Rikoti-Zestaponi Highway Project Description (Regional Criteria) • TRACECA route - Tbilisi-Senaki. Leselidze international road

Rikoti-Zestaponi Highway Project Description (Regional Criteria) • TRACECA route - Tbilisi-Senaki. Leselidze international road • Directly Interconnects – 4 countries (Georgia, Turkey, Armenia, Azerbaijan) • Suggested project is the to upgrade existing road from 2 lines to 4 lines and construction new road on some sections. • Road section located on Poti-Tbilisi-Red Bridge road (part of TRACECA) in the Imereti region, connecting western and eastern regions, regions ensuring transit traffic via Georgia to/from Turkey, Azerbaijan and Armenia. This road section sill ensure connectivity with the Black Sea Ports (Poti Sea Port, Batumi Sea Port) and notable impacts on Inter-modality of the region. 9/5/2021 Ministry of Regional Development & Infrastructure of Georgia 3

Project’s Technical Characteristics Widening (upgrading) Highway from 2 lane to 4 lane • Total

Project’s Technical Characteristics Widening (upgrading) Highway from 2 lane to 4 lane • Total Length – 49 km • Existing Capacity – 7 000 vehicles per day • Artificial Constructions (in accordance with the Feasibility Study) – Bridges – 5695 m – Tunnel – 5115 m – Transport Nodes – 11 unit • Existing Lanes – 2 • Lanes After Construction – 4 9/5/2021 Ministry of Regional Development & Infrastructure of Georgia 4

Technical Characteristics Existing Road Section Rikoti-Zestaponi Lanes Length (km) Max Speed (km/h) 2 49

Technical Characteristics Existing Road Section Rikoti-Zestaponi Lanes Length (km) Max Speed (km/h) 2 49 80 Proposed Road Min Speed (km/h) Design Capacit y (Vehicle / day) Max Capacity (Vehicle / day) Lanes 50 7 000 4 Length (km) Max Speed (km/h) Min Speed (km/h) Design Capacity (Vehicle /day) Max Capacit y (Vehicle /day) 43 110 80 40000 Note: Topography on the whole section is – terrain Daily Traffic PROJECTS AADT (2010 year) Private Car Vehicle per day 9/5/2021 5, 106 Mini Buses<15, Pickups 1, 0673 Buses & Trucks 543 Ministry of Regional Development & Infrastructure of Georgia Trailers & > 3 axels 778 Sum 7, 494 5

Road Safety • Project implementation is part of Georgian National Traffic Safety Strategy •

Road Safety • Project implementation is part of Georgian National Traffic Safety Strategy • Can ensure high road capacity • No traffic jams • Marking and Signaling in accordance with international standards 9/5/2021 Ministry of Regional Development & Infrastructure of Georgia 6

Economic Criteria • Feasibility Study – has been done • Investment Volume – 340

Economic Criteria • Feasibility Study – has been done • Investment Volume – 340 million USD Rikoti-Zestaponi Upgrade/ Construct new sections 9/5/2021 Length Total Construction Cost USD thousand Cost per km USD thousand IRR 43. 4 333 166 769 10. 0 Ministry of Regional Development & Infrastructure of Georgia 7

Preliminary Environmental Assessment • Infrastructure Environmental Effect is – minimal • Impact on Pollution

Preliminary Environmental Assessment • Infrastructure Environmental Effect is – minimal • Impact on Pollution is – minimal • Impact on Noise is – low • Emission due to traffic will be sensible reduced 9/5/2021 Ministry of Regional Development & Infrastructure of Georgia 8

Rikoti-Zestaponi Highway Political Advantages • Open policy for international road transportation • Road Improvement

Rikoti-Zestaponi Highway Political Advantages • Open policy for international road transportation • Road Improvement is defined as State Priority in the main state policy documents – Basic Data & Direction (BDD) & Georgia Without Poverty • More than 90% of East-West Highway in GOOD conditions • The Shortest link between Black & Caspian Seas • Simplified border crossing procedures 9/5/2021 Ministry of Regional Development & Infrastructure of Georgia 9

Thank you for your attention! 9/5/2021 Ministry of Regional Development & Infrastructure of Georgia

Thank you for your attention! 9/5/2021 Ministry of Regional Development & Infrastructure of Georgia 10