Pareto Securities 15 th annual Oil Offshore Conference

  • Slides: 26
Download presentation
Pareto Securities’ 15 th annual Oil & Offshore Conference September 10, 2009 Marketing Presentation

Pareto Securities’ 15 th annual Oil & Offshore Conference September 10, 2009 Marketing Presentation Page 1

KFELS N-Class harsh environment jack-up drilling/production rigs Marketing Presentation Page 2

KFELS N-Class harsh environment jack-up drilling/production rigs Marketing Presentation Page 2

TABLE OF CONTENTS / AGENDA 1 Company Introduction 2 Rig Concept and Design 3

TABLE OF CONTENTS / AGENDA 1 Company Introduction 2 Rig Concept and Design 3 Market/Financials 4 Summary Marketing Presentation Page 3

COMPANY INTRODUCTION – Skeie Drilling & Production ASA (SKDP) q SKDP established September 2006

COMPANY INTRODUCTION – Skeie Drilling & Production ASA (SKDP) q SKDP established September 2006 and located in Kristiansand, Norway q 49% Owned by Skeie Technology AS, 5% by Keppel O & M and 46% by external investors q Commercial and technical services hired from Skeie Technology q Operational Management: Skeie Rig Management with support from Pier Offshore Management Services q Signed contract for design and construction of three KFELS Class N Jack-up Unit with delivery Q 1 -2010, Q 3 -2010 and Q 4 -2010 q OTC listed in Oslo Marketing Presentation Page 4

COMPANY SET-UP Pier Offshore Management Services AS OSM Consultants AS Skeie Technology AS Sub

COMPANY SET-UP Pier Offshore Management Services AS OSM Consultants AS Skeie Technology AS Sub Management Agreement Skeie Rig Management AS (ex Offshore Production Business Management Agreement Sub Supervision Agreement Norsupply AS Skeie D&P Services AS) Head Management Agreement Marketing Presentation Prod. Jack 1 Prod. Jack 2 Prod. Jack 3 Supervision Agreement Page 5

CONSTRUCTION PROGRESS Marketing Presentation Page 6

CONSTRUCTION PROGRESS Marketing Presentation Page 6

OPERATIONS PREPARATIONS • Skeie Rig Management (wholly owned SKDP subsidiary) to operate the rigs

OPERATIONS PREPARATIONS • Skeie Rig Management (wholly owned SKDP subsidiary) to operate the rigs with support from Pier Offshore. • Key onshore and offshore management positions and section leaders already recruited • Training and competency development programs under development • QHSE management systems established • Maintenance systems • Logisitcs (spare parts) Marketing Presentation Page 7

TABLE OF CONTENTS / AGENDA 1 Company Introduction 2 Rig Concept and Design 3

TABLE OF CONTENTS / AGENDA 1 Company Introduction 2 Rig Concept and Design 3 Market/Financials 4 Summary Marketing Presentation Page 8

RIG CONCEPT AND DESIGN COMBINED DRILLING AND PRODUCTION OPERATIONS New N-Class Marketing Presentation Standard

RIG CONCEPT AND DESIGN COMBINED DRILLING AND PRODUCTION OPERATIONS New N-Class Marketing Presentation Standard Jack-up – ”no” clearance between the legs w/jacking system and cantilever Page 9

RIG CONCEPT AND DESIGN SPECIFICATIONS FOR DRILLING OPERATIONS § Drill Floor located on the

RIG CONCEPT AND DESIGN SPECIFICATIONS FOR DRILLING OPERATIONS § Drill Floor located on the substructure above the cantilever. § Cantilever capable of being skidded fore and aft with center line (primary Cantilever position) of rotary up to 75 ft (22. 86 m) aft of stern It can be relocated 26 (7, 92 m) ft to port (secondary Cantilever position) § The Drill Floor can be skidded 20 ft (6. 1 m) port and starboard of the Cantilever centerline both in primary position and in secondary position § Max operation envelop over a pre -installed Jacket/Wellhead Platform: 75 ft aft of Transom, 20 ft to starboard of hull centerline and 46 ft to port of hull centerline. Marketing Presentation Page 10

RIG CONCEPT AND DESIGN COMBINED DRILLING AND PRODUCTION OPERATIONS The Cantilever and Drill Floor

RIG CONCEPT AND DESIGN COMBINED DRILLING AND PRODUCTION OPERATIONS The Cantilever and Drill Floor can be repositioned 26 ft (7. 92 M) to the Port side of the Vessel, to allow space for installation of a future production process module. Marketing Presentation Limits Area: Height: 12, 918 sq ft (1, 200 M 2) 52. 5 ft (16 M) Page 11

RIG CONCEPT AND DESIGN PRODUCTION CONCEPTS WITH STANDARD UNITS/EQUIPMENT Marketing Presentation Page 12

RIG CONCEPT AND DESIGN PRODUCTION CONCEPTS WITH STANDARD UNITS/EQUIPMENT Marketing Presentation Page 12

RIG CONCEPT AND DESIGN ALTERNATIVE PRODUCTION Marketing Presentation Page 13

RIG CONCEPT AND DESIGN ALTERNATIVE PRODUCTION Marketing Presentation Page 13

TECHNICAL COMPARISON WITH PEERS AS DRILLING RIGS RIG DESIGN Class Operating water depth (ft)

TECHNICAL COMPARISON WITH PEERS AS DRILLING RIGS RIG DESIGN Class Operating water depth (ft) Drilling depts (ft) Hull size (ft) (Lx. Bx. D) Leg length (ft) Cantilever outreach (ft) BOP (psi rating) Mud Pumps Liquid mud capacity (bbls) Bulk mud capacity (bbls) Drawworks (hp) Top Drive Cranes Main Power(hp) Variable Deck Load (st) Accomodation Keppel N-Class MSC CJ 70 -X 150 A DNV 400 (430) 35, 000 264/289/35 598 75 15, 000 3 (space for 4) 6, 600 15, 892 4, 600 1 000 tons/2 x 1150 HP 3 13, 050 4, 535 120 DNV 492 30, 000 291/336/38 673 90 15, 000 4 6, 793 15, 723 4, 600 750 tons/1150 HP 3 14, 484 4, 600 120 MSC CJ 62 -S 120 MSC CJ 70 -X 150 A 1) DNV 380 492 30, 000 40, 000 256/296/35 291/336/38 673 541 90 60 15, 000 3 4 5, 400 6, 793 14, 027 15, 723 3, 000 4, 600 750 tons/2 x 1150 HP 1 000 tons/2 x 1150 HP 3 3 6, 880 14, 484 5, 200 3, 693 120 115 1) Enhanced version of the existing CJ-70 design with increased drilling depth, increased variable deck load and 1000 t top drive. Source: Company, ODS Petrodata Marketing Presentation Page 14

TABLE OF CONTENTS / AGENDA 1 Company Introduction 2 Rig Concept and Design 3

TABLE OF CONTENTS / AGENDA 1 Company Introduction 2 Rig Concept and Design 3 Market/Financials 4 Summary Marketing Presentation Page 15

Skeie Drilling & Production (SKDP) Turnkey contract with the world’s leading jackup builder §

Skeie Drilling & Production (SKDP) Turnkey contract with the world’s leading jackup builder § Turnkey contracts signed with Keppel FELS for construction of 3 ultra harsh environment jackup rigs § Deliveries in March, August and December 2010 § All in average delivered cost of ~USDm 477 per unit (total USDm 1. 430) § All 3 units are fully financed with 11 % equity and 89% in debt (incl. convertible bonds) § Low construction risk at Keppel Fels - the world’s leading jackup builder § Favorable payment schedule: 50% at delivery for the first 2 units, 35% for the third unit Marketing Presentation Page 16

Financial Highlights • All rigs fully financed - Equity - Convertible bonds - Secured

Financial Highlights • All rigs fully financed - Equity - Convertible bonds - Secured bonds (2. priority) - Senior secured loan facility (1. priority) • Bond loans may be replaced once the rigs are secured contracts • New rig of equal design up approx. 120 MUSD per rig (3 x 120=360 MUSD) • Delivery time new rig equal design end 2011, beginning 2012 Marketing Presentation Page 17

Skeie Drilling & Production (SKDP) combined drilling/production units § The jackups are purposed built

Skeie Drilling & Production (SKDP) combined drilling/production units § The jackups are purposed built for the NCS and other harsh environment areas § § Superior deck-load capacity Deeper water capabilities Significantly larger air-gap than a standard jackup (up to 62 meters) Big drilling envelope – up to 64 wells without moving the rig § Dual mode value enhancing for oil companies. § § § Provides early cash flow from smaller fields Increases oil recovery rates A combined mode contract could bode for even longer contracts. Oil companies likely to pay for upgrade and downtime related to this § Two existing jack ups and one under construction of the CJ 70 design with similar capabilities for drilling & production § § § Maersk Innovator and Maersk Inspirer Petro. Prod has one under construction The construction cost for the SKDP rigs is significantly lower than a new CJ 70, > 100 MUSD § Operators prefer jackups for semis § § § Marketing Presentation Jackups give less risk for downtime caused by harsh weather Blow Out Preventer (BOP) on deck compared to BOP on seabed for floaters, thus reduced operational risks The North Sea part of the NCS is to a large extent shallow water Page 18

Strong markets with several near term contract opportunities – Limited no. of rigs approved

Strong markets with several near term contract opportunities – Limited no. of rigs approved for NCS § Currently 6 jackups operating on the NCS. § Hereof 5 units operating as drilling rigs § Hereof 2 units matching the capabilities to the SKDP rigs: Maersk Inspirer, rebuilt for drilling & production and Maersk Innovator operating as drilling rig, but can be rebuilt for drilling & production § Extremely difficult for existing rigs to be approved for NCS § There is one CJ 70 unit to be constructed for Petro. Prod suited for drilling & production Marketing Presentation Page 19

Contract Status Jackups, Norway Rowan Gorilla VI: AOC declined. Rowan has re-submitted AOC application

Contract Status Jackups, Norway Rowan Gorilla VI: AOC declined. Rowan has re-submitted AOC application in April/May 2008. Mobilization from UK to be delayed BG: - Planned mobilization to Norway around Q 1 2009, depending on well in progress in UK Marketing Presentation Page 20

Marketing Presentation Page 21

Marketing Presentation Page 21

JU demand Norway: Conoco. Phillips took Innovator and Gallant this week …. needs another

JU demand Norway: Conoco. Phillips took Innovator and Gallant this week …. needs another rig for min 5 Y according to the demand below Source: Pareto Research Marketing Presentation Page 22

Oil production Marketing Presentation Page 23

Oil production Marketing Presentation Page 23

Marketing Presentation Page 24

Marketing Presentation Page 24

Summary • Contract signed with Skeie Energy for rig # 2 for minimum 3

Summary • Contract signed with Skeie Energy for rig # 2 for minimum 3 years • SKDP prequalified by major oil companies • Several bids submitted for NCS operators. Together with a number of new prospects for 2010 -2011 SKDP maintains its optimism that alle three rigs will be on contract within the end of 2008. • Extremely difficult and costly to enter NCS for existing rigs • Identical newbuild N-Class rigs have a price increase of more than USDm 120 with delivery 4 th quarter 2011 • Full financing of all three rigs in place, 1 st priority bank loans completed • Equity issue ≈ 28 MUSD medio September 2008 (bond loan agreement) 100% underwrited by Skeie Technology and Keppel O & M Marketing Presentation Page 25

Contact details: Skeie Drilling & Production ASA Tordenskjoldsgate 9 4612 Kristiansand Norway Telephone: +47