Payload Subsystem Integration and Testing Report UniversitiesInstitutions Team
Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date Rock. Sat-C 2011 ISTR
User Notes – This template shall be followed as closely as possible. Rock. Sat-C 2011 ISTR
Mission Overview – Briefly remind everyone what your mission is. Rock. Sat-C 2011 ISTR
Functional Block Diagram - A Functional block diagram of the entire system should be presented here. - By now, your payload should have excellent block diagrams after CDR completion. - Use this diagram as a basis/reference as you explain to me how things integrated together. - Be sure to define subsystem acronyms Rock. Sat-C 2011 ISTR
Integration Procedure - How did you integrate your various subsystems? - To what level (Full system or just subsystem to subsystem? ) - i. e. - Power board verified, then connected to main board Powered up main board and verified voltages at all sensors Connected control board. . Blah, blah After testing electrical boards, mounted to Rock. Sat-X plate Mounted mechanical boom to plate Connected mechanical boom to control board. . . Blah, blah - Show pictures! I am hoping to see components fitting together Integrating the tether spool onto the power and unpowered hubs (EXAMPLE Picture and description) Rock. Sat-C 2011 ISTR
Results - What went wrong? - What will be done to remedy the problem? - What lesson (if any) was learned? - Pictures! - What went right? - Pictures - Best practices - What advice could you give to next year’s team? Rock. Sat-C 2011 ISTR
Integrated Subsystem Testing - Once integrated, did you test any of the integrated subsystems? - Why did you perform the test that you did? If you didn’t test integrated subsystems, why not? - - If you had a failure, which prevented testing, how will you move forward? Pictures! Control board mounted to main board Testing functionality of push-button state changes in software (EXAMPLE) Rock. Sat-C 2011 ISTR
Testing Results - Did everything work as planned? - Did all electronics communicate? - Did the software work with all subsystems? - Did the sensors return reasonable data? - Will the sensors need calibration? - Most importantly, just summarize your findings - What needs to change before flight? - Action items… Push-button Software Control: Successfully changed software states through push-buttons. No changes required for flight EXAMPLE Main and Control boards could NOT be integrated into structure due hole misalignment. Next revision of board will have correct hole alignment. Rock. Sat-C 2011 ISTR
SITR to DITL 1 – What is your plan from now until your first Day In The Life (DITL) testing report? • Currently scheduled for 4/20/2011 Rock. Sat-C 2011 ISTR
Concluding Remarks – Issues and concerns – Closing remarks Rock. Sat-C 2011 ISTR
Appendix – Additional data not immediately relevant to the presentation – You should include copies of updated: • • Mechanical Drawings Electrical Schematics Power Budget ICDs Rock. Sat-C 2011 ISTR
- Slides: 11