RE 4 Cable & Cooling update Skew clear QC Signal cable path & lengths HV connectors Cable supplies Tower cabling Trigger Cabling Production Rate Installation Scheduling Commissioning Cooling system Cables & Cooling Ian Crotty 20/Nov/12
Skew Clear QC Is working but requires work, including software ( Flavio) install in rack with a new PC etc , to make robust. Test cables waiting in 904. Require space in 904 in the corridor outside AC labs. The signal cable company have been requested to make this test but if they do not like the installation then we must do this. Cables & Cooling Ian Crotty 20/Nov/12
Signal to Chamber cables 864 cables to Manufacture PLASTICAVI 10 samples from 1 drum Skew Limit 1. 5 ns/15 m Skew [ns] TECHNIKABEL Remaining cables from RE 1, 2 & 3 production retested in July 2011. Technikable seem are slightly better. Length is sufficient as we have 23 km in stock and we need 9493 m. But will check stock of Technikable. Cables & Cooling Ian Crotty 20/Nov/12
Paths, Lengths, Labels & DB l e od 3 D M h it w ion es t a egr ervic t n I CS CS ls e b et La p she d a re hs t g n Le Cables & Cooling Ian Crotty 20/Nov/12
Refining 3 D Model for Signal cable length. Constrained Spline calculation Sample cables laid out in P 5, 6 on each endcap Real Cables Laid out in P 5 Agreement between real cables and final 3 D model Cables & Cooling Ian Crotty 20/Nov/12
Grounding star points Cables & Cooling Ian Crotty 20/Nov/12
Cable attachment to chamber RE 4/3 How much space is available ? Do we now have a means to attach the cables ? Cables & Cooling Ian Crotty 20/Nov/12
HV Connector Cable needs are 2. 1 km. In stock are 3. 1 km. 3 pole CPE connector, old design with Stycast potting 144 Cables plus some flying spares to use through out the system for repairs and debugging Cables & Cooling Ian Crotty 20/Nov/12
HV Cable and Connectors Do we continue with this connector or go for the new development. Cable production was started for the sites. We should restart with a more rigorous test (cycling, need script from Stephano) and filtering of connectors before assembly(dimples & light transmission) Cables & Cooling Ian Crotty 20/Nov/12
The Range of Cables Chamber cables • HV cables from patch panel(YE 1) to chamber • LV cables from Caen 3009 (Racks) to chamber • DCS cables from Link Board Crate to chamber • Signal (LVDS) from Chamber to Link Board crate (LBB) • Temperature sensors. Inter rack cabling • LV (48 V) cables from Mao(ACDC) to Easy Crate , Caen 3009 (x 4) • Caen bus communication cables(x 4) from Mao to Easy crate USC/UXC cabling • Branch Controller (LV and Comm. ) to YE 1 PP and YE 1 PP to Mao. • HV, USC/UXC connection is there, had been installed for RE 1/1 Cables & Cooling Ian Crotty 20/Nov/12 All components at CERN
Trigger Cables (& Fibres) • 12 new LBB crates each with 4 LV cables (2. 5 V & 3. 3 V) from the Caen 3016. The cable is in the ISR. • The signal fibres from the LBB to the USC are already in place, only 50%used. • New “Double” fibres (80) are needed from each tower thru’ the Mini Cable Chains to YE 1 Fibre PP. • TTC fibres on YE 3. • Ethernet cable ring on each yoke. • The new LBB will not need the add on regulator with its associated cabling. The Polish expert is Krzysztof Cables & Cooling Ian Crotty 20/Nov/12
HV Connector Cable needs are 2. 1 km. In stock are 3. 1 km. 3 pole CPE connector, old design with Stycast potting 144 Cables plus some flying spares to use through out the system for repairs and debugging Cables & Cooling Ian Crotty 20/Nov/12
Signal to Chamber cables 864 cables to Manufacture PLASTICAVI 10 samples from 1 drum Skew Limit 1. 5 ns/15 m Skew [ns] TECHNIKABEL Remaining cables from RE 1, 2 & 3 production retested in July 2011. Technikable seem are slightly better. Length is sufficient as we have 23 km in stock and we need 9493 m. But will check stock of Technikable. Cables & Cooling Ian Crotty 20/Nov/12
LV Cables • Chamber cabling • Power pole connectors (15/45 & 75 Amp) • Molex connectors • Cable • Rack Cabling • 48 V LV cable from ACDC to (MAO) to Easy crate • 3 phase cable from rear of rack to ACDC. • Branch controller (BC) in S 4 F 03 in USC • 48 V service power to UXC YE 1 PP (x 2) • 48 V service power from YE 1 PP to ACDC on YE 3 thru’ Mini Cable Chains. • Communication from BC to YE 1 PP • Communication from YE 1 PP to ACDC on YE 3 thru’ Mini Cable Chains. • Sergei Lusin’s schematics: http: //rpc-cms-re 4 -upscope. web. cern. ch/rpc-cms-re 4 upscope/RPC/Services/Cable. Over. View/sergy%20 lusin/rack_layout_21 nov 07. pdf Cables & Cooling Ian Crotty 20/Nov/12
Schedule Services installation planned for 13 May-11 July 2013. Access to non IP side YE+3 19 Aug for 26 days Access to non IP side YE-3 30 Sept – 1 Nov Access 2 Oct – 18 Oct on YE+3 Cables to be made by Russian cabling team. Gas & Cooling to be installed by ZEC. We will complete the elements from the bulkheads to the chambers. Details for cooling, gas and cables to be discussed and planned in the TC LS 1 workshop next week. Cables & Cooling Ian Crotty 20/Nov/12
Questions and Conclusions • • • No new cable types so no new CERN approvals required. Plenty of resources will be needed, >1000 cables. The cable space allocated in 904 will be used. Signal cables made with previous company near Neuchatel. QA & QC procedures are understood for each cable type. • All cable types are in drum form, require connectorising, (including procurement of connectors) • Costing will come from full component list. See below. • Full breakdown of cabling needs is being built here: “http: //rpc-cms-re 4 -upscope. web. cern. ch/rpc-cmsre 4 upscope/RPC/Services/Cable. Over. View/ file name “Cables. UXCUSCRE 4. xlsx” • Cables should be ready for installation ~March 2013 • This talk can be seen at; http: //rpc-cms-re 4 -upscope. web. cern. ch/rpc-cms-re 4 upscope/RPC/Services/Cable. Over. View/ Cables & Cooling Ian Crotty 20/Nov/12
Cooling The design is done by Dan from CSC. The provision of components to link the chamber to the Bulkheads is dealt with by Dick Loveless. Piping on chambers supplied by India. Some questions concerning assembly and QC to resolve with Indian colleagues while they are here at CERN. Cables & Cooling Ian Crotty 20/Nov/12
Design of manifolds Manifolds on Yoke perphery Flexible piping from Manifolds make installation rather easy. Cables & Cooling Ian Crotty 20/Nov/12
Cooling Conclusions The cooling is looking fine. Integration done by 904 team. Still necessary to do tests on the Super Module to come up with acceptable leak rates and refine the procedure. ZEC will install the pipe work (Gas & Cooling) on the yoke. RPC community must make the connections from the manifolds to the chambers. Cables & Cooling Ian Crotty 20/Nov/12