Overview and Case Study on 500 KWp Solar

  • Slides: 16
Download presentation
Overview and Case Study on 500 KWp Solar power plant at DMRC Sector 21

Overview and Case Study on 500 KWp Solar power plant at DMRC Sector 21 Dwarka Station by Sun. Edison Leading Renewable Energy Development Company in the World By : Jai Prashanth Parakkat

A global Renewable Energy Leader We develop, build, finance, and operate renewable energy plants

A global Renewable Energy Leader We develop, build, finance, and operate renewable energy plants

Sun. Edison’s Global Presence Belmont, California Madrid, Spain Sun. Edison’s Regional Headquarters: § Asia

Sun. Edison’s Global Presence Belmont, California Madrid, Spain Sun. Edison’s Regional Headquarters: § Asia Pacific– Chennai, India Singapore § Europe & MENA – Madrid, Spain § America – Belmont, California MEMC Offices/ Manufacturing Facilities St. Peters, Missouri Santa Clara, California Sherman, Texas Paris, France Novara, Italy Shanghai, China Hsinchu, Taiwan Seoul, South Korea Tokyo, Japan Singapore . Sun. Edison Downstream Locations Belmont, California Toronto, Canada San Francisco, California Denver, Colorado Beltsville, Maryland Pennsauken, NJ Shanghai, China Taipei, Taiwan Seoul, South Korea Manila, Philippines Chennai, India Bangkok, Thailand Madrid, Spain Johannesburg, South Africa Kuala Lumpur, Malaysia Sydney, Australia Tokyo, Japan Dubai, UAE Riyadh, KSA

India Presence Highlights Installed base: 90. 30 MWp in 3 years in India ~8

India Presence Highlights Installed base: 90. 30 MWp in 3 years in India ~8 MWp projects being constructed in this quarter ‘ 1 -A’ accredited Channel partner with MNRE Established India’s first private solar energy sale Key projects include • • • 1 MWp Narmada Canal 2. 2 Gujarat Rooftop programme 500 k. Wp Delhi Metro 18. 75 MWp Solar Park in Tamil Nadu 100 MWp won in JNNSM-II

Leader in Utility Scale Solar projects in India

Leader in Utility Scale Solar projects in India

Leader in Distributed Generation Projects

Leader in Distributed Generation Projects

Built the First Solar City in India 2. 2 MW of Solar Rooftop Projects

Built the First Solar City in India 2. 2 MW of Solar Rooftop Projects in Gandhinagar, Gujarat

Malaysia – KLIA Airport (19 MW)

Malaysia – KLIA Airport (19 MW)

Sun. Edison Services – Global Footprint 4 CONTINENTS. . . END-TO-END MONITORING SOLUTIONS 2000

Sun. Edison Services – Global Footprint 4 CONTINENTS. . . END-TO-END MONITORING SOLUTIONS 2000 MW >800 PLANTS GLOBAL LOGISTIC EXPERIENCE 3 ROC’s RENEWABLE OPERATIONS CENTERS Sun. Edison service provide system reliability and higher power plant production enabling maximum return on investment. Sun. Edison operates and monitors a large portfolio of self-owned and third-party PV power plants across the globe. Sun. Edison Services is a business unit of Sun. Edison, and is also a separate legal entity, whollyowned by Sun. Edison, LLC. Belmont (CA), Madrid (Spain), and Chennai (India) are all locations with Renewable Operations Centers. 9

DMRC Installation – Case Study

DMRC Installation – Case Study

What the DMRC -project is all about DMRC wanted to put up its first

What the DMRC -project is all about DMRC wanted to put up its first 500 KWp Solar power plant at Sector 21 Dwarka Metro Station. Sun. Edison was the successful bidder under SECI tender for subsidy - Delhi State Proposed an apt solution with attractive tariff (flat for first 3 years and subsequently an increase of till 15 years and thereafter a flat tariff till 25 years. Helping in hedging the rising power costs for 25 years No hassles for DMRC to maintain the system in terms of O&M and warranty management since the asset owned by Sun. Edison DMRC has to pay for only energy generated

Challenges Discussion on the terms of the PPA Installation was to be done at

Challenges Discussion on the terms of the PPA Installation was to be done at rooftop of a fully functional metro station Had stiff timelines to meet. No penetration type structure solution to be provided. Cable routing system was critical. Interconnection to the existing LT system

Timelines Receipt of LOI : 29 th January 2014 PPA signing – 20 th

Timelines Receipt of LOI : 29 th January 2014 PPA signing – 20 th February 2014 Commencement of work – 16 th June 2014 Commissioning – 27 th June 2014 ( In record 11 days)

Technical Details Solar Modules –Multicrystalline type - 300 Wp - 1670 Nos 20 KW

Technical Details Solar Modules –Multicrystalline type - 300 Wp - 1670 Nos 20 KW String Inverters– 20 Nos Penetration less type Structures – Delta racks AC Side - 3. 5 C X 16 Sqmm and 3. 5 C X 300 Sqmm- Al XLPE FRLS cable Data Monitoring System – Sun. Edison Energy & Environmental Data Systems ( SEEDS) Connectivity at 415 V to the existing LT panel

Way forward Sun. Edison is executing similar 1. 5 MWp project at Yamuna bank

Way forward Sun. Edison is executing similar 1. 5 MWp project at Yamuna bank Yard and Station