Reentry Risk Management for unmanned spacecraft and launch

  • Slides: 8
Download presentation
Re-entry Risk Management for unmanned spacecraft and launch vehicle orbital stages ISO/TC 20/SC 14

Re-entry Risk Management for unmanned spacecraft and launch vehicle orbital stages ISO/TC 20/SC 14 (WD 27875) 17, October 2007 ISO/TC 20/SC 14/WG 3 Akira Kato, Japan 1

History since last meeting • • • • 2007. 06. 08: Comments from DE,

History since last meeting • • • • 2007. 06. 08: Comments from DE, FR and USA 2007. 26: Comments from RU 2007. 08. 10: PL send reply to USA. 2007. 08. 13: PL send reply to RU. 2007. 08. 13: Distribute reply to all comments and new ver. K. 2007. 08. 17: Disribute above to ODCWG. 2007. 09. 18: Comments from USA 2007. 09. 19: PL send reply to USA 2007. 09. 29: Coviner registered version (df) in KAVI. 2007. 10. 02: Secretary send PL version (E)=(df) as editorial correction 2007. 10. 04: PL send secretary request to change “editorial check version” with new version L (reflecting second coments from US, and editorial correction by JPN side. 2007. 10: Covenor deleat version (df) from KAVI. 2007. 10. 11: Dr. Hedly Stokes distributr coments and ver. L to ODCWG. 2007. 10. 12: PL send outline (this paper), comparison between J&K, K&L.

Purpose of the Standard ISO Standards System Safety Risk Management Commercial Company (manufacturers, operators,

Purpose of the Standard ISO Standards System Safety Risk Management Commercial Company (manufacturers, operators, and customers) Launching Country If not, by Voluntary Activities Risk Management to Prevent Causalities Management Plan Safety Assessment of Risk Reduction Casualties on the ground 3

Re-entry risk management Safety Program Organization to perform safety functions Safety programme plan Review

Re-entry risk management Safety Program Organization to perform safety functions Safety programme plan Review System Safety activities 4

Assessment of risk caused by re-entering debris Probabity of Risk Realization Estimation of Risk

Assessment of risk caused by re-entering debris Probabity of Risk Realization Estimation of Risk Casualty limit Risk Senarion and Consequence of Effects Approved Analysis tool and data for survivability determination Imposed by Government or self-restriction Assessment flow 5

START: Survivability Analysis Complete Demise completely demised or survived? Survive > threshold Risk on

START: Survivability Analysis Complete Demise completely demised or survived? Survive > threshold Risk on Human : Threshold < threshold >threshold Effect on the Earth Environment : Threshold <threshold Is the risk reduction possible by design change? possible Impossible Disposal by Natural Decay or Reduction of Orbital Lifetime (uncontrolled re-entry) Controlled Re-entry Design Change Risk Assessment Flow and Disposal Planning 6

Risk reduction measures Option for Risk Reduction Controlled re-entry Structural design to reduce survivability

Risk reduction measures Option for Risk Reduction Controlled re-entry Structural design to reduce survivability Notification 7

Compliance matrix between the main contents of this STD and that of Annex A

Compliance matrix between the main contents of this STD and that of Annex A Clause and subclause of standard Clause and subclause of RRAMP 1 Scope A. 1 Scope 2 Normative references A. 2 Related documents 3 Terms, definitions, abbreviations, and symbols 4 Re-entry risk management 4. 1 Re-entry Safety Program 4. 2 Re-entry Safety Oversight and Management 4. 3 Re-entry risk assessment and mitigation plan A. 3 Re-entry risk management A. 3. 1 Rre-entry Safety Program A. 3. 2 Re-entry Safety Oversight and Management A. 3. 3 Re-entry risk assessment and mitigation plan 5 Risk Assessment 5. 1 General A. 4 Risk Assessment A. 4. 1 General A. 4. 1. 1 Concept of assessment A. 4. 1. 2 Mission description 5. 2 Safety requirements A. 4. 2 Safety requirements 5. 3 Process and resources for analysis A. 4. 3 Process and resources for analysis 5. 4 Estimation of Risk A. 4. 4 Estimation of Risk 5. 5 Risk decision and actions A. 4. 5 Risk decision and actions 6 Risk reduction measures 6. 1 General A. 5 Risk reduction measures 6. 2 Controlled re-entry A. 5. 1 Controled re-entry 6. 3 Structural design measures to reduce re-entry survivability A. 5. 2 Structural design measures to reduce re-entry survivability 6. 4 Notification A. 5. 3 Notification