Post Mortem Analysis tools and event handling Odd

  • Slides: 12
Download presentation
Post Mortem Analysis tools and event handling Odd Øyvind Andreassen Sławomir Sudak

Post Mortem Analysis tools and event handling Odd Øyvind Andreassen Sławomir Sudak

Plan of the presentation • Changes from point of view of an end user

Plan of the presentation • Changes from point of view of an end user • Modifications made in background 17/10/2021 Odd Oyvind Andreassen, Slawomir Sudak BE-CEM-MTA 2

User Experience 17/10/2021 Odd Oyvind Andreassen, Slawomir Sudak BE-CEM-MTA 3

User Experience 17/10/2021 Odd Oyvind Andreassen, Slawomir Sudak BE-CEM-MTA 3

User experience • Goal was to preserve the same workflow as the one known

User experience • Goal was to preserve the same workflow as the one known from the previous campaings • Most of applications’ GUI have not been changed: • DFB (Distribution Feed Boxes) • CRYO (Cryogenic) • PIC (Power Interlock) • ELC (Merge of two applications) • PNO 2 (Resistance and inductance) • PCS (Splice verification) • PNO 3 (Bipolar cycle) • Post Mortem Browser * • RBA (RB quench analysis tool) ** • Any need for improvements? 17/10/2021 Odd Oyvind Andreassen, Slawomir Sudak BE-CEM-MTA 4

Post Mortem Event Analyzer • New implementation entailed a need of new GUI •

Post Mortem Event Analyzer • New implementation entailed a need of new GUI • The layout and workflow remain the same 17/10/2021 Odd Oyvind Andreassen, Slawomir Sudak BE-CEM-MTA 5

Post Mortem Event Analyzer • New implementation entailed a need of new GUI •

Post Mortem Event Analyzer • New implementation entailed a need of new GUI • The layout and workflow remain the same 17/10/2021 Odd Oyvind Andreassen, Slawomir Sudak BE-CEM-MTA 6

Post Mortem Event Analyzer • Search for history, previous tests and all tests on

Post Mortem Event Analyzer • Search for history, previous tests and all tests on a circuit is a DB query now, what benefits in shorter time of the operation • Work in progress • Decreasing start up time 17/10/2021 Odd Oyvind Andreassen, Slawomir Sudak BE-CEM-MTA 7

Automated analyses Test Name Circuit Type PCS 600 A EE PCS 600 A no

Automated analyses Test Name Circuit Type PCS 600 A EE PCS 600 A no EE = 600 A no EE crowbar PIC 2 CIRCUIT QUENCH VIA QPS IPQ PIC 2 CIRCUIT QUENCH VIA QPS IPD PIC 2 FAST ABORT REQ VIA PIC IPQ PIC 2 FAST ABORT REQ VIA PIC IPD PIC 2 POWERING FAILURE 80 -120 A PIC 2 POWERING FAILURE IPQ PIC 2 POWERING FAILURE IPD PNO. a 1 60 A PNO. a 1 80 -120 A PNO. a 3 600 A EE PNO. a 3 600 A no EE = 600 A no EE crowbar 17/10/2021 Odd Oyvind Andreassen, Slawomir Sudak BE-CEM-MTA 8

Infrastructural changes 17/10/2021 Odd Oyvind Andreassen, Slawomir Sudak BE-CEM-MTA 9

Infrastructural changes 17/10/2021 Odd Oyvind Andreassen, Slawomir Sudak BE-CEM-MTA 9

Infrastructure – previous solution LHC equipment PM collector PM converter Trigger PM Data storage

Infrastructure – previous solution LHC equipment PM collector PM converter Trigger PM Data storage (SDDS) PM. EB PM Event builder PM. EA PM Event Analyser Data collection and preprocessing Logging DB HWC sequencer Seq PM. RH Data viewing and analysis Request handler PIC Powering interlock analysis PCS Powering Circuit Splice analysis Result of test MTF Discharge QPS Quench Protection analysis PNO Powering to nominal analysis DFB Distribution Feed Box Cryo 17/10/2021 Crowbar analysis Cryogenics Odd Oyvind Andreassen, Slawomir Sudak BE-CEM-MTA 10

Infrastructure – new solution 17/10/2021 Odd Oyvind Andreassen, Slawomir Sudak BE-CEM-MTA 11

Infrastructure – new solution 17/10/2021 Odd Oyvind Andreassen, Slawomir Sudak BE-CEM-MTA 11

Thank you for your attention! 17/10/2021 Odd Oyvind Andreassen, Slawomir Sudak BE-CEM-MTA 12

Thank you for your attention! 17/10/2021 Odd Oyvind Andreassen, Slawomir Sudak BE-CEM-MTA 12