tab in order to move the audit status forward and generate the audit documents. 24
ISO: Audit Planning • The Plan tab is the first place in which the auditor has the opportunity to enter the client processes. – You may enter the processes at this point if you know them. You will have the opportunity to enter the processes later, if necessary. 25
ISO: Audit Planning 26
ISO: Overview Tab • All audit documentation can be accessed via the Overview tab; click on the “Download Template” link next to each document title to download prepopulated reports. • When complete, upload each document into its designated slot. – If no slot is available for a document, upload it into the “Other Documents” section. – Remember that audit documentation is due 5 days after the end of the audit. 27
ISO: Overview Tab 28
ISO: Processes • All client processes must be entered into RMS. – These processes drive the NCRs in RMS. • Process names must match those used in the RF 129/a (QMS/EMS Matrix), the audit plan, and the Process Effectiveness Assessment tables of the audit report. • Once entered into RMS, these processes will carry over to future audits and do not need to be reentered, except to update based on changes to the client’s processes. 29
ISO: Processes 30
ISO: Processes 31
ISO: NCRs • Nonconformances are entered directly into RMS by the auditor; this should be done, if possible, prior to the closing meeting. Remember that audit time must not be used for the entering of NCRs, and that non-audit time must be used for this. – If RMS is unavailable to enter the NCRs prior to the closing meeting, the NCRs must be left with the client in some form. 32
ISO: NCRs 33
ISO: NCRs 34
ISO: NCR Response • Clients will respond to nonconformances through RMS. • The lead auditor will receive notifications from RMS when NCR statuses change. • The auditor may edit the content of the NCR at any time, if necessary. 35
ISO: NCR Response 36
ISO: NCR Response 37
ISO: NCR Response 38
ISO: NCR Response Correction • When reviewing a client’s correction response, there are three possible actions: – Reject: The client’s response is unacceptable, and needs to be redone. – Reject for evidence: The client’s plan is acceptable, but they still need to provide objective evidence of completion. – Close: The client’s plan is acceptable, and evidence of completion has been provided. 39
ISO: NCR Response Correction 40
ISO: NCR Response Root Cause • When reviewing a client’s root cause, there are two possible actions: – Reject: The client’s root cause is not acceptable and needs to be redone. – Close: The client’s root cause is acceptable. 41
ISO: NCR Response Root Cause 42
ISO: NCR Response Corrective Action • When reviewing a client’s corrective action, there are four possible actions: – Reject: The client’s response is not acceptable and needs to be redone. – Reject for Evidence: The client’s plan is acceptable, but objective evidence of effectiveness needs to be submitted. • Only use this option if you intend to close the NCR at the current audit. The NCR will remain open until evidence is submitted. – Accept: The client’s plan is acceptable, but you do not intend to verify effectiveness at the current audit. • The NCR will be locked until the next audit after selecting this option. – Close: The auditor has verified the effectiveness of the client’s response. 43
ISO: NCR Response Corrective Action 44
ISO: NCR Response Verification and Closure 45
ISO: AUDIT REPORT 46
ISO: Audit Report 47
ISO: Audit Report 48
ISO: Audit Report 49
ISO: Audit Report 50
ISO: Audit Report 51
EXPENSE REPORTS (all standards) 52
Expense Report • The expense report will become available the day after the end of the audit. • Be sure to separate out your expenses by category. – If you choose to use PRI’s AMEX travel service to book your airfare, be careful to indicate that the fare was paid by PRI. 53
Expense Report 54
Expense report 55
Contact Us • If you have any questions about the functionality of RMS, or need to report any problems, please contact Danyel Coyne (dcoyne@p-r-i. org) or Louise Stefanakis (lstefanakis@p-r-i. org). You can also call our Support line at 724 -772 -8679. 56
- Pri rms
- Rms consulting
- Rms contrast
- Peak voltage formula
- Airmail pactor
- Bendera rms
- Forrier transform
- Ad rms bulk protection tool
- Single phase half wave controlled rectifier with rle load
- Vrms derivation
- Pemberontakan rms dipinpin oleh.... *
- Rms 9 login
- Rms spectral width
- E learning raden intan
- Rms değeri nedir
- Konflik gam rms dan opm
- Rms physics
- Half wave rectifier vrms
- Ac voltage controller output voltage formula
- Rms restaurant management system
- The unsinkable wreck of the rms titanic
- Rms value
- Rms edf
- Bayrms
- Ema service desk portal
- Irm drm
- Rms robotics
- Rms derivation
- Rms trimode
- Spc/fdc/rms/apc
- Winlink international log
- Kccg rms
- Rms and edf scheduling example
- Rms edf
- Rms inspection
- Morehouse school of medicine registrar
- Fau financial aid contact
- Sip vc
- Fvsu wildcat email
- Fpu registrar
- Activity diagram for student registration system
- Kfupm graduate
- Mission and vision of plmar
- Webreguci
- Ttuhsc webraider portal
- Ford iso 14001
- Utica college registrar
- Loyola web advisor
- Cal poly pomona registrar's office
- Mia irwan
- Aub grades conversion
- Registrar utm
- Kfupm registrar
- My unm
- Etsu registrar office
- Gerry donahue
- Registrar's office umbc