Preparing Baby MIND for Japan E Noah 26
Preparing Baby MIND for Japan E. Noah 26 th July 2017 1
Main topics today • Transport logistics: Geneva-Japan • • What are the transport options? What is the timeline? Equipment for packing Storage issues • Installation of Baby MIND at J-PARC • Installation requirements • What are the installation options? • Installation sequencing w. r. t. side. MRD and WAGASCI? • Preparation work: • Integration with WAGASCI systems • Electronics to be developed (MCB, MCR daughter board) • DAQ 2
TRANSPORT 3
Transport options • All options: 1) 2) 3) 4) ARMCO + scintillator: Send 4 chassis on 20’ Hardtop x 4 (no control of temperature!!) with scintillator modules. Option to insulate on the inside (though not much room) Check maximum admissible load per meter ARMCO + scintillator: Send 4 chassis on 20’ flatrack x 4 (no control of temperature!!) with scintillator modules with cover! Max. risk of damage to scintillator modules. Can design wood cover to go around plastic water-tight cover. ARMCO + scintillator: Send 4 chassis in 4 reefers (40’ High Cube Reefer) on rollers: i. e. push into container, and pull back out of container. • Check load per meter in container with DB schenker. • Check height. • Check how to attach to container ARMCO separate to scintillator: Send 4 chassis with ARMCO only standard 20’ flatrack x 4 scintillator modules in separate reefer!! • Shipping sequence: • Send everything at once • Send in two separate shipments: one in September, one in November 4
Shipping option 1) 20’ hardtop container (example given here is Hapag-Lloyd) Roof opening dimensions: Hapag-Lloyd 2260 39 30 0 215 Inside dimensions: Hapag-Lloyd Door opening dimensions: Hapag-Lloyd 5
Shipping option 4) Scintillator modules shipping: • 1 or 2 refrigerated (reefer) containers • Loaded horizontally on special oversize palettes Magnet modules shipping: • 4 platforms • Tarpaulins to protect from weather • 1 chassis loaded on each: 18 to 20 t each 6
INSTALLATION 7
Installation at J-PARC • All options: • Install several small chassis: re-use some Baby MIND transport chassis. • Install several small chassis: all new. • Install one big chassis for all. • See slides by Minamino-san. 8
To do list • Work plan options: • Plan September trip: (Etam+Laurent+? ? ) test with a wooden structure all the actions to unload and install in the pit. • To do: • Contact Muffat/Krattinger to review a few options DB Schenker • Quote for special palette (Ordem SA and others) • Design of palette • Quote for wooden box covers for flatrack transport. • Design of rolling system IF small chassis system • Based on Chariot de transport FUTURO 554219. 0200 (www. brw. ch) • Design pivot system to be able to displace chassis in different directions. • With butée à billes SKF 866200. 51212 9
- Slides: 9