Proto DUNEII Trial Assembly Frame Proto DUNEII Trial
Proto. DUNE-II Trial Assembly Frame Proto. DUNE-II Trial Assembly William Miller University of Minnesota 1 Feb 18 th Bill's Birthday Ash River Proto. DUNE-II -Documentation
DOCUMENTATION We can’t start any of the Proto. DUNE-II Assembly work without the proper documentation! • Basis of Materials (tracking information for shipments), Assembly drawings, component drawings, 3 -D models • Engineering notes for TPC components • Installation Procedures • Hazard Analysis All this needs to be posted to EDMS and signed off as required. 2 Feb 18 th Bill's Birthday Ash River Proto. DUNE-II -Documentation
Added the start of a folder for HV 3 Feb 18 th Bill's Birthday Ash River Proto. DUNE-II -Documentation
QA format • Jim and Kevin have started a series of documents to try and get the QA/QC and procedure documentation in a similar format • I haven’t looked at it in any kind of detail until now. Clearly not what I was thinking. We need to work with them as move forward to adjust to our needed. 4 Feb 18 th Bill's Birthday Ash River Proto. DUNE-II -Documentation
What we have been using-HA 5 Feb 18 th Bill's Birthday Ash River Proto. DUNE-II -Documentation
What we have been using-HA 6 Feb 18 th Bill's Birthday Ash River Proto. DUNE-II -Documentation
With Installation Procedures 7 Feb 18 th Bill's Birthday Ash River Proto. DUNE-II -Documentation
Proto. DUNE-II Update 8 Feb 18 th Bill's Birthday Ash River Proto. DUNE-II -Documentation
Interface with APA Using existing APA trolly we are ~3 mm low 9 Feb 18 th Bill's Birthday Ash River Proto. DUNE-II -Documentation
10 Feb 18 th Bill's Birthday Ash River Proto. DUNE-II -Documentation
- Slides: 10