Request For Inspection RFI Saudi Arabia April 2020
Request For Inspection (RFI) Saudi Arabia – April 2020
QMIS 1. Objective • What is RFI • Contents of RFI • Process of RFI 3
RFI What is RFI? • RFI is a document prepared and submitted to the assigned project inspector. • RFI is used to notify the inspector that inspection point is ready for inspection. • The RFI is issued only for hold and witness point. • Hold Point Inspection: work shall not proceed attendance without inspector • Witness Point Inspection : work can proceed with inspector sample witness and permission • Review Point Inspection : Work can proceed based on document review and approval of inspector • Surveillance Inspection: inspection and monitoring of activities without RFI 4
RFI Timing Week days ( from Saturday to Wednesday) Weekend (Thursday Friday ) at least 24 hours before inspection at least 48 hours before inspection PID receive RFI 5
RFI Contents of RFI 1. 2. 3. 4. 5. Cover Page SAIC SATIP Drawing Other Attachments 6
RFI Number of RFI Name of Inspector Inspection Information Contractor Information PMT Information PID Information 7
RFI - SAIC 8
RFI - SAIC 9
RFI - SATIP 10
RFI - SATIP Process 11
RFI BENEFITS of SATIPs & SAICs • Minimize time required to prepare I&TPs • Reduce or eliminate lengthy reviews • Standardize SATIPs, SAICs & SATRs for all projects • Optimize the QC processes 12
RFI Drawing Two important tips for Inspection: 1 -The Drawings approval 2 - The latest revision no. N 38 S HB-160029 001 02 • Drawing Types 1. Design Drawing 2. Shop Drawing 3. Isometrics Drawing 4. Coordination Drawing 13
RFI - Process 14
Conclusion RFI gives the Inspector very important information in order to achieve : § Indicates Type of Inspection (Hold, Witness, Review) § Perfect Inspection § Increase the productivity § Reference on how to conduct inspection § Required documents of inspection § Time of inspection § Location of inspection § Acceptance criteria of activity § Assigned Contractor QC § Readiness of inspection required to be conducted § commitments of contractor quality team towards the project 15
RFI Thank you, 16