QAD Master Scheduling Workbench QAD MSW Carianne Nieuwstraten
QAD Master Scheduling Workbench (QAD MSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC MMUG - 03/22/2010
Agenda 5 MFG/SC - Key Strategic Initiative 5 Master Scheduling Objective & Challenges 5 Workbench Framework Introduction 5 Roadmap 5 Master Scheduling Futures 5 Demo 5 Early Adopter Program 5 Wrap Up QAD Proprietary
Key Strategic Initiative Provide a workbench for each key role in the Manufacturing and Supply Chain areas QAD Proprietary
Master Scheduler’s Objective 5 Establish an item’s most optimum build schedule that meets customer demand – Measurements : • Improved Customer Service – On time deliveries – Reduced back orders • Reduced Inventories – Inventory turns – Reduced inventory investment • Stable Manufacturing Schedule – Increased production efficiency – Reduced set up costs/time – Reduced overtime costs QAD Proprietary
Master Scheduler’s Challenge Executives Finance ROI must improve; the stockholders are not happy! There’s too much cash tied up in inventory! Manufacturing There are too many changes! Provide fixed schedules and the correct parts and delivery will improve. Engineering Sales Service levels are down. I need more inventory! Whatever it takes to keep the customer happy! QAD Proprietary There’s a new product introduction scheduled for the fall! But we need more time for design!
Master Scheduling Challenge QAD Proprietary
Common Planning Situation QAD Proprietary
MSW & PSW Framework Introduction
Planning & Scheduling – Future Flow Period -> Month -> Week -> Day MSW • Initial plan is created by the system • MRP (traditional) • Leveling (new) • GRC (new) Demand Received Demand received -> PSW Production Planned • Balance demand / supply /resources to ensure a feasible and level production plan. -> Interval Base CAC • Sequence production orders by item attributes and resource allocations to Optimize shop floor Production Scheduled CAC M SW PSW Ba se QAD Proprietary Shift -> hour Base Production Dispatched • Verify materials available • Release orders • Print work orders and schedules • Monitor Production & Manage Production Order Production Reported MSW/PSW/CAC Together - Consolidation of 50 maintenance, report and inquiry programs - New capabilities (production scheduling, integrated component checking)
Framework Introduction Master Scheduling (MSW) Scheduling view designed for the purpose of master scheduling QAD Proprietary
Framework Introduction Production Scheduling (PSW) Scheduling view designed for the purpose of production scheduling QAD Proprietary
Framework Introduction Search Panel extracts content for both workbench views Navigator Panel drives content focus of both workbench views Supporting Frames apply seamlessly to both workbench views QAD Proprietary
MSW: Primary Grid-Set Introduction
Capacity Displays information per selected resource/item in the Schedule Grid Schedule Primary context of the workbench. All workbench activity and navigational behavior is driven from this panel Supply/Demand Provides demand & supply context for selected item in the Schedule Grid. Primary information used for scheduling decision making and adjustments QAD Proprietary
User selects the item row in Schedule Grid. Supporting Panels Enables master scheduling action and decision making. Represents over 30 maintenance programs and reports! QAD Proprietary
MSW: Views Create customized workbench layouts
Views Provides ability to create different user defined workbench layouts and save them for quick access Saves Filter/Sort/Group Settings of each Panel QAD Proprietary Saves Panel Size
Example: Created View with Master Scheduling (MSW) and Production Scheduling (PSW) side-by-side QAD Proprietary
MSW Roadmap 2010 2011 2012 2013 2014 2015 Standard Edition June 2010 : QAD 2010 SE release 5 Core Functionality : - Master Scheduling Workbench (MSW) - MSW integrated Component Check Capabilities QAD Proprietary
MSW Roadmap 2010 2011 2012 2013 2014 2015 Enterprise Edition September 2010 : QAD 2010. 1 EE release 5 Core Functionality : - Master Scheduling Workbench (MSW) - MSW integrated Component Check Capabilities QAD Proprietary
Futures: MPS Leveling Calculation …. is a planning tool to aid in the creation of a leveled Master Production Schedule QAD Proprietary
Leveling the Master Schedule QAD Proprietary
QAD MPS Leveling Calculation Solution 5 A customizable batch program that automatically calculates a level MPS for a specified date range by site 5 Batch program output can be viewed, modified and re-leveled in MSW QAD Proprietary
Demo
Master Scheduling Workbench Value 5 Reduces master scheduling time and complexity 5 Provides exception alerts to demand, supply and capacity changes 5 Compresses manufacturing response 5 Ability to simulate changes 5 Enables to be proactive QAD Proprietary
Interested In Being An Early Adopter? 5 Early Adopter Criteria: –. Net use with QAD Enterprise Applications – e. B 2. 1, SP 4 or higher – Using QAD Enterprise Applications Discrete Work Orders or Advanced Repetitive • No or verified customizations – High data integrity/accuracy • BOM’s, inventory records, clean MRP data etc. – Verified business need for MSW, PSW and integrated component check capabilities – Resource availability from May 10 th through around July 12 th • Project Manager, Master Scheduler, Production Scheduler, Material Planner availability – Go live within the May 10 th – July 12 th time period QAD Proprietary
QAD Demo Center 5 MSW and PSW 5 Tuesday, March 23 rd: 8: 30 – 11: 30 am 5 Step through specific business scenarios • You ask, we show 5 Come talk to us! QAD Proprietary
Contact Information 5 Carianne Nieuwstraten E-mail: czn@qad. com Phone: 503 -236 -0025 5 Brent Shooltz E-mail: bws@qad. com Phone: 616 -285 -6617 QAD Proprietary