Recloser Bypass Single Phase Pole Mounted OSHA Required
Recloser Bypass Single Phase Pole Mounted
OSHA Required Tailgate Discussion Topics • Hazards Associate with the job • Work Procedures Involved • Special Precautions • Energy Source Controls • PPE Required
Work Procedures Involved Hazards associated with the job Energy Source Controls Special Precautions Personal Protective Equipment A safe job begins with a thorough inspection of… Be sure to. Tools record your Be certain all of your tools emergency location Be andaware post in ofayour area, be sure to cover arework in good shape. location everyone on the crew anything you can reach touch or fall into. And knows. anything that can reach fall into Equipment Make suretouch youror trucks are you! all in Have your PPE and First Aid kit needed Discuss all PPE for the job and wear your working order take time to preflight available Be toofinspect your equipment prior to use. are your equipment and insure there Working in traffic exposes you to hazards that Slips trips and PPE. falls aresure some the Be sureare your AEDIdentify isto accessible. alllook voltages you are exposed surprise. difficult control. Give vehicles plentyto. Be sure to most common injuries, fornothe all of your protective gear on. time tohave see and avoid you! Follow the hazards of that could cause this. Be. Arc-Flash afor dedicated observer Line/Structure Look over line and structure. Are manual of wear traffic. Identify control yourthe area. sure to inspect and your fall there any potential hazards? (Broken arrest harness. insulators, damaged wire, clearances over roads or from trees? )
Visually inspect the recloser for damage. Look to be sure all of the jumpers are in good shape.
Remove the bypass fuse from the hanger and move it to the bypass cutout.
Close the bypass fuse.
Be sure the bypass is complete.
Open the recloser handle.
Be sure you listened and heard the internal operation.
Install the jumper insulated stand-off.
Remove the source side jumper and place it on the insulated stand-off.
Take the load side jumper down and place it on the system neutral.
Remove the source side jumper from the insulated stand-off and place it on the system neutral.
You can now disconnect the case ground and remove the recloser from the pole.
Install the new recloser and connect the case grounds first. Be sure the control handle is in the open position.
Move the source side jumper to the insulated stand-off.
Connect the load side jumper to the load side line.
Move the source side jumper to the source line.
Remove the insulated stand-off.
Close the recloser control handle.
Open the bypass fuse.
Remove the fuse door. Leaving it hanging open will cause it to fill with contaminants.
Place the bypass fuse back in it’s storage location with the open end down. This will prevent it from filling with contaminants.
The job is complete.