Project Case Work on Integrated Pollution Prevention and

































- Slides: 33
Project Case Work on Integrated Pollution Prevention and Control 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Funded by: Organized by: Carl Duisberg Gesellschaft (CDG) South East Asia Program Office Bangkok, Thailand Dr. C. Visvanathan Environmental Engineering Division Asian Institute of Technology Bangkok, Thailand Next Visu
PCW Training Crew Next Visu
CDG-SEAPO/EEP – AIT Training Workshop on IPPC 1 - 4 May, 1995 Next Visu
PCW Training Clips Project Case Work Approach A peek from the conference hall Integrated Waste Management Trainers Visu
Multidisciplinary Participants • 25 graduate students from various fields of study (AIT); – Environmental Engineering ( 5 students) – Energy Technology ( 5 students) – School of Management ( 5 students) – Industrial Engineering ( 5 students) – Human Settlement Division ( 5 students) Next Visu
Student Selection Criteria • Different academic background (to represent an industry) • Different Nationality • Gender Balance • Interview by the Funding Agency (CDG) Next Visu
Role of Trainer • Serves more as; – Facilitator – Technical advisor – Catalyst of learning • Rather than; – Lecturers – Story-tellers – Instructors Next Visu
Baseline information Problem Statement Group 1 PCW Approach Q&A Group 1 Q&A Group 2 Group 3 Group 4 Trainer Presentations Group 2 Group 3 Presentations Solution Brain Storming Group 4 Trainer Evaluation & Consultancy Restructuring Evaluation & Consultancy Back Visu
Integrated Waste Management Education Through Project Case Work Approach Introduction • Rapid Industrialization • Limited assimilative capacity of the receiving body • Industrial Pollution • Cradle–to–Grave Responsibility Next Visu
Integrated Approach • Traditional Approach > EOP Waste Treatment • Even, Pollution Prevention/ CP > No Total Elimination • Integrated Approach: EOP + CP > Appropriate Solution • In need of Integrated Approach Next Visu
Training of Integrated Approach • Multidisciplinary approach • Multidisciplinary inputs • Real life situation/ should revolve near real life situation • Working under pressure to solve a problem • Working under a team: Handling Idea Generators/ Killer/ Implementers Next Visu
Case Study • Management committee of Super Shine Thai Ltd. Faces an unrelenting threat from Pollution Control Department (PCD). • Their industrial license will be cancelled within two months unless its wastewater meets Industrial Wastewater Discharge (IWD) discharge standards, i. e. ‘Electroplating shop has to be closed down within a period of two months’. • Management committee in panic situation and calls for their senior staff consisting of; Ø Chief Executive Officer, Plant Manager, Environmental Manager, Chief Engineer, Veteran Electroplater, Utility and Energy Manager – They were given three days to solve the problem: This is the background of the presented PCW training Next Visu
List of Games • Plant layout Game – The group with the best layout in terms of improved production efficiency and reduced environmental impact will be the winner. • Degreasing Solvent Selection Game – The group with the best washing efficiency and the best washing efficiency will be the winner. • Rinsing Game – The group carrying out the best quality rinsing with the least cost will be the winner. Next Visu
Sample of PCW Training Schedule (Day 2) Morning: • Video on Electroplating Process • Assessing Plant information (Collect available data and inspect site, Establish Priorities and problem area) • Group Work • Material Balance and Identifying IPPC Options (Material balance methodology, Generate options, Screen options, Balancing Pollution Prevention and Pollution Control) • Video: Competitive edge • Group Work Afternoon: • Interim Presentation by each group on Material Balance Exercise • Pollution Control and Material Recovery Technologies • Video: Money Down the Drain • Group work + Software Demonstration: Waste Reduction Advisory System by USEPA • Management Issues in IPPC- Time and Motion Studies, Line Balancing Techniques etc. • Group Work Post Dinner Session: • Pollution Prevention Game 2 – Oily Washers Game Menu Visu
PCW Training Clips Problem statement and baseline information Demonstration of electroplating mechanism Teamwork ‘ Different Strategy’ Midnight Strategic Planning Intermediate Presentations Q & A session after presentation Prize distribution Final Presentations Lighter moments Back to AIT Menu Visu
Dr. C. Visvanathan Demonstrating the Electroplating Process Environmental Hazards Waste Minimization Options Common Problems Involved Various Processes Involved PCW Clips Visu
Learning by Doing ‘Different Strategy’ Teamwork Group 1 Group 2 Click & Watch Highly Educative and Enjoyable Next Visu
Learning by Doing ‘Different Strategy’ Group 3 Group 4 Click & Watch Near to real life scenario PCW Clips Pressure of time Visu
Baseline information about: EOP waste treatment Pollutions Preventions Cleaner Production Present scenarios PCW Clips Visu
Lead Trainers: Prof. P. Modak Indian Institute of Technology Mumbai, India Dr. C. Visvanathan Environmental Engineering Division Asian Institute of Technology Bangkok, Thailand Watch Training of trainers Menu Visu
Q & A Session After Presentation PCW Clips Visu
Final Presentations Click & Watch Next Visu
Final Presentations Click & Watch PCW Clips Visu
Midnight Strategic Planning PCW Clips Visu
Trainer: Prof. P. Modak Back Visu
A Peek From Conference Hall Menu PCW Training wishes an Idyllic and Serene Environment Visu
Lighter Moments PCW Clips Visu
Intermediate Presentations Click & Watch Next Visu
Intermediate Presentations Click & Watch PCW Clips Visu
Prize Distribution PCW Clips Visu
Training of Trainers One Dimensional Learning Universities to Three Dimensional Learning of PCW Back Visu
Trainer: Dr. C. Visvanathan Back Visu
Photo Session PCW Clips Visu