PBS – Stage 1 Operations Stage 1 (2007 -2012) – Administrative arrangements & Standards under the National Transport Commission: • Vehicle Certification Rules • The Standards and Vehicle Assessment Rules • Review Panel Business Rules • Network Classification Guidelines • Guidelines for Determining National Operating Conditions • Assessor Accreditation Rules • Mapping Portal
PBS – Stage 2 Operations Stage 2 (2013+) – Heavy Vehicle National Law under the National Heavy Vehicle Regulator: • Operation of new scheme through the NHVR (one-stop-shop) • Improved access arrangements for compliant vehicle designs • Modular assessment for prime mover and trailer • Business rule changes to allow for self certification
PBS – Applications 2007 5 years 2013 359 applications December 12
PBS – Final Approvals 2007 5 years 2013 Over 1000 vehicles approved
PBS – Growth 2007 5 years 2013 2 Assessors 13 Assessors (1 OEM) No certifiers 7 certifiers Handful of vehicles Over 1000 vehicles
PBS – Growth 2007 5 years 2009 PBS Maps PBS Review 2013 2012 Improved PBS scheme approved by Ministers
PBS – in Australia 2007 5 years 2013 No firm statistics on state by state at this stage. Victoria has around 75% PBS vehicles operating currently
PBS – Vehicle types
PBS – The Panel (2012) Chair – David Anderson Deputy – Neil Findlay CW – Daniel Lambert VIC – Ian Mond TAS – Danny Johnson ACT – Rod Paule NSW – Michael Wills QLD – Russell Hoelzl SA – Jennifer Martin WA – Kevin Loftus NT – Simon Saunders
PBS – The Panel Buckles and width © http: //www. trucknetuk. com • Operation improvements to expedite approval of applications. • Highlights policy matters (eg width).
PBS – Blueprints - 2007
PBS – Modularity – 2013+ • Modular assessment and certification Manufacturer can assess and certify prime mover Manufacturer can assess and certify trailer PBS compliant vehicle combination
PBS – Blueprints today To be released by the end of March 2013
PBS – 2007 to 2012 Process Before • • Applicant negotiates with each road authority for a permit Single vehicle application made the process expensive Combinations components were locked in (truck and trailer) No certainty of access
PBS – 2013+ Process 2013 • • • Manufacturers’ blueprints (reduced applications costs) Manufacturers’ self assessment Regulator becomes single point of contact Combination modularity (mix and match trailers) Certainty of access through gazetted routes. Permits issued when non standard access is sought
PBS – Challenges State and Local Governments NHVR • • Bridge and Route assessments Access conditions consistency Local council last mile issues Education and community perception • Route assessments • Systems and processes • Compliance and enforcement – information and education
PBS – Future Performance Based Standards Level 1 Length Limit Review – FS 1675 Potential 23 m* Performance Based Standards Review of level 3 & 4 limits – FS 1804 In progress Quantifying the benefits of HPV – FS 1805 In progress Braking standards Future consideration Tyres and other components Under review Route assessment tools On trial by MAV *identified in this report has been based on an analysis of the network, and is indicative of its maximum potential from a risk-based perspective.
PBS – PBS and the NHVR (forecasts) By 2030 projected 3. 5% of HV Fleet Improvements to PBS scheme implemented in 2013 p u ke ta d te 2012 0. 1% of HV Fleet ec j o Pr Increased number of applications Increased productivity Better (newer) HV fleet - Safer