OVERVIEW OF DEA STRATEGIC AND ANNUAL PERFORMANCE PLAN

  • Slides: 45
Download presentation
OVERVIEW OF DEA STRATEGIC AND ANNUAL PERFORMANCE PLAN (2014/15 - 2018/19) PORTFOLIO COMMITTEE BRIEFING

OVERVIEW OF DEA STRATEGIC AND ANNUAL PERFORMANCE PLAN (2014/15 - 2018/19) PORTFOLIO COMMITTEE BRIEFING – 01 JULY 2014

Departmental Programmes as per ENE 1. Administration: Provide leadership, strategic centralised administration and executive

Departmental Programmes as per ENE 1. Administration: Provide leadership, strategic centralised administration and executive support, corporate services and facilitate effective cooperative governance, international relations and environmental education and awareness 2. Legal, Authorisations and Compliance: Promote the development of an enabling legal regime, licencing/authorisation system that will promote enforcement and compliance. 3. Oceans and Coasts: Promote, manage and provide strategic leadership on oceans and coastal conservation 4. Climate Change and Air Quality Management: Improve air and atmospheric quality, lead and support, inform, monitor and report efficient and effective international, national and significant provincial and local responses to climate change 5. Biodiversity and Conservation: Ensure the regulation and management of all biodiversity, heritage and conservation matters in a manner that facilitates sustainable economic growth and development. 6. Environmental Programmes: Implementation of expanded public works and green economy projects in the environmental sector. 7. Chemicals and Waste Management : Manage and ensure that chemicals and waste management policies and legislation are implemented and enforced in compliance with chemicals and waste management authorisations, directives and agreements. 2

Vision: A prosperous and equitable society living in harmony with our natural resources Mission:

Vision: A prosperous and equitable society living in harmony with our natural resources Mission: Providing leadership in environmental management, conservation and protection towards sustainability for the benefit of South Africans and the global community Enhanced environmental Biodiversity Ocean and Coastal Less waste better Cleaner and contribution conserved and Environment protected managed healthy Air towards National protected and conserved Sustainable development Our Passion for the environment enables delivery on our Mandate Proactive efforts to ensure Intergrity of the environment Improved compliance with environmental legislation Enhanced International governance, instruments and agreements supportive of SA environmental and sustainable development priorities Effective cooperative governance and local government support Improved sector education and awareness Improved access to information Adequate and appropriately skilled staff Ecosystem services restored and maintained A fair contribution to the global effort to stabilise GHG concentrations in the atmosphere facilitated Impacts of chemicals better managed Strengthened science programmes for integrated oceans and coastal management Effective knowledge and information management for the sector Equitable and sound corporate governance Inevitable climate change impacts effectively managed Potential negative impacts of all significant developments prevented or managed Efficient and Effective Information Technology service Solid base for Performance –driven organisation People Centric Approach in environmental management Promote and enhance livelihoods through access, fair and equitable sharing of benefits arising from the use of biological resources Improved socio-economic benefits within the environmental sector Improved Service Standards Secure, harmonious, transformed and conducive working environment

PROGRAMME 1: ADMINISTRATION

PROGRAMME 1: ADMINISTRATION

Strategic Objective : Adequate and appropriately skilled staff Performance indicator Target 2014/15 Percentage vacancy

Strategic Objective : Adequate and appropriately skilled staff Performance indicator Target 2014/15 Percentage vacancy rate Percentage turnover rate 9. 5% 10% Target 2018/19 8% 5% Percentage implementation of PMDS 95% compliance to contracting policy framework requirements requirement 95% compliance to assessments requirements Number of HRD strategy initiatives 3 interventions: implemented 100 interns recruited, 70 bursaries issues, 80% WSP implemented Strategic Objective : Secure, harmonious, transformed and conducive working environment Percentage Women, Blacks and • Women 50% • 50% Women People with disabilities in DEA • Blacks 90% • 90% Blacks • People with disabilities 2% • 2% People with disabilities Average number of days taken to • 90 days for misconduct cases resolve disciplinary cases • 30 days for grievance cases Phased implementation of DEA New Phase I of operation Phase III (Operations) PPP Head-Office Building PPP project implemented (service Agreement for DEA Head-Office commenced as per project Building project Implemented plan) Percentage implementation of security 90% Implementation of security 95% Implementation of security risk assessment recommendations risk assessment

Strategic Objective : Efficient and Effective Information Technology service Performance indicator Target 2014/15 Number

Strategic Objective : Efficient and Effective Information Technology service Performance indicator Target 2014/15 Number of funded Master Systems Plan (MSP) initiatives implemented as (per schedule) Percentage availability of IT services 9 funded Master System Plan initiatives implemented (per schedule) 97% availability of IT services Strategic Objective : Equitable and sound corporate governance Percentage compliance with statutory 100% compliance with tabling and prescripts statutory tabling and prescripts (all MPTA standard moderated score of 3 and above) Unqualified audit report Unqualified Audit Report 10 funded Master System Plan (MSP) initiatives implemented (per schedule) 99% availability of IT services 100% compliance with statutory tabling and prescripts (All MPTA Standard with moderated score of 3 and above) Unqualified Audit opinion Percentage adherence to Cabinet and 100% Cluster schedule as per approved protocol Percentage expenditure 98% 100% Percentage of expenditure on affirmative 65% procurement Strategic Objective : Improved access to information 65% Number of media statements and speeches issued and number of opinion pieces published Number of communication events including Ministerial Public Participation Programme (PPP) events 120 statements/ speeches Target 2018/19 98% 120 statements and speeches issued 6 opinion pieces 8 opinion per annum 20 Public Participation events 20 events per annum hosted

Strategic Objective : Improved access to information Performance indicator Target 2014/15 Number of publications

Strategic Objective : Improved access to information Performance indicator Target 2014/15 Number of publications produced and 4 editions of stakeholder publications distributed Number of website hits per annum Target 2018/19 6 editions of stakeholder publications per annum 450 000 website hits per 660 000 hits per annum Strategic Objective : Improved sector education and awareness Number of Environmental Awareness 100 teachers trained activities conducted (Learnerships, CAPS 100 unemployed recruited and learnership programme training and Campaigns) implemented 8 environmental awareness campaigns implemented Number of SETA sector skills plans with 6 Sector Skills Plans with environmental focus Number of officials undergoing/completed 400 officials trained in IEM Environmental Management training and 240 EMIs trained EMI/IEM 10 environmental activities conducted: • Training of 100 teachers trained per annum • Enrollment of 100 learners on learnership per annum • 8 environmental awareness campaigns conducted 21 Sector skills plans with environmental focus • • 440 officials undergoing Integrated Environmental Management training as per the approved IEM training program 200 Environmental

Strategic Objective : Improved sector education and awareness Performance indicator Target 2014/15 Number of

Strategic Objective : Improved sector education and awareness Performance indicator Target 2014/15 Number of accredited training person 166 713 days created Target 2018/19 210 459 (964 274 cumulative) Strategic Objective : Effective knowledge and information management for the sector Outcome 10 Delivery Agreement developed and implementation facilitated Outcome 10 Delivery Agreement 2009 -2014 Number of environmental knowledge and information management systems/tools developed, refined and or operational (EGIS, NEAS, O&C Online system, CC M&E system etc) Technical development of the system continued (specifications defined) GIS internet developed Phase I of the South African National Environmental Information Meta-database finalised Outcome 10 Delivery Agreement finalised and Quarterly implementation reports submit to Cabinet 6 Knowledge /information systems • Implementation of the ocean and coastal online information system • Geo Portal developed and operational • The NDP 2030 objective of ‘a set of indicators for natural resources, accompanied by publication of annual reports on the health of identified resources to inform policy’ is met

Strategic Objective : Effective knowledge and information management for the sector Performance indicator Target

Strategic Objective : Effective knowledge and information management for the sector Performance indicator Target 2014/15 Number of environmental knowledge and information management systems/tools developed and implemented/operational (Continues…) 2 components of NEMA Chapter 5 Environmental Regulatory Authorisation system monitored (EIA amended timeframes module and the appeals module) Design of Climate Change response M&E system approved 50% od facilities with AELs reporting to the NAEIS Target 2018/19 • • • 4 x Component tools of the NEMA Chapter 5 Environmental Regulatory Authorisation system monitored (EIA, Waste, S 24 G, appeals) Tracking of SA’s transition to lower carbon economy and climate resilient society is operational, communicated and influential 100% of facilities with AELs reporting to the NAEIS

Strategic Objective : Effective knowledge and information management for the sector Performance indicator Number

Strategic Objective : Effective knowledge and information management for the sector Performance indicator Number of environmental knowledge and information management, monitoring and evaluation reports/publications and response options produced Target 2014/15 State of the Oceans report compiled 18 peer-review scientific publication (including theses) 1 South African Environmental Outlook (2 nd SAEO) completed and published 1 reviewed ( NSSD 1 M&E Report finalised) Target 2018/19 30 reports/ publications and response options • Annual State of the Oceans Report compiled. • 26 peer-reviewed scientific publications (including theses). • Draft third SAEO • First Official Environmental statistical release • Sector compliance report on the implementation of the reviewed performance measures

Strategic Objective : Effective cooperative governance and local government support Performance indicator Target 2014/15

Strategic Objective : Effective cooperative governance and local government support Performance indicator Target 2014/15 Target 2018/19 Local government support strategy Annual action plan Local government support developed and implemented (100% strategy reviewed annual implementation) action plan implemented (100% implementation of annual action plan) Percentage of Sector conflict 50% of received conflict 80% of received cases resolved management cases dealt with (in line with NEMA chapter 4 on tools implemented NEMA Chapter 4 provisions) Conflict resolution provisions Strategic Objective: Enhanced International governance, instruments and agreements supportive of SA environmental and sustainable development priorities Number of South African positions on • 13 Bilateral/Pleurilateral 56 Positions (Africa, IBSA, S-S, S-N) • 17 Bilateral/Pleurilateral (Africa, Chemical and Waste, Biodiversity, approved • IBSA, S-S, S-N) Sustainable Development (SD), African • Seven Multilateral (SD and IEG) and bilateral South-North • 3 multilateral positions • 14 Biodiversity positions (SD and IEG) approved • Two formal UNFCCC and international environmental governance (IEG) processes prepared, • 3 Chemicals and Waste informal • ministerial meetings: negotiated and reported positions approved • 16 Chemical & Waste position • 10 Biodiversity positions and papers and 16 reports approved drafted • 2 Climate Change positions formal international engagement (UNFCCC) developed and approved

Strategic Objective : Enhanced International governance, instruments and agreements supportive of SA environmental and

Strategic Objective : Enhanced International governance, instruments and agreements supportive of SA environmental and sustainable development priorities Performance indicator The financial value of resources raised from multilateral and bilateral donors to support the department’s SA and Africa’s programmes Mandatory international and national reports prepared and submitted within time frame (in terms of relevant legislation and/or international obligations/conventions) Target 2014/15 Target 2018/19 US$30 Million from all sources (Multilateral: US$20 Bilateral: US$10 Million) Total of US$ 195 Million raised between 2014 -19 Million; 2013/14 NEMA S 26 report tabled to • Parliament within timeframe First Biennial Update Report • completed and submitted to UNFCCC Principles and procedures for • compilation of TNC finalised Draft GHG Inventory 2000 -2012 compiled • 2017/18 NEMA S 26 report tabled to Parliament within timeframe 3 rd Biennial Update Report completed and submitted to the NFCCC Scope of information for the Fourth National Communication completed Draft GHG Inventory 20002016 compiled

PROGRAMME 2: LEGAL AUTHORISATIONS COMPLIANCE AND ENFORCEMENT 13

PROGRAMME 2: LEGAL AUTHORISATIONS COMPLIANCE AND ENFORCEMENT 13

Strategic Objective : Improved compliance with environmental legislation Performance indicator Target 2014/15 Target 2018/19

Strategic Objective : Improved compliance with environmental legislation Performance indicator Target 2014/15 Target 2018/19 Number of environmental authorisations 135 165 inspected Percentage of administrative enforcement 75% 80% actions resulting in compliance Compliance and Enforcement Strategy for the Final strategy approved • 90% of strategy Environmental Management Inspectorate for implemented developed and implemented implementation across all • Strategy reviewed EMI institutions Number of criminal investigations finalised and 26 44 dockets handed over for prosecution Number of interventions implemented for safety 4 interventions facilitated: • 4 Interventions and security of wildlife including rhinoceros • Review of the national implemented for the populations in South Africa strategy for the safety and Safety & Security of security of rhinoceros populations in population in SA Africa South Africa • Mo. Us with strategic government departments (Justice and Constitutional Development, Home Affairs, Correctional services and police) on safety and security of wildlife including rhino

Strategic Objective : Improved compliance with environmental legislation Performance indicator Number of interventions implemented

Strategic Objective : Improved compliance with environmental legislation Performance indicator Number of interventions implemented for safety and security of wildlife including rhinoceros populations in South Africa (Continues…) Target 2014/15 • Implementation of corrective actions relating to the implementation of TOPS regulations monitored in two provinces • Compliance assessments on the implementation of CITES Regulations Target 2018/19 • 5 200 wildlife monitors trained and developed 1 100 environmental monitors trained and deployed Strategic Objective : Potential negative impacts of all significant developments prevented or managed Number of tools for mitigation of negative Minimum requirements for 4 tools finalised impacts of developments to biodiversity in land use developed planning and IEM finalised

PROGRAMME 3: OCEANS AND COASTS 16

PROGRAMME 3: OCEANS AND COASTS 16

Strategic Objective : Ocean and coastal environment protected and conserved Performance indicator Target 2014/15

Strategic Objective : Ocean and coastal environment protected and conserved Performance indicator Target 2014/15 Report on the analysis of legislative Ocean management regime framework with implication on ocean developed governance in SA Finalised Implementation plan for the Ocean Management policy Developed Strategies and plans for management of ocean and coastal environment developed and implemented Target 2018/19 Ocean Management regulations promulgated National framework implemented • NCMP launched and implementation plan developed • • Additional 1 plan updated • 1 oil spill readiness exercise and 1 training session held 5 estuary management plans Developed National Ocean and Coast spatial framework implemented Updating and expansion of the NCMP as required 15 of 25 local oil pollution emergency response plans updated One oil spill readiness exercise and one training session held per annum

Strategic Objective : Ocean and coastal environment protected and conserved Performance indicator Target 2014/15

Strategic Objective : Ocean and coastal environment protected and conserved Performance indicator Target 2014/15 Target 2018/19 Strategies and plans for management of ocean and coastal environment developed and Implemented (Continues…) One new draft protected Marine Species Plan developed (Turtle) • • 45 estuary management plans finalised (additional 5) 6 protected marine species with management plans/policy

Strategic Objective : Ocean and coastal environment protected and conserved Performance indicator Target 2014/15

Strategic Objective : Ocean and coastal environment protected and conserved Performance indicator Target 2014/15 Target 2018/19 Percentage increase of coastline under MPA’s with partial or full Protection Full Protection of 9. 5% (342/3 14. 5%(522/3600) partial 600 km), and partial protection of protection and 13. 5 % (486/3 600 km) 11. 5%(414/3600) full protection (Agulhas; Wilderness; Tugela Percentage increase of total area of EEZ under protection and Managed Draft monitoring proposal for Prince Edward Island developed 3. 5% (52500/1500000) of offshore environment protected Number of relief voyages to remote stations (Antarctica and Islands) Undertaken 3 relief voyages undertaken to SANAE, Gough and Marion Islands 3 relief voyages undertaken per annum

Strategic Objective : Strengthened science policy interface Performance indicator Target 2014/15 4 Surveys of

Strategic Objective : Strengthened science policy interface Performance indicator Target 2014/15 4 Surveys of priority habitats • Ocean and coastal research projects survey completed and monitoring Seabird population estimates • projects undertaken for: • 12 species around SA • 2 Southern Ocean species 2 Coastal research projects • completed • Target 2018/19 8 surveys of representative or priority habitats Annual seabird population estimate for : 12 species around SA and 4 additional Southern Ocean species Aerial Survey of seal colonies in the BCC region (3 -year cycle) 6 Coastal research projects completed Number of observational platforms contributing to an Ocean and coastal observation and monitoring Network 6 Observational platforms deployed 14 Observational platforms deployed and maintained Number of ecosystem process studies undertaken 2 Multidisciplinary ocean functioning projects undertaken (in Benguela and Agulhas currents).

Strategic Objective : Strengthened science policy interface Performance indicator Target 2014/15 Number of interventions

Strategic Objective : Strengthened science policy interface Performance indicator Target 2014/15 Number of interventions aimed at Biodiversity Research advancing the biodiversity science policy strategy finalised interface. National IPBES hub established. Elephant research strategy approved. Phase 1: UNCCD DLDD land cover mapping impact indicator research finalised. Report on the extent of MON 810 insect resistance finalised. 2 Science/policy input Reports compiled on Risk Analysis for intensive breeding in the wildlife sector; and State of play report on Predator control and Conservation Target 2018/19 8 Interventions (6 research programmes developed, Biodiversity Research strategy implemented and monitored and national IPBES hub established and functional. .

PROGRAMME 4: CLIMATE CHANGE AND AIR QUALITY 22

PROGRAMME 4: CLIMATE CHANGE AND AIR QUALITY 22

Strategic Objective : Climate change impacts effectively managed Performance indicator Target 2014/15 Target 2018/19

Strategic Objective : Climate change impacts effectively managed Performance indicator Target 2014/15 Target 2018/19 Number of sectors for which Long Term Adaptation Scenarios have been Developed Reports of phase 2 Long-term Adaptation Scenarios finalised for Human Settlement (Urban/ Rural/Coastal) and Disaster Management sectors Long-term Adaptation Scenarios for SA completed for 8 sectors (Water, Health, Biodiversity, Agriculture, Marine Fisheries, Human Settlement. Urban/ Rural/Coastal, Disaster Risk Reduction) Number of climate change adaptation studies conducted Draft report of the Situational analysis and needs assessments (SANAs) of provincial CC response planning & adaptive capacity completed 3 climate change adaptation research studies conducted including Sub. Regional Assessment of climate change impacts • Cross sectoral research on climate change impact and adaptation options conducted on food, water, health and energy security, • Economic Impact - Assessment/analysis (Integrated Economic assessment of climate change Impact cost, and adaptation costs and benefits

Strategic Objective : Climate change impacts effectively managed Performance indicator Target 2014/15 Target 2018/19

Strategic Objective : Climate change impacts effectively managed Performance indicator Target 2014/15 Target 2018/19 Number of sector adaptation plans aligned with the National climate change response policy Recommendations for 4 sectors on mainstreaming climate change adaptation response measures into sector plans and policies: • Human settlement (Urban, Rural and Coastal) • Disaster managements 7 sector plans reviewed and aligned: • Water • Biodiversity • Agriculture • Marine Fisheries • Human Health • Human Settlement (Urban/Rural/Coastal) • Disaster Management National adaptation strategy developed and implementation facilitated Framework for the National Climate Change Adaptation Strategy for South Africa developed. • National Framework for Climate Services developed and implemented Draft Framework for National Climate Services developed Framework for National Climate Services finalised and implementation facilitated • National Adaptation Strategy Developed and implemented. Sectoral, Provincial/ Geographical Climate Change Adaptation Plans developed and implementation facilitated.

Strategic Objective : A fair contribution to the global effort to stabilise GHG concentrations

Strategic Objective : A fair contribution to the global effort to stabilise GHG concentrations in the atmosphere facilitated Performance indicator Target 2014/15 Target 2018/19 Number of sector mitigation potential and impact studies conducted Draft National Carbon Sinks Atlas Number of Climate Change Response Policy interventions implemented My 2050 Pathways Calculator developed Updated mitigation potential and impact studies conducted 5 sectors • (Energy, Industry, Transport, Agriculture and Forestry, and Waste) • National carbon sinks atlas finalised • My 2050 Calculator 4 climate change response policy interventions: • Desired emission reduction outcomes DEROs (Desired Emission (DEROs) for 5 economic sectors Reduction Outcomes) for 5 Sectors finalized developed • Mix of measures for achieving the Mix of measures for 5 sectors desired emission reduction outcomes developed in 5 economic sectors (including carbon budgets) finalised • SA’s emissions trajectory refined and updated • Impact and effectiveness of Climate Change response Flagship programmes are quantified, communicated and scaled up

Strategic Objective : A fair contribution to the global effort to stabilise GHG concentrations

Strategic Objective : A fair contribution to the global effort to stabilise GHG concentrations in the atmosphere facilitated Performance indicator Target 2014/15 Target 2018/19 Number of sector mitigation plans aligned with the National Climate Change response Policy Guidelines for mitigation plans finalised • • 5 Mitigation plans Guideline for mitigation plans Strategic Objective : Cleaner and healthy air The National Air Quality Indicator (NAQI) 1. 135 Number of air quality 90 monitoring stations reporting to SAAQIS AQA Regulatory framework developed and implemented 1. 115 • • 110 air quality monitoring stations reporting to SAAQIS 50 stations meeting 80% data recovery Emissions Offset Policy for AQM published Establishment of comprehensive asset management system Old vehicles declared as controlled Draft S 23 – Small Scale Charcoal emitters (S 23) Plants Declared as Controlled 2018/19 Annual Plans of the Emitters National Priority area AQMPs Priority Areas (Highveld and Vaal Triangle implemented Update on the Priority Area Health Airshed) 2014/15 Annual Plan Studies Implemented Waterberg-Bojanala Priority Area AQMP and Threat

PROGRAMME 5: BIODIVERSITY AND CONSERVATION 27

PROGRAMME 5: BIODIVERSITY AND CONSERVATION 27

Strategic Objective : Biodiversity conserved, protected and threats mitigated Performance indicator Target 2014/15 Target

Strategic Objective : Biodiversity conserved, protected and threats mitigated Performance indicator Target 2014/15 Target 2018/19 Percentage of land under conservation 11. 2%( 13 660 1014/ 121 991 200 ha) 13. 7% (16 712 794/ 121991200 ha) Number of sites added to the World Heritage List Dossier for Nelson Mandela Liberation and Reconciliation Memorials submitted to UNESCO (for inclusion as World Heritage site) 3 sites added to the World Heritage List NPAES Reviewed and implemented. NPAES Reviewed Revised NPAES implemented. Number of additional stewardship sites established. 3 additional stewardship sites established. 1 additional stewardship site established Percentage of area of state 86 % of area of state managed protected Areas assessed protected areas assessed with a METT score above 67%. a METT score above 67 % 90% of area of state managed protected areas assessed with a METT score above 67%.

Strategic Objective : Biodiversity conserved, protected and threats mitigated Performance indicator Target 2014/15 Target

Strategic Objective : Biodiversity conserved, protected and threats mitigated Performance indicator Target 2014/15 Target 2017819 Number of conservation and legislative tools to ensure the protection of species and ecosystems developed and implemented. 14 legislative and conservation tools: Regulations for the registration of Professional Hunters, trainers and Hunting Outfitters published for implementation 20 Legislative and conservation tools developed and implemented. • Regulations for the registration of Professional Hunters Hunting Outfitters and trainers • Norms and standards for the Review of the norms and management of elephants standards for the management of • TOPS regulations and guideline elephants in South Africa initiated • BABS amendments regulations and amendments Drafted • NEMBA , NBSAP, National TOPS regulations published for Cycad Action Plan • NEMPAA Amendment Bill ( implementation and draft MPAs) guideline for implementation • TFCAs and WHS incorporated Developed in NEMPAA Amendment Bill BABS Amendments Regulations • Norms and standards for the approved by Inter-governmental management of protected areas structures NEMBA review completed Amendment Bill to incorporate MPAs into NEMPAA finalised

Strategic Objective : Biodiversity conserved, protected and threats mitigated Performance indicator Target 2014/15 Target

Strategic Objective : Biodiversity conserved, protected and threats mitigated Performance indicator Target 2014/15 Target 2018/19 Number of conservation and legislative tools to ensure the protection of species and ecosystems developed and implemented. (Continues…) A draft Amendment Bill incorporating provisions relating to TFCAs and WHS reserves into NEMPAA developed • Norms and Standards for the management of protected areas finalised • Draft Norms and standards for declaration and inclusion of private nature reserves Completed Amendment of regulations for Special Nature Reserves, World Heritage Sites and National Parks published for Implementation Draft BMP for 1 ecosystem developed • • • Norms and standards for declaration and inclusion of private nature reserves completed Regulations for Special Nature Reserves, Regulations for World Heritage Sites Regulations for National Parks BMP for ecosystem 2 * Biodiversity Management Plans for African Lion and White Rhino BMP-S for Bearded Vulture National Cycad Management Strategy

Strategic Objective : Biodiversity conserved, protected and threats mitigated Performance indicator Target 2014/15 Target

Strategic Objective : Biodiversity conserved, protected and threats mitigated Performance indicator Target 2014/15 Target 2018/19 Number of conservation and legislative tools to ensure the protection of species and ecosystems developed and implemented. (Continues…) 2 Biodiversity Management Plans for species finalised for public participation (African Lion, White Rhino) , and one BMP-S finalised for implementation (Bearded Vulture) National Cycad Management Strategy and Action Plan approved for implementation NBSAP Review conducted

Strategic Objective : Biodiversity conserved, protected and threats mitigated Performance indicator Target 2014/15 Target

Strategic Objective : Biodiversity conserved, protected and threats mitigated Performance indicator Target 2014/15 Target 2018/19 Number of tools to mitigate threats to NAP review and alignment with 3 tools implemented biodiversity the UNCCD 10 year Strategy and Framework finalised Draft Biodiversity climate change adaptation plans for 9 biomes Developed Minimum requirements for biodiversity in land use planning and IEM finalised Tools for the implementation of the Ramsar Convention developed and implemented. One Ramsar site designated. • Draft strategy to remove sites from the Montreux record Developed • Implementation of Ramsar site management plans monitored. 2 Ramsar sites removed from the Montreux Record.

Strategic Objective : Fair access and equitable sharing of benefits from biological resources promoted

Strategic Objective : Fair access and equitable sharing of benefits from biological resources promoted Performance indicator Target 2014/15 Target 2018/19 Biodiversity Sector transformation framework developed and implemented. Biodiversity sector transformation framework finalised Framework implemented. Number of sustainable natural resource based interventions and instruments identified, developed and implementation facilitated. National Biodiversity Economy Development Strategy finalised 20 interventions and instruments 2 Biodiversity Economy development projects supported for implementation 1 cross border trail operationalised One Project from the TFCA Catalogue implemented 3 natural resource based projects implemented (People & Parks, Bushbuckridge, Awelani) One TFCA Natural Resource based project implemented (Awelani)

PROGRAMME 6: ENVIRONMENTAL SECTOR PROGRAMMES AND PROJECTS 34

PROGRAMME 6: ENVIRONMENTAL SECTOR PROGRAMMES AND PROJECTS 34

Strategic Objective : Improved socio-economic benefits within the environmental sector Performance indicator Target 2014/15

Strategic Objective : Improved socio-economic benefits within the environmental sector Performance indicator Target 2014/15 Target 2018/19 Number of Full Time Equivalents (FTEs) created Number of Work Opportunities created (% of Women; % of Youth & % of People with Disabilities) Number of youths benefiting from the youth Environmental Service Percentage of young people placed in exit opportunities (YES) Number of overnight visitor and staff accommodation units established and/or renovated Number of school desk equivalents 37 036 41 539 (192 066)* 69 158 (Women- 55%; Youth – 60% & People with Disabilities – 2%) 900 78 081(359 928)* (Women 55%; Youth- 65 & People with Disabilities- 2%) 75% 28 60 (238)* 150 000 (750 000)* 1 350 (5 460)* Strategic Objective : Ecosystem services restored and maintained Number of wetlands under rehabilitation 115 160 (695)* Number of hectares of land where invasive alien plants treated/cleared (Initial Treatment) Number of hectares of land where follow up invasive alien plants treated/cleared (Follow up Treatment) 172 516 208 180 (1 037 686)* 583 686 665 885 (3 228 744)*

Strategic Objective : Ecosystem services restored and maintained Performance indicator Target 2014/15 Target 2018/19

Strategic Objective : Ecosystem services restored and maintained Performance indicator Target 2014/15 Target 2018/19 Number of hectares of degraded land 31 262 38 902 (176 758) under repair Number of kilometres of accessible 2 113 km coastline cleaned Percentage of wild fires suppressed 90% (provided there are not more than 2000 Strategic Objective : Enhanced contribution of the environmental sector towards Sustainable development and transition to a green economy Number of sustainable development Concept document for 1 strategy developed and tools/ NSSD 2 developed implemented (NSSD 2 under instruments developed and implemented implementation) Number of Green Fund projects 38 Green Fund projects 50 Green Fund projects approved for implementation and implemented Number of high-level environmental and Quarterly early warning • Quarterly early warning and/or sustainable development threat, and/or issue scanning and weakness reports identification reports 4 emerging issue response or opportunity early warning and/or • 4 emerging issue response options formally submitted to top management and options researched and developed top management and approved responses initiated, responses initiated where necessary

Strategic Objective : Enhanced contribution of the environmental sector towards Sustainable development and transition

Strategic Objective : Enhanced contribution of the environmental sector towards Sustainable development and transition to a green economy Performance indicator Target 2014/15 Target 2018/19 Number of interventions for streamlining environmental authorisations finalised 1 legal instrument under evaluation and adjustment (adoption of environmental instruments). 4 legal instruments gazetted for implementation (EIA, financial provisioning and mine closure regulations and revised listing notices Readiness plan for the registration of ESPASA Developed 1 initiative on hydraulic fracturing of shale gas coordinated and supported 6 interventions for streamlining environmental authorisations for SIP and IPAP priorities developed 1 sector guideline developed (mining review guideline) • • 9 IEM instruments evaluated, adjusted or developed. 18 interventions for streamlining environmental authorisations in place 2 Departmental initiatives on hydraulic fracturing of shale gas coordinated and supported Environmental sector supported by a registration body

PROGRAMME 7: CHEMICALS AND WASTE MANAGEMENT 38

PROGRAMME 7: CHEMICALS AND WASTE MANAGEMENT 38

Strategic Objective : Less waste that is better managed Performance indicator Target 2014/15 Number

Strategic Objective : Less waste that is better managed Performance indicator Target 2014/15 Number of waste management • instruments developed and • implemented • • • HCRW Management Regulations finalized Norms and standards for the validation of the treatment efficacy and operation of noncombustion technology use to treat health care risk waste finalised Draft import-export regulations developed Raft norms and standards/guidelines for preparation of waste derived fuel (WDF)developed Draft norm and standards for the sorting, shredding, grinding or bailing of general waste developed Target 2018/19 8 instruments finalised and implemented • HCRW Management Regulations • Norms and Standards for the validation of the treatment efficacy and operation of a noncombustion technology used to treat health care risk waste • Regulations for import and export of waste • Norms & Standards/Guidelines for the Preparation of Waste Derived Fuels • Waste Act Amendments • National hazardous waste management plan • Waste Tyre Regulations Amendments • Norms and Standards for composting

Strategic Objective : Less waste that is better managed Performance indicator Target 2014/15 Percentage

Strategic Objective : Less waste that is better managed Performance indicator Target 2014/15 Percentage increase in waste being 10% reused, recycled and recovered Number of integrated industry waste 2 integrated industry waste management plans reviewed Percentage of unlicensed waste 80% of unlicensed sites licensed disposal sites authorised per annum Number of buyback centres established 11 Target 2018/19 80% of waste tyres reused, recycled and recovered 3 industry waste management planed reviewed 100% 6 (33)* Strategic Objective Impacts of chemicals better managed Number of chemical management • instruments developed and implemented • • • National Implementation Plan for the Stockholm convention updated Draft PCB phase out plan for municipalities developed Study on impact of Minamata Convention on Mercury Conducted Draft national chemicals profile Developed 8 instruments developed • National Plan for HCFC phase out updated • National Implementation Plan for the Stockholm Convention updated • National Action Plan for Rotterdam Convention updated • PCB phase out plan for municipalities developed • Study on impact of Minamata Convention on Mercury undertaken • Minamata Convention Ratified • Draft National Chemicals Profile developed • National Chemicals

SERVICE DELIVERY STANDARDS PERFORMANCE INDICATORS 41

SERVICE DELIVERY STANDARDS PERFORMANCE INDICATORS 41

PROGRAMME 1: ADMINISTRATION Strategic Objective : Equitable and sound corporate governance Performance indicator Target

PROGRAMME 1: ADMINISTRATION Strategic Objective : Equitable and sound corporate governance Performance indicator Target 2013/14 Percentage of reported fraud and 100% corruption allegations dealt within timeframes Strategic Objective : Improved access to information Percentage of Presidential Hotline 100% queries processed within time frames (within 3 working days) Percentage of parliamentary questions 95% /requests and requests from members of the public responded to within time frames Target 2017/18 100% 95% 42

PROGRAMME 2: LEGAL AUTHORISATIONS COMPLIANCE AND ENFORCEMENT Strategic Objective : Improved compliance with environmental

PROGRAMME 2: LEGAL AUTHORISATIONS COMPLIANCE AND ENFORCEMENT Strategic Objective : Improved compliance with environmental legislation Performance indicator Target 2013/14 Target 2017/18 % of all DEA complaints and Incidents 90% 95% responded to through a compliance and/or enforcement action in accordance with the timeframe set in the referral protocol Strategic Objective : Potential negative impacts of all significant developments prevented or managed % of environmental decisions processed 75% 79% within the prescribed time frames (provide not more than 400 applications are received per annum) Strategic Objective : Effective Legal Support % of appeals finalised within the timeframes % of litigation matters dealt with in terms of court rules or by agreement between litigating parties Percentage compliance with the implementation of PAIA 85% 95% 95%

PROGRAMME 3: OCEANS AND COASTS Strategic Objective : Improved compliance with environmental legislation Performance

PROGRAMME 3: OCEANS AND COASTS Strategic Objective : Improved compliance with environmental legislation Performance indicator Target 2013/14 Target 2017/18 Percentage of applications for permits 100% issued within timeframe ( Marine Research permits , Off-Road Vehicle permits , Dumping permits & permits for Activities within Marine Protected areas) PROGRAMME 5: BIODIVERSITY AND CONSERVATION Strategic Objective : Biodiversity conserved, protected and threats mitigated Percentage of applications for permits assessed and issued with prescribed timeframe (GMO, CITES, TOPS & BABS permits) 100% PROGRAMME 7: CHEMICALS AND WASTE MANAGEMENT Strategic Objective : Less waste that is better managed Percentage of Waste Licence 95% applications finalised within legislated time frames (provided not more than 200 applications received) 95%