Request for Proposal and Specifications for Air and Water Balancing for the STEM Innovation

Request for Proposal and Specifications for Air and Water Balancing for the STEM Innovation Learning Center, Project No. 008 -302306 Re-released June 27, 2019 Slide No 1

I. Welcome and Introduction A. Robert Kuhn, Sr. Buyer B. Mark Gibbons, Project Manager

I. Welcome and Introduction A. Robert Kuhn, Sr. Buyer B. Mark Gibbons, Project Manager C. Ryan Hass from NORR Architects D. Other University Attendees E. Sign-in Sheet will be posted to the website. F. A copy of this presentation will be posted to the website

I. About Wayne State University: A. Was founded in 1868 B. Is committed to

I. About Wayne State University: A. Was founded in 1868 B. Is committed to preparing its students to excel in a fast-paced and interconnected global society C. Has more than 27, 000 students D. Nearly 350 degree and certificate programs in 13 schools and colleges. E. Holds the Carnegie Foundation’s highest research and community engagement classifications. F. http: //mac. wayne. edu/pdf/fastfacts. pdf

I. List. Serve Services: A. Bid notices are sent only to those Contractors registered

I. List. Serve Services: A. Bid notices are sent only to those Contractors registered to receive them via our Bid Opportunities Listserve service. To register, go to http: //go. wayne. edu/bids, and click on the “Join our Listserve” link at the top of the page.

I. Competency of Bidders A. Please Note: The competency and responsibility of Bidders will

I. Competency of Bidders A. Please Note: The competency and responsibility of Bidders will be considered in making the award. The Owner does not obligate himself to accept the lowest or any other bids. The Owner reserves the right to reject any and all bids and to waive any informalities in the Proposals

I. RFP Opportunity A. The University is soliciting proposals for Air and Water Balancing

I. RFP Opportunity A. The University is soliciting proposals for Air and Water Balancing for the STEM Innovation Learning Center, Project No: 008 -302306 B. We are seeking superior quality & competitive pricing C. Specifications are in Specifications Book and Drawings on the Website

I. Calendar of Events A. Mandatory Pre-bid meeting – June 11, 2019 at 2:

I. Calendar of Events A. Mandatory Pre-bid meeting – June 11, 2019 at 2: 00 pm. B. OPTIONAL Second Walk-Through: TBD (if needed) C. Questions due to Procurement & Strategic Sourcing - July 16, 2019 - 12 Noon D. Delivery of Proposals - July 18, 2019 by 2: 00 pm E. Time of Completion – June 30, 2020 F. Liquidated Damages - $150. 00 per day for each day's delay in substantially completing said project.

I. Bid Due Date A. The link for bid submission have been posted with

I. Bid Due Date A. The link for bid submission have been posted with the bid details at http: //go. wayne. edu/bids beginning June 27, 2019, re-release. B. We require your lump sum proposals, vendor qualification questionnaire and your bid bond documents as a single PDF in your electronic submission C. Prices and other requested data must be on Section 300, Form of Proposal D. Proposals must acknowledge all Addenda including Pre-Bid Meeting Minutes

I. Bid Qualification Meeting – pre award A. Bidders should be available for bid

I. Bid Qualification Meeting – pre award A. Bidders should be available for bid qualification meeting the day following the bid opening B. Bid qualification meeting includes Project Schedule and Schedule of Values, including a list of Contractor’s subcontractors C. An unsigned contract will be given to the successful Contractor D. The Contractor has 5 business days to return the contract, with 1. 2. Performance Bond Certificate of Insurance E. Failure to return within 5 days may disqualify vendor (with consequences)

I. Section 100: Information for Vendors A. Proposals shall be for a lump-sum General

I. Section 100: Information for Vendors A. Proposals shall be for a lump-sum General Contract B. All base bids must be conforming to the detailed specifications and drawings C. Bid Bond (or Certified Check) in amount of 5% of base bid due with bid D. Performance Bond and Material & Labor Payment Bond in the amount of 100% of the final amount due with signed construction contract E. For Base Bids below $50, 000, bid bond not required F. For Contracts below $50, 000, performance and material & labor payment bond not required

I. Section 300: Form of Proposal A. Include company name at top B. Complete

I. Section 300: Form of Proposal A. Include company name at top B. Complete pricing information including any alternates or unit pricing requested C. Contractor is responsible for damage to lawns or other landscaping D. Contractor is responsible for their own dumpster for any construction debris E. Complete Prequalification Matrix and Questionnaire F. Complete signatory information and have signed by an Authorized Signatory for contractor

I. Section 410: Prevailing Wage Rates A. B. C. D. E. F. G. H.

I. Section 410: Prevailing Wage Rates A. B. C. D. E. F. G. H. Wayne State University requires all project contractors, including subcontractors, to compensate at a rate no less than prevailing wage rates Prevailing Wage Schedules are posted on the website and must be posted at the job site. 1099 Workers are NOT acceptable Certified Payroll must be provided with each of the contractor’s pay applications Sworn Statement must be provided for all materials and labor contracted in excess of $10, 000. 00 Signed waivers from all Subcontractors and suppliers must accompany Pay Applications Note: Contractor invoices WILL NOT be processed until all listed certified payroll documents are received https: //procurement. wayne. edu/vendors/wage-rates. php

I. Sections 420, 430, and 440 A. Section 420: Key Performance Indicator Tracking Forms

I. Sections 420, 430, and 440 A. Section 420: Key Performance Indicator Tracking Forms B. Section 430: Pay Application Requirements C. Section 440: Contractor Evaluation Criteria

I. Section 500: Sample Contract A. Contractors must review the contract in its entirety

I. Section 500: Sample Contract A. Contractors must review the contract in its entirety B. Questions or Concerns must be submitted in advance to Buyer by question deadline

I. Section 700: General Conditions A. Revised by the University 7 -2018 B. Includes

I. Section 700: General Conditions A. Revised by the University 7 -2018 B. Includes the following: 1. Responsibilities of the Parties 2. Responsibility to Secure and Pay for Permits 3. Interpretation of and Adherence to Contract Requirements 4. Claims and Disputes.

I. Section 700: General Conditions (continued) A. Permit requirements are the responsibility of the

I. Section 700: General Conditions (continued) A. Permit requirements are the responsibility of the awarded contractor and are not reimbursable (4. 02. 18) B. City of Detroit: Elevators, and Sidewalks C. State of Michigan: Fire Inspection, Electrical, Mechanical, and Plumbing D. State Permits not required for nonclassroom or residential housing buildings

I. Section 800: Supplementary General Conditions A. Certificates of Liability Insurance must be provided

I. Section 800: Supplementary General Conditions A. Certificates of Liability Insurance must be provided matching amounts listed on page 800 -6 B. Contractor is responsible to ensure all subcontractors also obtain insurance at these amounts C. Also see Section 700, article 4. 05. 1 D. Sample ACORD form can be found at https: //procurement. wayne. edu/forms/rfp_ins urance_requirements. pdf

I. Section 1000: General Requirements A. All work must comply with both University Construction

I. Section 1000: General Requirements A. All work must comply with both University Construction Design Standards and the Standards for Communications Infrastructure B. This may be an occupied area, awarded Contractor must be considerate of environment (noise, cleanliness, etc. ) C. Interaction with students and/or staff not connected to the project is prohibited D. Project hours of operation are 7: 00 am – 5: 00 pm. E. Parking on WSU campus lots and structures has just been increased to $8. 50/access. There is no complimentary parking for Contractor’s employee vehicles F. Wayne State has a smoke- and tobacco-free policy for indoor and outdoor spaces

I. Air and Water Balancing Stem Innovation Learning Center A. Located at 5048 Gullen

I. Air and Water Balancing Stem Innovation Learning Center A. Located at 5048 Gullen Mall, Detroit, MI 48202 B. Provide full building water and air balancing

I. Reminders A. The UNIVERSITY reserves the right to accept, reject, modify, and/or negotiate

I. Reminders A. The UNIVERSITY reserves the right to accept, reject, modify, and/or negotiate any and all proposals B. All information related to this RFP will be posted to the Project site at http: //go. wayne. edu/bids C. If a List Serve has been established, those wishing notifications must register as listed in the RFP D. All questions concerning this Request for Proposal are to be directed to Robert Kuhn, Sr. Buyer, Email; ac 6243@wayne. edu E. A copy should be submitted to Kim Toby-Tomaszewski, Sr. Buyer, Email; ac 9934@wayne. edu F. Do not contact Facilities Planning & Management or other University Units directly, as this may result in disqualification of your proposal

I. Other A. B. C. D. E. F. G. H. I. J. K. No

I. Other A. B. C. D. E. F. G. H. I. J. K. No permits anticipated. Granger is the Construction Manager (CM) on this project. Limbaugh is the Mechanical Contractor on this project. The STEM Innovative Learning Center is a 7 story building and has been gutted and redone, except for Chemistry. There about 50 fume hoods in the building (wet labs). There will be a basement, sub-basement and penthouse included. Most items are exposed and there are few ceiling grids, note – the Library has a web deck. Floors are 90% polished concrete. Liquidated damages will not be applicable as vendors will have ample time to execute the air and water balancing. A Construction Schedule will be given to the awarded vendor. The building renovation will be a LEED Project with commissioning. Hours are 7: 30 am – 3: 00 pm

I. Other continued L. Each Chilled beam will need to be balanced to meet

I. Other continued L. Each Chilled beam will need to be balanced to meet the required flow rate. M. Chilled beam details on M 70 -03 show balance valves.

Procurement & Strategic Sourcing ? ? Questions ? ? Slide No 23