Progress of GEM RD in Lanzhou Univerity Yi

  • Slides: 32
Download presentation
Progress of GEM R&D in Lanzhou Univerity Yi Zhang

Progress of GEM R&D in Lanzhou Univerity Yi Zhang

Contents • Time properties of GEM-detector signal • R&D of GEM detector • R&D

Contents • Time properties of GEM-detector signal • R&D of GEM detector • R&D of GEM-Daq • Future plan Aug. 11, 2016 Prog. of GEM R&D in LZU 2

Time properties of MPGD signals • Fast raising time • Signal duration depends on

Time properties of MPGD signals • Fast raising time • Signal duration depends on the way of energy deposition – Particle identification by cut on time • The maximum duration is independent of incidental energy – Correct the initial position Aug. 11, 2016 Prog. of GEM R&D in LZU 3

Goal • reduce the local rates by rejecting γ signals according to the time

Goal • reduce the local rates by rejecting γ signals according to the time information • try to reduce the load of DAQ by clustering on hardware level (FPGA) Aug. 11, 2016 Prog. of GEM R&D in LZU 4

To demonstrate the conclusions, a test was done Mean=89. 4 ns σ= 1. 744

To demonstrate the conclusions, a test was done Mean=89. 4 ns σ= 1. 744 Mean=135. 7 ns σ= 22. 8 SP-ADQ 412: 1. 8 GHz Aug. 11, 2016 Prog. of GEM R&D in LZU 5

Garfield++ simulation of the double GEM (reference) Edrift=1 k. V/cm EGem=58. 33 k. V/cm

Garfield++ simulation of the double GEM (reference) Edrift=1 k. V/cm EGem=58. 33 k. V/cm gain=9032 Garfield++ simulation of the double GEM + Mesh Edrift=1 k. V/cm EGem=58. 33 k. V/cm Eamp=40 k. V/cm gain=68930 Aug. 11, 2016 Prog. of GEM R&D in LZU 6

R&D of GEM detector Aug. 11, 2016 Prog. of GEM R&D in LZU 7

R&D of GEM detector Aug. 11, 2016 Prog. of GEM R&D in LZU 7

New readout panel To APV 25 167 channels in 10 cm PANASONIC 130 P

New readout panel To APV 25 167 channels in 10 cm PANASONIC 130 P Aug. 11, 2016 Prog. of GEM R&D in LZU 8

New version of triple-layer GEM detector Aug. 11, 2016 Prog. of GEM R&D in

New version of triple-layer GEM detector Aug. 11, 2016 Prog. of GEM R&D in LZU 9

High voltage and trigger HV 5 M 10 M 6 KV 103 M drift

High voltage and trigger HV 5 M 10 M 6 KV 103 M drift electrode 10 M MPD+V 1218 CF 8000 discriminator }GEM III 15 M Aug. 11, 2016 6 KV 103 M Trigger Prog. of GEM R&D in LZU 10

Test result of new detector (55 Fe) σ~127 um σE~19. 5% σ~127 um Aug.

Test result of new detector (55 Fe) σ~127 um σE~19. 5% σ~127 um Aug. 11, 2016 Prog. of GEM R&D in LZU 11

x-ray imaging by new detector and Daq 10 cm detector & daq system Aug.

x-ray imaging by new detector and Daq 10 cm detector & daq system Aug. 11, 2016 Prog. of GEM R&D in LZU 12

R&D of GEM-Daq Aug. 11, 2016 Prog. of GEM R&D in LZU 13

R&D of GEM-Daq Aug. 11, 2016 Prog. of GEM R&D in LZU 13

coincidence trigger to identify muon and photon Aug. 11, 2016 Prog. of GEM R&D

coincidence trigger to identify muon and photon Aug. 11, 2016 Prog. of GEM R&D in LZU 14

Real signals recorded in Daq - μ smic co 55 Fe Aug. 11, 2016

Real signals recorded in Daq - μ smic co 55 Fe Aug. 11, 2016 Prog. of GEM R&D in LZU 15

comparing signal amplitudes of different particle x-ray in 1 period x-ray in mutil period

comparing signal amplitudes of different particle x-ray in 1 period x-ray in mutil period muon in 1 period Aug. 11, 2016 Prog. of GEM R&D in LZU muon in mutil period 16

Avalanche electrons collected on by detector (simulation) Aug. 11, 2016 Prog. of GEM R&D

Avalanche electrons collected on by detector (simulation) Aug. 11, 2016 Prog. of GEM R&D in LZU 17

Steps of online track reconstruction • Divide signals into time slices (1 period for

Steps of online track reconstruction • Divide signals into time slices (1 period for each) – Segmentation in readout plane —— cut on signal amplitude – Combine adjacent segment —— identify clusters of hits • Process multi time slices – Combine adjacent time slices —— distinguish if signal continues – Integrate multi time slices —— identify the start and end of a signal Aug. 11, 2016 Prog. of GEM R&D in LZU 18

Forming hit clusters in one time slice (simulation) Aug. 11, 2016 Prog. of GEM

Forming hit clusters in one time slice (simulation) Aug. 11, 2016 Prog. of GEM R&D in LZU 19

Development board: ARRIA GX FPGA toolkit EP 1 AGX 60 DF 780 C 6

Development board: ARRIA GX FPGA toolkit EP 1 AGX 60 DF 780 C 6 N Aug. 11, 2016 Prog. of GEM R&D in LZU 20

Forming hit clusters in 1 time slice fake data test (27× 27 chns) Aug.

Forming hit clusters in 1 time slice fake data test (27× 27 chns) Aug. 11, 2016 Prog. of GEM R&D in LZU 21

Used FPGA periods Processing speed VS signal coverage ratio Ratio of fired channels in

Used FPGA periods Processing speed VS signal coverage ratio Ratio of fired channels in 1 period (%) Aug. 11, 2016 Prog. of GEM R&D in LZU 22

Resources consumption budget (2048 chs) reports of our code: from INFN : Iterms of

Resources consumption budget (2048 chs) reports of our code: from INFN : Iterms of resources Usage of current daq Usage of out code Combinational ALUTs 48, 080 21, 247 (44%) 14, 092 (29%) Dedicated registers 48, 080 13, 382 (28%) 32, 224 (67%) 256 0 3(1%) 2, 528, 640 1, 808, 252 (72%) 73, 216 (3%) DSP Block Memory Bits Aug. 11, 2016 Total Prog. of GEM R&D in LZU 23

Combine few time slices, get the complete tracks (simulation) Aug. 11, 2016 Prog. of

Combine few time slices, get the complete tracks (simulation) Aug. 11, 2016 Prog. of GEM R&D in LZU 24

Identify the tracks (simulation) Aug. 11, 2016 Prog. of GEM R&D in LZU 25

Identify the tracks (simulation) Aug. 11, 2016 Prog. of GEM R&D in LZU 25

Try to identify signals of different particle (data) period 2/period 1 Aug. 11, 2016

Try to identify signals of different particle (data) period 2/period 1 Aug. 11, 2016 period 3/period 1 Prog. of GEM R&D in LZU period 3/period 2 26

γ background in So. LID GEM 5 k. Hz/mm 2 from So. LID Pre.

γ background in So. LID GEM 5 k. Hz/mm 2 from So. LID Pre. CDR Aug. 11, 2016 Prog. of GEM R&D in LZU 27

primary electron-ion couples in triple GEM Aug. 11, 2016 Prog. of GEM R&D in

primary electron-ion couples in triple GEM Aug. 11, 2016 Prog. of GEM R&D in LZU 28

Signals induced by 1 track FEE rising time (22 ns) included Aug. 11, 2016

Signals induced by 1 track FEE rising time (22 ns) included Aug. 11, 2016 Prog. of GEM R&D in LZU 29

Future plan • process multi time slices on FPGA • test with real beam

Future plan • process multi time slices on FPGA • test with real beam data? • communicate with INFN experts – try to merge our code into current firmware Aug. 11, 2016 Prog. of GEM R&D in LZU 30

Thank you !

Thank you !

Aug. 11, 2016 Prog. of GEM R&D in LZU 32

Aug. 11, 2016 Prog. of GEM R&D in LZU 32