Out Growing the Square You Live In Australian

  • Slides: 22
Download presentation
Out Growing the Square You Live In Australian Catholic University Mcauley Campus Relocation QUESTNET

Out Growing the Square You Live In Australian Catholic University Mcauley Campus Relocation QUESTNET 2003 David Elkin d. elkin@mcauley. acu. edu. au

A Brief History • ACU Founded 1991 • 6 Campuses • • • Aquinas

A Brief History • ACU Founded 1991 • 6 Campuses • • • Aquinas – Ballarat St Patrick’s – Melbourne Mt Saint Mary – Sydney Mackillop – North Sydney Signadou – Canberra Mcauley – Brisbane • Public University

The Need to Move • Mcauley@Mitchelton Campus required to expand. • Increase demand for

The Need to Move • Mcauley@Mitchelton Campus required to expand. • Increase demand for undergraduate and postgraduate places. • The need to accommodate future growth. • Where?

Mcauley@Banyo • Pius XII Provincial Seminary • Refurbished • New Additions • Library •

Mcauley@Banyo • Pius XII Provincial Seminary • Refurbished • New Additions • Library • Academic Teaching Centre • Business and IT faculty Wing • Five Schools offering • • • Education Nursing Arts Social Science Theology Business and Information Systems • Plus a wide range of postgraduate courses

Requirements • • • Implementation of IT Infrastructure Run both campuses simultaneously Relocation of

Requirements • • • Implementation of IT Infrastructure Run both campuses simultaneously Relocation of national systems Relocation of all Brisbane based systems Migrate VOIP telephony services Relocation of Student Administration/Services Relocation of national helpdesk Relocation of computer labs Relocation of academic and general staff work spaces

Network Preparation • Rationalisation of existing subnets • • 3 Class C IP address

Network Preparation • Rationalisation of existing subnets • • 3 Class C IP address spaces Server subnet Identified as migration subnet Move services between subnets Identified second VOIP subnet • Implementation of NAT • 3 NAT Class A IP address spaces

Banyo Infrastructure • • Construction Site Access Each Building cabled with CAT 6 Buildings

Banyo Infrastructure • • Construction Site Access Each Building cabled with CAT 6 Buildings interconnected by fibre Siemon Cabling One Server room Six Communications Rooms 34 Mb Microwave Link to QRNO Cisco active equipment

Banyo Prepartions • ATI Microwave Installation • Server room completed • Available Communication Rooms

Banyo Prepartions • ATI Microwave Installation • Server room completed • Available Communication Rooms completed • UPS installed • Air-conditioning installed • Cabling tested & certified • Cisco 3524’s installed

Cross Campus Connectivity • Banyo infrastructure in place • Liaison with UQ for microwave

Cross Campus Connectivity • Banyo infrastructure in place • Liaison with UQ for microwave location • Mt Cootha Repeater • Liaison with QRNO to plan incremental cut over of subnets.

Server Facility Relocation • • Last full Friday backup QRNO re-route migration subnet COPE

Server Facility Relocation • • Last full Friday backup QRNO re-route migration subnet COPE sensitive transport Physical move AM Saturday National Unix Systems Team Local NT Systems Teams Saturday PM testing Sunday User acceptance testing

National Services • • Banner: Student Administration System Pay System Finance Sunaccounts System DNS

National Services • • Banner: Student Administration System Pay System Finance Sunaccounts System DNS Secondary Server Helpdesk Database Server MIS Development/Training Servers Cache Servers

Local Systems • • Domain Controllers File/Print Servers WINS Servers Lotus Notes Mail System

Local Systems • • Domain Controllers File/Print Servers WINS Servers Lotus Notes Mail System DHCP/NAT Servers Banner Porthole Server Student Domain Servers

Project Update • National and Local Services @ Banyo • DHCP/NAT Server @ Mitchelton

Project Update • National and Local Services @ Banyo • DHCP/NAT Server @ Mitchelton • Brisbane Staff still @ Mitchelton • Mitchelton connected to Banyo • 5 remote campuses connected with full functionality • Site still under construction

VOIP Migration • Requirement to have VOIP running at both campuses • Migrated the

VOIP Migration • Requirement to have VOIP running at both campuses • Migrated the secondary VOIP Class C range to Banyo • No quality of service as no TOS 5 traffic on this subnet. • Call Managers still located at Mitchelton • ONRAMP installation @ Banyo • Overnight Relocation of Call managers and VOIP primary Class C range to Banyo • Unity Messaging Server Relocated

Student Administration • Exceptionally busy period (Dec 02) • Exams • Year 12 Results

Student Administration • Exceptionally busy period (Dec 02) • Exams • Year 12 Results • Liaison with UAC and QTAC • Relocate QTAC and UAC Servers to Banyo

Helpdesk Functionality • Helpdesk normally based out of Brisbane • HEAT helpdesk application •

Helpdesk Functionality • Helpdesk normally based out of Brisbane • HEAT helpdesk application • Functionality relocated to North Sydney for the duration of the general staff move. • Helpdesk Operator relocated to coordinate client support from North Sydney • Auto escalation and Ticket Generator built @ North Sydney

General Staff Move • As part of the larger Banyo project, Staff were relocated

General Staff Move • As part of the larger Banyo project, Staff were relocated building by building. • Key Stakeholders setup • ITCS then followed removalists and setup staff as the rolled out. • Consisting PC and VOIP configuration. • QRNO rerouted final Class C range to Banyo

Computer Labs & Information Commons • Relocation of Lab computers • Configuration of Lab

Computer Labs & Information Commons • Relocation of Lab computers • Configuration of Lab environments including Audio Visual. • Refurbishment of E-Podiums • Implementation of Library Information Commons. • Installation of Teaching Spaces including Audio Visual.

Putting out Fires • Helpdesk relocated back to Brisbane • ITCS staff from all

Putting out Fires • Helpdesk relocated back to Brisbane • ITCS staff from all sections join as one • Increased presence to smooth transition for staff.

Decommissioning Mitchelton • Removal of old infrastructure • Decommissioning of Microwave link • Relocation

Decommissioning Mitchelton • Removal of old infrastructure • Decommissioning of Microwave link • Relocation of remaining DHCP/NAT Server

A Thanks to the Guys on the ground • Infrastructure • • • Wil

A Thanks to the Guys on the ground • Infrastructure • • • Wil Daniels Dave Elkin Mark Laffan Seng Tan Khai Nguyen • Client Services • • • Gordon Howell Bruce Sugars Joan Ceccato Leslie Forrest Sean Connell Kevin Palmer Michael Kuilboer Lex Price Paul Wagner Dee Shi • MIS • • • Web. IT • • Gerald Coriera Brent Knigge Donna Burbage Peter Blakey • Special Thanks to • • Mahmoud Abo El Wafa, QRNO Nigel Armfield, QRNO Bob Logan, XSI Mark Choquenot, ATI

QUESTIONS ? ? ? Thank You

QUESTIONS ? ? ? Thank You