Project Plan Presentation Eureka Team Ayesha Al Qubaisi
Project Plan Presentation Eureka Team : Ayesha Al. Qubaisi 2786 Shamma Al. Shehhi 2609 Khadeeja Alyazedi 2931 Dana Al Sulaimani 2569 Instructors: Dr. Jamal Ahmad Dr. David Moore
Research and Data Analysis Leadership Experienced in Multimedia Programs CAD and Designing Qualified? 2 Critical thinking Problem analysis Time Management
Outline • Introduction • Background • Project statement • Project Method • Project management plan – Project tasks – Project schedule – Resources assignment – Project tracking • Project budget • Milestones • Conclusion
Introduction • purpose of project: – Improve mechanical aptitude , knowledge of manufacturing process , materials and material selection – Appreciation for the ergonomics in product design – How customer needs are translated to product functions that are then converted into commercial products. • Stakeholders and participants – Client – Users – Designers • Scope of Project proposal – Apply modifications to RC plane – Maximize functionality with less cost & improvement on weight , portability , and ergonomics.
Background
Electric RC planes Small size Small motor Limited Controlling Fuel RC plane Engine RC plane
Chosen Design Components : 1. Power system • • R/C motors Battery Electrical speed control (ESC) Wiring 2. Fuselage 3. Landing gear 4. Propeller 5. Recharger 6. Spinner propeller 7. Transmitter 8. Wings Features: • • • 2 -Channels 180 m wireless Charging time 20 min. Playing time : 1520 min Size : 51 x 71 cm
Project statement Ø Portable Ø Ergonomics Ø Durable Ø Economics
Research themes Aviation history Types of RC airplane parts and controls Fundamental concepts of designing RC airplane
Project Method 1. Product Selection 2. ü Mechanical or electro/mechanical in nature q Perform pre-dissection analysis ü Minimum of 10 major components q Document product ü Contains moving parts q Analyze product ü Made from a variety of materials q Improve product ü Can be easily disassembled and assembled ü Offers the opportunity for improvement Dissection q Dissect product q Communicate findings
Project Plan Project tasks Project schedule Resources assignment Project tracking 12
Project tasks • Breakdown structure Redesign RC airplane Understand the project Clarify Project Statement Background Project management Analyze Function Requirements Function Analysis Constructing conceptual design Evaluate Alternatives Process Develop Weights Make initial Selection Dimension s Draft Final For Objectives Review with Client Specificati ons Review with stresses Final Report/Poster Develop Pair wise Function Morph Chart Comparison Develop Function Generate Review Results Research consumer Mean Tree Functions List With Client Develop Initial Match Means Options Objectives Document Design ideas Brainstorm on Means Set Detailed Design Brainstorm Research Needs Preliminary Design Project Management Activities Report Client to Function Development of Project Plans Monitoring Progress Weekly Meetings Progress Reports For Client
Project schedule
Linear Responsibility Chart • Used to show each team member’s responsibilities per task Shamma Ayesha khadeeja dana Client Project Overview 2/5 1 2 2 4 Gathering Data 5 2 1 4 Dissection and analysis 1 4 4 4 Using data 5 1 2 4 Course derivable 3 3 4 2 Team meetings 3 4 2 1 KEY: 1: Primary Responsibility 2: Support Work 3: Must Be Consulted 4: May Be Consulted 5: Review 6: Final Approval 3
Project tracking • Percent Complete Matrix (PCM) helps keep track of how much of the work is completed
Budget Requirement cost Problem Definition 20 hrs x DHS 500 10000 DHS Conceptual Design 21 hrs x DHS 500 10500 DHS Preliminary Design 7 hrs x DHS 500 3500 DHS Detail Design 30 hrs x DHS 500 15000 DHS Computer labs Available in PMDC offices CAD Program Available in PMDC offices Martials needed Labor DHS 500 DHS 2 Senior (2*150) 500 DHS 2 Junior (2*100) Total: 40000 DHs
Project Deliverables Milestones Deadline Project Plan Presentations 11 -10 -2011 Project Plan Report 11 -10 -2011 Dissection report 30 -10 -2011 Detail design and documentation 27 -11 -2011 Final design and poster presentations 18 -12 -2011
Conclusion Project overview Project statement Project management plane Budget Deliverables
: 10 00 01 02 03 04 05 06 07 08 09 Any Questions!!