Optimising the Heathcote Antoinette Tan DHI Jacobs and
Optimising the Heathcote Antoinette Tan DHI, Jacobs and CCC
• • • Background into the Job Heathcote Catchment and Model Active Management Optimisation Future Work © DHI A/S
© DHI
© DHI A/S
© DHI
LDRP © DHI
© DHI
Current Project • • • © DHI Update models to current design Screening Model Base scenario Come up with Operational plan for structures Test various “what if” scenarios Finalise Operation
Heathcote Basins © DHI
Basin Design First Flush Culverts Infiltration Maintain Water Levels Weirs Control Structures Control Flow © DHI SCADA
Awatea © DHI
Wigram © DHI
Curletts © DHI
Hoonhay/Eastman © DHI
Cashmere Worsleys © DHI
Current Project • • • © DHI Update models to current design Screening Model Base scenario Come up with Operational plan for structures Test various “what if” scenarios Finalise Operation
Screening Model © DHI
Link Channels © DHI
MIKE FLOOD model © DHI
Water Level © DHI
Discharge © DHI
Current Project • • • © DHI Update models to current design Screening Model Base scenario Come up with Operational plan for structures Test various “what if” scenarios Finalise Operation
Base scenario setup © DHI
Base Scenario Setup © DHI
© DHI
Current Project • • • © DHI Update models to current design Screening Model Base scenario Come up with Operational plan for structures Test various “what if” scenarios Finalise Operation
Controls for each basin • • © DHI Optimisation Travel times Realistic in terms of infrastructure available Different gate operation
Auto. Cal © DHI Culvert Height Closest to target Water Level Variable Objective Optimised Culvert Height
Auto Calibration © DHI
Objective © DHI
© DHI
Current Project • • • © DHI Update models to current design Screening Model Base scenario Come up with Operational plan for structures Test various “what if” scenarios Finalise Operation
What if Scenarios • • • © DHI Staging of basin implementation Variable rainfall SCADA down or incorrect Past events Tidal Scenarios Rain is forecast
Future work • • © DHI Real time optimisation Telemetry data Online system Give suggestions for gate settings
Conclusions • Working with complex models • Simplifying these models • Many Scenarios and Optimisation • Decision making tool for CCC • Reducing flood risk for residents © DHI
Thank you Antoinette Tan © DHI A/S