Renewable Energy Initiatives Solar PV Deployment Dr Rajan
Renewable Energy Initiatives Solar PV Deployment – Dr. Rajan Kapur Residential – Mostly roof mounted. Fixed and few BIPV Upto 10 k. W, up to 1000 sq-ft. Si, and recently Cd. Te $8/W installed Commercial – Mostly roof and flat roof mounted. Fixed and few BIPV Upto 1 MW. approx 100, 000 sq-ft c-Si, Cd. Te, CIGS tubular $7/watt installed Utility Scale – Ground mounted. Fixed and Tracking Largest approved by PG&E 550 MW (for 2012, @ $2/W quoted) Tens of acres up-to tens of square miles! C-Si, Cd. Te, CIGS flat plate One report of $3. 17/watt installed 15. 5 MW Nellis AFB, 12 MW Boulder City, 8 MW Alamosa. . 3/9/2021 Larankelo Inc. Confidential (c) 1
Renewable Energy Initiatives Solar PV Installation Outdoors: PV Modules Mechanical Mounting DC Cables Indoors: DC Cables Inverter Circuit Breakers AC Cables Loads PV Circuit Breakers Bi. Directional Meter Grid ~ 3/9/2021 Loads 2008 Cost per watt installed (without incentives) PV Module: 4. 20 (60%) Inverter: 0. 70 (10%) Electrical: 0. 14 (2%) Mechanical: 0. 28 (4%) Labor 1. 05 (15%) Ship, Permit, Tax 0. 77 (11%) Total: $7. 00/watt Larankelo Inc. Confidential (c) 2
Renewable Energy Initiatives Solar PV Deployment – Dr. Rajan Kapur Outdoors: PV Modules Micro. Inverters Mechanical Mounting AC Cables PV u. I Indoors: Circuit Breakers AC Cables Loads Circuit Breakers Bi. Directional Meter Loads Grid 3/9/2021 Larankelo Inc. Confidential (c) 3
Benefits of AC PV Modules ¬ Simpler Field Installation – Micro. Inverter is attached to the PV module in the factory ¬ System design is simplified: Scalability More Value-Add in the Factory Less Assembly Work in the Field ¬ Increased AC Power Harvest 5% to 20% more AC Power Harvest ¬ Increased Robustness – Longer Unattended Operation – Remote monitoring of individual components – Single failure does not affect others in the array 3/9/2021 Larankelo Inc. Confidential (c) 4
Inverters 3/9/2021 Larankelo Inc. Confidential (c) 5