Proposed updates to the TGm Work Plan and

  • Slides: 5
Download presentation
Proposed updates to the TGm Work Plan and Schedule IEEE 802. 16 Presentation Submission

Proposed updates to the TGm Work Plan and Schedule IEEE 802. 16 Presentation Submission Template (Rev. 9) Document Number: IEEE C 802. 16 m-07/110 r 3 Date Submitted: 2007 -07 -12 Source: Jose Puthenkulam (jose. p. puthenkulam@intel. com), Sassan Ahmadi (sassan. ahmadi@intel. com), Intel Corporation DS Park (dspark@samsung. com), Hokyu Choi (choihk@samsung. com), Samsung Electronics Ronny Kim (ronnykim@lge. com), LG Electronics, Inc. Shkumbin Hamiti (shkumbin. hamiti@nokia. com), Nokia Mark Cudak (mark. cudak@motorola. com), Scott Migaldi (W 10265@motorola. com), Motorola Venue: IEEE 802. 16 Session #50 San Francisco, OR Base Contribution: Initial TGm Work Plan (802. 16 m-07/001), Initial contributions C 802. 16 m-07/110 and C 802. 16 m-07/112 r 1 Purpose: To assist updating TGm work plan and schedule for the development of 802. 16 m standard Notice: This document does not represent the agreed views of the IEEE 802. 16 Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802. 16. Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: <http: //standards. ieee. org/guides/bylaws/sect 6 -7. html#6> and <http: //standards. ieee. org/guides/opman/sect 6. html#6. 3>. Further information is located at <http: //standards. ieee. org/board/pat-material. html> and <http: //standards. ieee. org/board/pat >. 1

Purpose • The TGm work plan covers the present work items adequately but does

Purpose • The TGm work plan covers the present work items adequately but does not address the following: – System Description Document (SDD) development process and timelines – Keeps the call for proposals open only for 2 meetings which could be considered too short – Needs to add slight updates to the ITU schedule since Cameroon – Also establish clarity between the schedule for the SDD, IMT-Advanced proposal and 802. 16 m amendment development • We propose updates to address the above issues • This contribution also consolidates inputs from TGm contributions 110 and 112 r 1 in Session #49 and updates from Kyoto ITU-R #22 WP 8 F meetings. 2

Motivation The updates proposed consider the following aspects: • The System Description Document (SDD)

Motivation The updates proposed consider the following aspects: • The System Description Document (SDD) can help establish a system view and architecture for the 802. 16 m air interface and is important to develop, but at the same time it should not delay the 802. 16 m draft development • The SDD will also help us develop the initial IMT-Advanced proposals based on the architecture and technical concepts adopted • SDD should help decide about the core technical components and some decisions may have to be made during the amendment development. • Balance can be established by making sure critical design issues are addressed during SDD development • Partial overlap of the work items help us move forward faster and while interdependencies may not be avoided, they can be managed through careful planning and execution 3

Proposed Updates to 802. 16 m-07/001 • On page 2, titled “Documents to be

Proposed Updates to 802. 16 m-07/001 • On page 2, titled “Documents to be developed in TGm”, we proposed adding the work item – System Description Document (SDD) • Architecture and design of the 802. 16 m Air interface amendment • Captures the core technical concepts behind the features included in the amendment • Will enable analysis and/or simulations for characterizing the coarse level performance benefits of the air interface in association with the Evaluation Methodology • Instead of slides 3, 4 and 5 adopt the following slide 5 – To avoid too many work plan (802. 16 m-07/001) updates it is better to keep it high level. So suggest not to keep slides 3 and 4. Decisions can be taken by TGm appropriately at each meeting depending on the development status at the time. – Have reflected latest ITU schedule updates from Kyoto 4

TGm Timelines Updates Q 2 IEEE 802. 16 System Requirements IEEE 802. 16 m

TGm Timelines Updates Q 2 IEEE 802. 16 System Requirements IEEE 802. 16 m Evaluation Methodology System Description IMT Advanced Proposal 802. 16 m AmendmentŦ 2007 Q 3 Q 4 2008 Q 2 Q 3 Q 1 Q 2 2009 Q 3 Q 4 Q 1 2010 Q 2 Q 3 Q 4 Jul ’ 07* Call for Proposals for SDD issued in July ‘ 07 Sep ’ 07* Sep ’ 07 Call for Proposals for 802. 16 m Text issued in Jan ‘ 08 Jul 08* Mar ’ 08 Oct ’ 08 Initial proposal Mar ’ 08 Sep ’ 08 Jan ’ 08 May ’ 08 IMT-Advanced Work. Shop ITU-R IMT Advanced Circular Letter May ’ 09* Final Proposal Refinements May ’ 09 Letter Ballot Working Doc Jan ’ 08 IMT. RADIO Q 1 Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec IMT. TECH IMT. EVAL Q 4 Dec ’ 09 Sponsor Ballot ITU based Updates Oct ’ 08 May ’ 09 Proposal Submission Jan ’ 10 Preliminary Evaluation Proposal Evaluation May ’ 10 Consensus Building/Revision of Proposals ITU-R WP 8 F Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec *System Requirements and Evaluation Methodology, System Description, IMT-Advanced Proposal Documents may be further updated based on ITU output (shown by dotted lines). Ŧ 802. 16 m amendment is dependent on the 802. 16 Rev 2 Project completion 5