PreLaunch Readiness Review 1 Empty Space Inc Corina

  • Slides: 9
Download presentation
Pre-Launch Readiness Review #1 Empty Space, Inc. Corina Allen Miranda Mesloh Brett Anderson Brian

Pre-Launch Readiness Review #1 Empty Space, Inc. Corina Allen Miranda Mesloh Brett Anderson Brian Taylor Mike Gainey Katherine Schreiber

Mission n Test the vertical range of wireless technology n Test cell phone durability

Mission n Test the vertical range of wireless technology n Test cell phone durability at 100, 000 ft. n Deploy Elastic Memory Composite Hinge to maneuver split mirrors n Image both the Earth and space n Measure ascent and descent rates during flight

Cell Phone Experiment Attach cell phone to a digital recording device and record transmission

Cell Phone Experiment Attach cell phone to a digital recording device and record transmission during flight n Expected transmission: n – Constant beep – Wind & possible mach 1 sounds – Balloon pop Establish connection with satellite cell phone via auto answer n Play a constant beep from the ground to determine quality of reception n

EMC Hinge Deployment n An Elastic Memory Composite hinge will be attached to our

EMC Hinge Deployment n An Elastic Memory Composite hinge will be attached to our split mirror outside the satellite to achieve images of both the Earth and space n Heat the hinge to deploy mirror and take pictures of the horizon n Camera will be placed against a side panel with a view hole to take pictures

Subsystems Phone – Lead: Brian n EMC Hinge – Lead: Brett n HOBO –

Subsystems Phone – Lead: Brian n EMC Hinge – Lead: Brett n HOBO – Lead: Mike n Camera – Lead: Katherine n Ground – Lead: Corina § Ascent & descent rates n Structural – Lead: Miranda § weight n Heating – Lead: Mike § Heaters & insulation n

Current Status n All materials purchased n All materials stripped down to necessary sizes

Current Status n All materials purchased n All materials stripped down to necessary sizes n Design structure finished n Cell phone integration half way complete

Current Mass & Budget n n Current Mass: 462. 3 grams Total Spent :

Current Mass & Budget n n Current Mass: 462. 3 grams Total Spent : $163. 58 Budget left: $36. 42 Individual Prices – – – – Mirror ~ $3. 75 Blanket/Insulation ~ $3. 95 Digital Recorder ~ $59. 99 2 9 volt rechargeable batteries ~ $21. 98 4 AAA rechargeable batteries ~ $12. 59 Phone adapter ~ $21. 99 Cell phone & minutes ~ $30. 00

Schedule n Following three weeks scheduled by subsystem – Specific tasks outlined by Subsystem

Schedule n Following three weeks scheduled by subsystem – Specific tasks outlined by Subsystem Leads – Then integrated into ‘Master Schedule’ n Complete Integration scheduled for 11/9 n 11/9 -11/17 will be satellite testing n Launch day scheduling part of Ground subsystem

Questions? Comments?

Questions? Comments?