SBE_09 -HOT SPOT SUMMARY KPI Meet Target Only Fail All Celcom #1 Download average throughput 10 0 9 Upload average throughput 10 0 8 CSFB call setup success rates 10 0 10 CSFB Call setup time 0 10 0 Reselection time back to LTE (after CSFB) 9 1 7 Vo. LTE Call setup success rate NA NA NA MOS (Open mode) NA NA NA Vo. LTE Call drop NA NA NA Circuit switch drop call due to RF 10 0 10 Circuit switch block call due to RF 10 0 10 Zero Buffering on You. Tube 10 0 10 10 0 9 Popular Web Pages loaded in 3 s for file less than 1 Mbyte 10 0 9 Popular Web Pages loaded in 5 s for file more than 1 Mbyte and less than 3 MByte 10 2 7 Latency 10 0 10 Minimum of 3 /5/7 Mbps Download Speeds as per design target Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 2
SBE_09 -HOT SPOT SUMMARY 60. 00 L 18 L 26 60. 00 L 18 Hotspot #5 20. 00 Hotspot #7 (No. 1) 0. 00 (No. 1) 60. 00 L 18 L 26 GSM 40. 00 20. 00 Hotspot #1 0. 00 Hotspot #6 40. 00 (No. 1) 20. 00 30. 00 L 18 L 26(C L 26 A) GSM 60. 00 Hotspot #4 Hotspot #2 40. 00 20. 00 L 18 L 26 NA GSM L 18 L 26 GSM L 18 W 21 L 26 GSM 20. 00 (No. 1) 0. 00 NA 40. 00 (No. 1) 20. 00 10. 00 L 26 0. 00 (No. 1) 40. 00 L 18 L 26 GSM 40. 00 60. 00 No. 1 in 9 out of 10 HOTSPOTS L 26 GSM 0. 00 Hotspot #3 L 26 GSM (No. 1) Hotspot #10 40. 00 (No. 2) Poor coverage 20. 00 100. 00 50. 00 L 26 GSM Hotspot #9 Hotspot #8 (No. 1) 20. 00 Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 3 40. 00 Celcom Maxis Di. Gi U-Mobile 0. 00 L 18 GSM
HOTSPOT_1
SBE-09 -HOT spot 1 OVERVIEW DL Info Value Tech LTE(RL 10533_8_1) S 093 G_S 00794 OD_UMSCHANSELLORY 2 Distance from Serving Site 0. 114 KM Coverage RSRP=-80. 92 SINR=16. 08 Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 5 UL
SBE-09 -HOT spot 1 SUMMARY Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 6
Analysis for DL/UL Throughput Analysis • HT 1 is served by RL 10533_8_1 • RSRP=-80. 92 SINR=16. 08. • DL/UL THP are better than design • DL/UL are #1 compared with other operators Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 7
Competitive Info & Analysis during Speed test Tech THP DL CA, L 26, L 18, W 9, W 21, GSM Coverage Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 8 Celcom Maxis Di. Gi U-Mobile L 18 L 26 GSM Capacity /PRB
CSFB Call Setup Time › From the below list, the CSFB Call Setup Time all >5 s, but most of them within 7 s. Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 9
HOTSPOT_2
SBE-09 -HOT spot 2 OVERVIEW DL UL Info Value Tech LTE(RL 10537_8_1) S 093 G_S 00796 OD_UMSFAKULTIBUILDING Distance from Serving Site 0. 24 KM Coverage RSRP=-86. 40 SINR=10. 68 Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 11
SBE-09 -HOT spot 2 summary Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 12
Analysis for DL/UL Throughput Analysis • HT 2 is served by RL 10537_8_1 • RSRP=-86. 40 and SINR=10. 68. • DL/UL THP are better than design • DL are #1 compared with other operators. Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 13
Competitive Info & Analysis during Speed test Tech THP DL CA, L 26, L 18, W 9, W 21, GSM Coverage Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 14 Celcom Maxis Di. Gi U-Mobile L 18 L 26(CA) L 26 GSM Capacity /PRB
CSFB Call Setup Time › From the below list, the CSFB Call Setup Time all >5 s, but most of them within 8 s. Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 15
HOTSPOT_3
SBE-09 -HOT spot 3 OVERVIEW DL UL Info Value Tech LTE(RL 10195_8_3) S 093 G_S 00603 OD_ALAMMESRA Distance from Serving Site 0. 11 KM Coverage RSRP=-66. 33 SINR=19. 88 Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 17
SBE-09 -HOT spot 3 summary Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 18
Analysis for DL/ul Throughput Analysis • HT 3 is served by RL 10195_8_3 RSRP=-66. 33 and SINR=19. 88 DL/UL thp are better than design DL/UL are #1 compared with other operators Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 19
Competitive Info & Analysis during Speed test THP DL Tech CA, L 26, L 18, W 9, W 21, GSM Coverage Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 20 Celcom Maxis Di. Gi UMobile L 18 W 21 L 26 GSM Capacity /PRB
CSFB Call Setup Time › From the below list, the CSFB Call Setup Time all >5 s, but most of them within 8 s. Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 21
HOTSPOT_4
SBE-09 -HOT spot 4 OVERVIEW DL UL Info Value Tech LTE(RL 10628_8_3) S 093 G_S 00824 OD_UMSSPORTCOMPLEX Distance from Serving Site 0. 357 KM Coverage RSRP=-74. 10 SINR=14. 61 Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 23
SBE-09 -HOT spot 4 summary Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 24
Analysis for DL Throughput Analysis • HT 4 is served by RL 10628_8_3 RSRP=-74. 10 and SINR=14. 61 DL/UL thp are better than design DL/UL are #1 compared with other operators Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 25
Competitive Info & Analysis during Speed test THP DL Tech CA, L 26, L 18, W 9, W 21, GSM Coverage Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 26 Celcom Maxis Di. Gi UMobile L 18 L 26 GSM Capacity /PRB
CSFB Call Setup Time › From the below list, the CSFB Call Setup Time all >5 s, but most of them within 8 s. Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 27
HOTSPOT_5
SBE-09 -HOT spot 5 OVERVIEW DL UL Info Value Tech LTE(RL 10643_8_1) S 093 G_S 00952 OD_UMSKGA Distance from Nearest Site Coverage 0. 14 KM RSRP=-70. 86 SINR=18. 25 Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 29
SBE-09 -HOT spot 5 summary Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 30
Analysis for DL/ul Throughput Analysis: • HT 5 is served by RL 10643_8_1. RSRP=-70. 86 and SINR=18. 25 DL/UL thp are better than design DL/UL are #1 compared with other operators Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 31
Competitive Info & Analysis during Speed test THP DL Tech CA, L 26, L 18, W 9, W 21, GSM Coverage 25. 0 -100. 0 20. 0 -80. 0 15. 0 -60. 0 10. 0 -40. 0 5. 0 0. 0 -20. 0 Maxis SINR Di. Gi Maxis Di. Gi UMobile L 18 L 26 GSM Capacity /PRB RSRP&SINR Celcom U-Mobile RSRP Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 32
CSFB Call Setup Time › From the below list, the CSFB Call Setup Time all >5 s, but all of them within 8 s. Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 33
HOTSPOT_6
SBE-09 -HOT spot 6 OVERVIEW DL UL Info Value Tech LTE(RL 10645_6_1) S 093 G_S 00954 OD_UMSKGE Distance from Nearest Site 0. 743 KM Coverage RSRP=-74. 61 SINR=22. 87 Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 35
SBE-09 -HOT spot 6 summary Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 36
Analysis for DL Throughput Analysis • HT 6 is served by RL 10645_6_1 RSRP=-74. 61 and SINR=22. 87 DL/UL THP are better than design DL/UL are #1 compared with other operators Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 37
Competitive Info & Analysis during Speed test Tech THP DL CA, L 26, L 18, W 9, W 21, GSM Coverage 30. 0 -90. 0 -80. 0 -70. 0 -60. 0 -50. 0 -40. 0 -30. 0 -20. 0 -10. 0 25. 0 20. 0 15. 0 10. 0 5. 0 0. 0 Maxis SINR Di. Gi Maxis Di. Gi UMobile L 26 GSM Capacity /PRB RSRP&SINR Celcom U-Mobile RSRP Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 38
CSFB Call Setup Time › From the below list, the CSFB Call Setup Time all >5 s, but all of them within 8 s. Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 39
HOTSPOT_7
SBE-09 -HOT spot 7 OVERVIEW DL UL Info Value Tech LTE(RL 10644_8_1) S 093 G_S 00953 OD_UMSKGC Distance from Nearest Site 0. 06 KM Hammer Project PC_SBE_09 CBO | Commercial in confidence. SINR=17. 28 | © Ericsson AB 2016 | 2016 -08 -26 | Page 41 Coverage RSRP=-66. 18
SBE-09 -HOT spot 7 summary Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 42
Analysis for DL Throughput Analysis • HT 7 is served by RL 10644_8_1 • DL/UL thp are better than design. • UL thp is #1 and DL thp is #2 compared with other operators is due to the PRB of Celcom less than Maxis. Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 43
Competitive Info & Analysis during Speed test THP DL Tech CA, L 26, L 18, W 9, W 21, GSM Coverage 20. 0 18. 0 16. 0 14. 0 12. 0 10. 0 8. 0 6. 0 4. 0 2. 0 0. 0 -100. 00 -90. 00 -80. 00 -70. 00 -60. 00 -50. 00 -40. 00 -30. 00 -20. 00 -10. 00 Maxis SINR Di. Gi Maxis Di. Gi U-Mobile L 18 L 26 GSM Capacity /PRB RSRP&SINR Celcom U-Mobile RSRP Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 44
CSFB Call Setup Time › From the below list, the CSFB Call Setup Time all >5 s. But most of them within 8 s. Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 45
HOTSPOT_8
SBE-09 -HOT spot 8 OVERVIEW DL UL Info Value Tech LTE(RL 20054_8_2) S 093 G_S 01148 OD_TMNRAJAUDANG Distance from 0. 23 KM Nearest Site Coverage RSRP=-83. 25 SINR=15. 18 Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 47
SBE-09 -HOT spot 8 summary Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 48
Analysis for DL Throughput & Reselection time Analysis › HT 8 is served by RL 20054_8_2 RSRP=-83. 25 and SINR=15. 18 DL/UL THP are better than design DL/UL are #1 compared with other operators Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 49
Competitive Info & Analysis during Speed test THP DL Tech CA, L 26, L 18, W 9, W 21, GSM RSRP&SINR 25. 0 -120. 00 20. 0 -100. 00 -80. 00 15. 0 -60. 00 10. 0 -40. 00 5. 0 -20. 00 Maxis SINR Di. Gi Maxis Di. Gi U-Mobile L 18 GSM Capacity /PRB Coverage Celcom U-Mobile RSRP Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 50
CSFB Call Setup Time › From the below list, the CSFB Call Setup Time all >5 s, but most of them within 9 s. Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 51
HOTSPOT_9
SBE-09 -HOT spot 9 OVERVIEW DL UL Info Value Tech LTE(RL 10274_8_3) S 093 G_X 00045 OD_RAMOKINGFISHER Distance from Nearest Site 0. 063 KM Coverage RSRP=-78. 90 SINR=9. 72 Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 53
SBE-09 -HOT spot 9 summary Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 54
Analysis for DL/ul Throughput Analysis › HT 9 is served by RL 10274_6_3 RSRP=-78. 90 and SINR=9. 72 DL/UL THP are better than design DL/UL are #1 compared with other operators Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 55
Competitive Info & Analysis during Speed test THP DL Tech CA, L 26, L 18, W 9, W 21, GSM Coverage 25. 0 -100. 0 -90. 0 20. 0 -80. 0 -70. 0 15. 0 -60. 0 -50. 0 10. 0 -40. 0 -30. 0 5. 0 -20. 0 -10. 0 Maxis SINR Di. Gi Maxis Di. Gi U-Mobile L 26(CA) L 26 GSM Capacity /PRB RSRP&SINR Celcom U-Mobile RSRP Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 56
CSFB Call Setup Time › From the below list, the CSFB Call Setup Time all >5 s, but most of them within 8 s. Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 57
HOTSPOT_10
SBE-09 -HOT spot 10 OVERVIEW DL UL Info Value Tech LTE(RL 10468_8_1) S 093 G_S 00407 OD_FEDERALGOVBUILDING Distance from Nearest Site 0. 41 KM Coverage RSRP=-76. 28 SINR=17. 56 Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 59
SBE-09 -HOT spot 10 summary Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 60
Analysis for DL/UL Throughput Analysis: › HT 10 is served by RL 10468_8_1 RSRP=-76. 28 and SINR=17. 56 DL/UL thp are better than design DL/UL are #1 compared with other operators Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 61
Competitive Info & Analysis during Speed test THP DL Tech CA, L 26, L 18, W 9, W 21, GSM Coverage 14. 0 -100. 0 -90. 0 -80. 0 -70. 0 -60. 0 -50. 0 -40. 0 -30. 0 -20. 0 -10. 0 12. 0 10. 0 8. 0 6. 0 4. 0 2. 0 0. 0 Maxis SINR Di. Gi Maxis Di. Gi U-Mobile L 18 L 26 GSM Capacity /PRB RSRP&SINR Celcom U-Mobile RSRP Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 62
CSFB Call Setup Time › From the below list, the CSFB Call Setup Time all >5 s, but most of them within 8 s. Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 63
Csfb Call setup time analysis
Setup Time Calculation Start Waiting CN Way Of KPI Calculation : Start Stamp: Extended Service Request End Stamp : Message “Alerting” Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 65
Case Analysis _ LUR During call, Location Update Request is found as following, speech call need to wait the LUR finish then go on Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 66
Case Analysis _ Cell Reselect During call, cell reselection is happening at the beginning time, speech call need to wait to camp on new cell then can go on Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 67
Analysis _ Reselect to 3 G at poor coverage Some calls happened at the 3 G poor coverage that cause it will took longer time during the progress of reselect to 3 G. As following, that cause the handover, then will update routing area. Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 68
Case Analysis _ Poor Coverage Below call take 14 s from ‘extended service request’ to ‘Alerting’ , and only take 2 s release from 4 G, handover is found on GSM that will delay the setup time. Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 69
Case Analysis _ Waiting CN Few calls will take longer time during the progress waiting CN, that is more affected by the behavior or status of MT user Waiting CN near 4 s End Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 70
Case Analysis _ Waiting CN Few calls will take longer time during the progress waiting CN, that is more affected by the behavior or status of MT user Waiting CN near 4 s End Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 71
Further action & investigation • Moving forward to improve the CSFB setup time: • To evaluate feature Cs. Prio. At. Csfb. From. Lte, (priority given to CS call) • To evaluate feature RIM (RAN INFORMATION MANAGEMENT) • To evaluate feature DMCR (DEFFERED MEASUREMENT CONTROL READING) Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 72
Hammer Project PC_SBE_09 CBO | Commercial in confidence | © Ericsson AB 2016 | 2016 -08 -26 | Page 73