PIP Update Nov 7 2012

PIP Update Nov 7 2012

Agenda • Summary Update – Current Activities Updates/Talks: Elmie and Ken: RLS – Updates

Agenda • Summary Update – Current Activities Updates/Talks: Elmie and Ken: RLS – Updates – Budget Summary

 • Update Current Work – Booster RF cavity rework RF 6 in test

• Update Current Work – Booster RF cavity rework RF 6 in test stand being tested…. . • Cavity 1017 was mechanically finished on 10/29. Vacuum pump issues were resolved on 10/31 – Tuner Work: Three tuners waiting to be assembled once we have cones • Building 12 cone assemblies – since none available. Goal is to complete these next week. – Cavity 1013 build: (Mike May ), center is scheduled to be in the machine shop before Thanksgiving. – SS PA Work: Not much has changed - will have the copper cooling rings for the tube sockets this week ( the machine was very busy. )? • Water Manifolds are presently being constructed by Larsen MFG in Mundelein, IL. Possibly finished by late next week. – SS Install: The modified 'taller' SSD rack was finished and brought over to station 9 in the East Booster Gallery. – Modulator Work: First 10 completed/Tested, Next twelve - two are 100% (1/week) – LCW: Booster LCW return pump work is complete. • Some Booster enclosure LCW work is ongoing; Long 3 hose replacement, EDWA magnet hook-ups, minor leaks, may try to install some more strainers and valves. • Pre. Acc LCW work is ongoing; RFQ and Solenoid magnet LCW is complete, PSQA doublet magnet LCW in progress – MCC – moved to lower gallery and is in the process of being connected!!! – RFQ: Entire Line Connected, Surveyed and Under vacuum!! Connections/Conditioning • Schedule -> Finish Safety Testing this week, Beam permit signoffs next week …. – HPower RF : ODDONE had signed the 1. 4 Mrequisition Well Not Any More – Put back on Hold (NOVA) – Booster Absorber – Blocks Installed, Drawings approved – Linac Modulator –SLAC requisition placed to continue work. – Cogging – Software work continues – Booster Shielding – Safety did tunnel tour – will have a update end of month Shutdown - comments (Fernanda, Todd, Mary) Fiscal Year – There is still some FY 12 –> FY 13 funding discussions occurring – Today Talk has more information…. .

So far on schedule – or a little ahead but will like to have

So far on schedule – or a little ahead but will like to have extra time for working on sources, efficiency an measurements.

Upcoming • RLS – Finishing updates • Fiscal Year Start – – Labor requests

Upcoming • RLS – Finishing updates • Fiscal Year Start – – Labor requests – mostly worked out – M&S – still depends upon 2 nd floor decision but have tasks that ready to go/continue • Reports – none at this time • Meetings: – Roger regular PIP – yesterday • Talked about fiscal (labor) concerns for both AD and PIP – Meet with Ann again (Nov 14? )

Talks • Elmie Peoples / Ken Domann - Project Status Updates

Talks • Elmie Peoples / Ken Domann - Project Status Updates