Pollutant Removal Effectiveness of the Mc Connell Springs
- Slides: 43
Pollutant Removal Effectiveness of the Mc. Connell Springs Stormwater Quality Wetland Pond and the Gainesway Pond Retrofit Project, Lexington, KY David J. Price, Ph. D. Susan L. Plueger, P. E. Division of Water Quality Funded in part through § 319(h) Non-Point Source Implementation Grants from the U. S. EPA administered by KDOW
Gainesway Pond Retrofit Project
The “pond” before construction
Design Firm: CDP Engineers Layout
Mc. Connell Springs Stormwater Quality Wetland Pond
The site before construction
Mc. Connell Springs Design Firm: Carman Welcome Center
Layout
A pond liner installed The site today Boardwalk taking shape
Pollutant Removal Results Mc. Connell Springs Stormwater Quality Wetland Pond
Locating Sampling Sites and Training of Personnel
Sampling Locations M 4 M 2 M 5 M 3 M 1
Sampling at Mc. Connell Springs Stormwater Quality Wetland Project
Water Quality Parameters Measured at Mc. Connell Springs Stormwater Quality Wetland Project • • • Temperature p. H ORP Dissolved Oxygen Conductivity Total Dissolved Solids Salinity Alkalinity Hardness Carbonaceous Biological Oxygen Demand (CBOD) • • • Total Suspended Solids Total Ammonia Nitrate Nitrite Total Phosphorous Ortho-phosphate E. coli Other Coliforms Turbidity Clarity Depth
Metals analyzed by ICP at UK-KGS • • • • Aluminum Antimony Arsenic Barium Beryllium Boron Cadmium Calcium Chromium Cobalt Copper Gold Iron Lead Lithium • • • • Magnesium Manganese Nickel Phosphorus Potassium Selenium Silicon Silver Sodium Strontium Sulfur Thallium Tin Vanadium Zinc
7/26 8/27 4/22 3/26 4/26 6/9 12/2 6/14 Rainfall Levels Recorded at the Bluegrass Airport for 2010
Mc. Connell Springs Water Quality Results for 2010 • Nine Sampling Dates • p. H • DO • Conductivity • Alkalinity • Hardness • Nitrate • Nitrite 7. 00 – 9. 75 SU 3. 03 – 8. 40 mg/L 81 – 1614 µS/cm 45 – 210 mg/L 65 – 1650 mg/L <0. 01 – 5. 86 mg/L <0. 05 – 0. 52 mg/L
Total Suspended Solids (TSS) in Water Samples from Mc. Connell Springs Stormwater Quality Wetland Project Year 2010
Total Suspended Solids (TSS) in Water Samples from Mc. Connell Springs Stormwater Quality Wetland Project Spring-Summer
Total Suspended Solids (TSS) in Water Samples from Mc. Connell Springs Stormwater Quality Wetland Project Summer-Winter
Total Phosphorous in Water Samples from Mc. Connell Springs Stormwater Quality Wetland Project
Bacterial Counts (E. coli) in Water Samples from Mc. Connell Springs Stormwater Quality Wetland Project
Metal Concentrations in Water Samples from Mc. Connell Springs Stormwater Quality Wetland Project 03/26/10 06/09/10
03/26/10 <0. 005 06/09/10 <0. 002 <0. 005 Metal Concentrations in Water Samples from Mc. Connell Springs Stormwater Quality Wetland Project
Metal Concentrations in Water Samples from Mc. Connell Springs Stormwater Quality Wetland Project 03/26/10 06/09/10
Pollutant Removal Results Gainesway Pond Retrofit Project
Sampling Locations GP 5 GP 4 FLO GP 3 W GP 2 GP 1
Sampling at Gainesway Pond Stormwater Quality Project
Gainesway Pond Water Quality Results for 2010 • Sampling Dates: 4/2, 6/24, 8/26, 12/2 • p. H • DO • Conductivity • Alkalinity • Hardness • Nitrate • Nitrite 7. 00 – 8. 85 SU 1. 12 – 12. 68 mg/L 328 – 1231 µS/cm 126 – 288 mg/L 166 – 445 mg/L <1. 00 – 7. 50 mg/L <0. 05 – 0. 17 mg/L
Total Suspended Solids (TSS) in Water Samples from Gainesway Pond Retrofit Project
Total Ammonia in Water Samples from Gainesway Pond Retrofit Project
Total Phosphorous in Water Samples from Gainesway Pond Retrofit Project
CONCLUSIONS Mc. Connell Springs ● p. H, dissolved oxygen, alkalinity and hardness were within normal parameters ● Total suspended solids decreased through the stormwater facility ● ● Ammonia levels decreased at sites M 4 and M 5 ● Total phosphorous and orthophosphates decreased over time Nitrate and nitrite levels were low – continue monitoring
CONCLUSIONS Mc. Connell Springs ● Counts for E. coli and other coliforms were lowest at sites M 4 and M 5 ● Metals not detected in any of the sites: Antimony, Beryllium, Cadmium, Chromium, Gold, Lead, Selenium, Silver, Thallium, Strontium, & Vanadium ● Reductions of Aluminum, Copper, Iron, Nickel, Sulfur & Zinc through the stormwater facility
CONCLUSIONS Gainesway Pond ● p. H, dissolved oxygen, alkalinity and hardness were within normal parameters ● Total suspended solids were highest in the ponds (GP 4 & GP 5) ● Spring/summer ammonia levels decreased at GP 4 & GP 5, but Fall/Winter levels increased ● Levels for total phosphorous, orthophosphates, nitrate and nitrite were similar in Spring/Summer, but increased in Fall/Winter – Continue monitoring
RECOMENDATIONS u Based on the preliminary data, it appears that both stormwater structures are performing as expected u Continue monitoring in 2011 (at least every other month) Significant for phosphorous, nitrates, nitrites, & metals which could be detrimental
Questions?
- Secondary pollutants
- What is secondary pollutant
- Pollutant
- Slogans on air pollution
- What is secondary pollutant
- Joseph connell barnacle experiment
- Richard connell interesting facts
- Lica connell
- Climax of most dangerous game
- National terry day
- Bernie connell
- Examples of suspense in the most dangerous game
- Metaphors in the most dangerous game
- The most dangerous game antagonist
- Angela connell diaz
- Barra grega sutura
- Chuck connell
- Connell high school graduation
- Donncha o'connell
- The most dangerous game summary
- Chuck connell
- O'connell's webs of beliefs
- Literary devices in the sniper
- điện thế nghỉ
- Một số thể thơ truyền thống
- Trời xanh đây là của chúng ta thể thơ
- Ng-html
- Số nguyên là gì
- Tia chieu sa te
- Các châu lục và đại dương trên thế giới
- Tư thế worm breton là gì
- Thế nào là hệ số cao nhất
- ưu thế lai là gì
- Sơ đồ cơ thể người
- Tư thế ngồi viết
- Cái miệng bé xinh thế chỉ nói điều hay thôi
- đặc điểm cơ thể của người tối cổ
- Mật thư anh em như thể tay chân
- Bổ thể
- Tư thế ngồi viết
- Thẻ vin
- Thể thơ truyền thống
- Hát lên người ơi alleluia
- Các châu lục và đại dương trên thế giới