PIT Draft Theme Assignments Long Range PIT Team

  • Slides: 9
Download presentation
PIT Draft Theme Assignments Long Range PIT Team

PIT Draft Theme Assignments Long Range PIT Team

Themes Quantify/Summarize Performance as built (Krafft Lead) – Data Management Field emission and mitigation

Themes Quantify/Summarize Performance as built (Krafft Lead) – Data Management Field emission and mitigation (Drury Lead) – He Processing – Plasma Processing – Field Emission Changes? – Maintenance/Improvement Program – Increase ability to diagnose field emitters (X-ray diagnostics? ) and understand Q effects

Themes Operations and Operations processes (Freyberger Lead) – LEM Improvement – Operations Emax changes

Themes Operations and Operations processes (Freyberger Lead) – LEM Improvement – Operations Emax changes and process – Cryo Load reconcilliation and enhanced diagnostics. "Better" pressure diagnostics Trip Rates and Trip Rate Reduction (maybe included above) – Understanding spontaneous arcing and rapid loss of gradient – Microphonics damping and/or rework of R 100 – LLRF ungrades, particularly for C 50 s and improvement of heater controls there

Themes Construction Issues (Geng/Rimmer Lead) – Understanding Q changes between vertical and horizontal tests,

Themes Construction Issues (Geng/Rimmer Lead) – Understanding Q changes between vertical and horizontal tests, and tunnel placement – Understanding and eliminating flux trapping and flux sources

Process Regular Report Every 2 months Start with “Study Plan” – Meet with other

Process Regular Report Every 2 months Start with “Study Plan” – Meet with other group members – 7 -10 Task items on a Gannt Chart – Specify some deliverables – Plan for a year to two

Documentation Theme G. Krafft K. Jordan S. Suhring C. Mounts T. Powers

Documentation Theme G. Krafft K. Jordan S. Suhring C. Mounts T. Powers

Field Emission Theme M. Drury R. Bachimanchi F. Marhauser C. Hovater C. Reece H.

Field Emission Theme M. Drury R. Bachimanchi F. Marhauser C. Hovater C. Reece H. Wang

Operations Theme A. Freyberger J. Benesch J. Creel S. Cooper R. Norton T. Plawski

Operations Theme A. Freyberger J. Benesch J. Creel S. Cooper R. Norton T. Plawski R. Michaud H. Zhang

B-Hygiene/Construction Theme E. Daly K. Davis R. Geng L. King J. Preble R. Rimmer

B-Hygiene/Construction Theme E. Daly K. Davis R. Geng L. King J. Preble R. Rimmer