Project IEEE 802 15 Working Group for Wireless
- Slides: 18
Project: IEEE 802. 15 Working Group for Wireless Personal Area Networks (WPANs) July 2002 doc. : IEEE 802. 15 -02/262 r 1 Submission Title: [WG-TG 3 closing Report July 02] Date Submitted: [12 July 02] Source: [John Barr] Company [Motorola] Address [1303 E. Golf Road, Schuamburg, IL 60196] Voice: [+1 847 576 -8706], FAX: [+1 847 576 -6758], E-Mail: [John. Barr@Motorola. com] Re: [02246 r 6 P 802 -15_TG 3 -July 02 -Meeting-Objective-and-Agenda. xls] Abstract: [TG 3 Chair Report to 802. 15 WG] Purpose: [TG 3 chair report to WG to update them on work completed in Vancouver. ] Notice: This document has been prepared to assist the IEEE 802. 15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by 802. 15. Submission 1 Dr. John R. Barr, Motorola
July 2002 doc. : IEEE 802. 15 -02/262 r 1 802. 15 IEEE 802. 15 Working Group for Wireless Personal Area Networks TG 3 Closing Report July 2002, Vancouver, BC Canada Submission 2 Dr. John R. Barr, Motorola
July 2002 doc. : IEEE 802. 15 -02/262 r 1 Agenda • • • Goals of July Meeting Letter Ballot Status Motion for Recirculation Letter Ballot August 6 -8 Ad hoc Meeting Goals for September Meeting Submission 3 Dr. John R. Barr, Motorola
July 2002 doc. : IEEE 802. 15 -02/262 r 1 Goals for July 1. Conference call status, including approval of any ad hoc business. 2. Letter Ballot Comment resolution • Ex. Com Sponsor Ballot Prep (Letter Ballot) • Will need WG motion to authorize forwarding to Ex. Com • White paper clarifying coexistence methods supporting our PAR • Update Draft as Required (D 11) • Ballot Recirculation Submission 4 Dr. John R. Barr, Motorola
July 2002 doc. : IEEE 802. 15 -02/262 r 1 LB 12 Results • • • 75 out of 89 voters returned a ballot 41 voted yes (66. 1 %) 21 voted no (33. 9 %) 4 abstained (6. 1 % of total votes) 58 resolved yes (93. 5 %) 4 unsatisfied resolution (6. 5 %) Submission 5 Dr. John R. Barr, Motorola
July 2002 doc. : IEEE 802. 15 -02/262 r 1 LB 12 No Voter Status Submission 6 Dr. John R. Barr, Motorola
July 2002 doc. : IEEE 802. 15 -02/262 r 1 LB 17 Results June 12 – July 2 • • • 75 out of 89 voters 64 voted yes (87. 7 %) 9 voted no (12. 3 %) 2 abstained (2. 7 % of total votes) Participation (84. 3 %) Submission 7 Dr. John R. Barr, Motorola
July 2002 doc. : IEEE 802. 15 -02/262 r 1 LB 17 Comment Status Submission 8 Dr. John R. Barr, Motorola
July 2002 doc. : IEEE 802. 15 -02/262 r 1 LB 12 – LB 17 Comparison Submission 9 Dr. John R. Barr, Motorola
July 2002 doc. : IEEE 802. 15 -02/262 r 1 LB 17 Comment Resolution Process • Ballot Resolution Committee Formed – Parallel comment resolution in Vancouver – Email comment resolution until ad hoc – August 6 -8 ad hoc meeting • Major Issues Resolved in Vancouver – Security Suite will have multiple options (no mandatory) • Mode 2 (ECMQV, Ntru. Encrypt-251, RSA 1024) • Mode 3 (ECMQV Implicit and X. 509, RSA 1024 X. 509) – Power Save (ALMOST) • Editorial comments to be resolved by editor • 15 -day recirculation prior to September interim Submission 10 Dr. John R. Barr, Motorola
July 2002 doc. : IEEE 802. 15 -02/262 r 1 802. 15. 3 Ballot Resolution Committee • Chair: James P. Gilb, Ph. D. • Members: – – – – Submission Jim Allen Jay Bain John Barr Al Heberling Bob Huang Jeyhan Karaoguz Mark Schrader Bill Shvodian 11 Dr. John R. Barr, Motorola
July 2002 doc. : IEEE 802. 15 -02/262 r 1 Next Steps • Bi-Weekly Conference Calls • • • – 10 AM C(hair)DT Tuesdays starting July 23 Resolve comments and prepare for second recirculation Start sponsor ballot pool preparation Resolve comments and prepare for final recirculation during September interim Meeting. Final comment resolution and preparation for sponsor ballot at November plenary Meeting. Party in Hawaii!!! Submission 12 Dr. John R. Barr, Motorola
July 2002 doc. : IEEE 802. 15 -02/262 r 1 Motion to Authorize Recirculation Ballot • Motion: Authorize 802. 15 TG 3 20 -day recirculation letter ballot following BRC completion of comment resolution for LB 17. Starts August 16 and ends September 5. • TG 3 Motion–Allen, 2 nd –Gilb, Passed - UConsent • Moved: Jim Allen • Second: James Gilb • Vote: yy/nn/aa Motion xxxx Submission 13 Dr. John R. Barr, Motorola
July 2002 doc. : IEEE 802. 15 -02/262 r 1 Goals for September • Conference call status, including approval of any ad hoc business. • Letter ballot comment resolution. • Update draft as required. • Recirculation ballot. Submission 14 Dr. John R. Barr, Motorola
July 2002 doc. : IEEE 802. 15 -02/262 r 1 August 6 -8 Ad Hoc Meeting • Sponsored by Motorola, Schaumburg, IL • 8 AM August 6 through 3 PM August 8 • Objectives: – BRC comment resolution – Editing of draft for recirculation Submission 15 Dr. John R. Barr, Motorola
July 2002 doc. : IEEE 802. 15 -02/262 r 1 Publicity Committee Input • Major revision of IEEE 802. 15. 3 draft standard prepared for evaluation by the 802. 15 Working Group. • Successful letter ballot with 88% approval. • Initial comment resolution performed with resolution of last major issues remaining prior to sponsor ballot. • IEEE 802. 15. 3 expected to be released for sponsor ballot in November, 2002. Submission 16 Dr. John R. Barr, Motorola
July 2002 doc. : IEEE 802. 15 -02/262 r 1 Over the Brink Submission 17 Dr. John R. Barr, Motorola
July 2002 doc. : IEEE 802. 15 -02/262 r 1 So many ways to go Submission 18 Dr. John R. Barr, Motorola
- Bridges from 802.x to 802.y
- Bridges from 802.x to 802.y
- 802-11-wireless-security
- Wireless lan 802
- Gast 802 11 wireless networks "torrent"
- Ieee 802 que es
- 802 ieee
- Ieee 802 family
- Ieee802.22
- Ieee 802 standard
- Ieee 802
- Ieee 802 3 compliance
- Arquitetura ieee 802
- Ieee 802 bluetooth
- Telecommunications the internet and wireless technology
- Project 802 in data communication network
- Project 802
- Smart vs hard working
- Hot and cold working process