MCR’ s top 10 wish list (from Greg Marr presentation at the Retreat 2008)

MCR’ s top 10 wish list (from Greg Marr presentation at the Retreat 2008) • • • Straightforward polarimetry identify responsible person for polarimeter operations identify list of operations and expert activities and measurements RHIC Injection without idiosyncrasies improvements BPMs A Ramp Manager/model that won’t foil tape, Lisa, Orbit. Display, Ramp. Editor… 2 task forces on Ramp software during the shutdown PASS that works faster PASS with less failure ACS group manpower increased over the shutdown, AGS/Booster upgrade planned Our fingers on the keyboard A fully revertible machine Lab-view applications that run and dump themselves One answer from one source A list of exceptions smaller than the list of rules

Retreat 08 – feedback from experiments v Communication propose automatic notification from MCR of

Retreat 08 – feedback from experiments v Communication propose automatic notification from MCR of polarization measurement (phone calls not reliable). v Results of Vernier scans Analyzed and delivered timely to machine and experiments v No change of operations planning, configuration, especially before weekends make optimal use of Monday scheduling meeting v Effective use of 9 o’clock meeting (and meetings in general) Communicate with experiments upfront, before system reports (Run coordinator) Make sure people from experiments are up-to-date on issues Control of backgrounds needs to improve Auto-orbit corrections every ½ hr affect backgrounds needs to be accompanied by auto collimator adjustments that follow orbit movement at collimators

APEX Run-8: studies with d-Au 08 -36 08 -17 0 A 0 A 06

APEX Run-8: studies with d-Au 08 -36 08 -17 0 A 0 A 06 -31 07 -33 08 -14 08 -27 08 -29 08 -34 08 -17 08 -06 08 -01 08 -18 08 -07 08 -02 08 -24 0 A 0 A 1 A 1 A 1 B 1 B 1 B IBS with decoupling transverse stochastic cooling Test of ramp and operations with beta*< 0. 8 m + beta* measurements – 2 techniques + test of IP knobs 30+% luminosity ORM Measurements beta beat correction (only partial) Tune and chromatic drift correction at injection in operations Collimation on the ramp ~operational AC dipole optics measurements, corrections Polarimeter profiles emittance at injection, store Beta beat measurement corrections at injection, store Injection drift correction operational now Nonlinear chromaticity measurements Electron cloud location performance limits Stability threshold at transition performance limits Energy Loss of Debunched Beam fundamental measurement Au 31+ in AGS operations RHIC low energy, GSI Gold-77 in RHIC cooling (to be confirmed)

APEX Run-8: studies with P-P 08 -17 08 -42 08 -13 08 -45 08

APEX Run-8: studies with P-P 08 -17 08 -42 08 -13 08 -45 08 -06 08 -04 07 -03 08 -16 08 -41 0 A 0 A 0 A Beta*=0. 6 m operations this run (luminosity) Near integer WP not operational (without orbit control) Collimation efficiency collimation system upgrade Polarimeter studies improvements needed for high bunch intensity Chromaticity measurement, feedback Hybrid Tune Tracker Impedance localization data possible impedance reduction Coherent spin precession design of RHIC spin flippers RF phasing non operational for PP due to beam loading Longitudinal Vernier scan operations optimization

APEX Run-8: what did not get done… only bigger “ticket items” d-Au: v Convincing

APEX Run-8: what did not get done… only bigger “ticket items” d-Au: v Convincing linear optics corrections (many attempts and progress but nothing operational yet…. ) v (further) development of IBS lattice P-P: v Spin experiments, in general v Long-range beam study (wires) v Demonstration of chromaticity feedback v Optics for PP-2 -PP

APEX Workshop December 4 -5 2008

APEX Workshop December 4 -5 2008

APEX Workshop

APEX Workshop

Plans for Run-9 Program limited to P-P experiments 250 Ge. V 5 weeks of

Plans for Run-9 Program limited to P-P experiments 250 Ge. V 5 weeks of physics 100 Ge. V ~9 weeks of physics Deadline proposals: January 15 January 30 Asked to update status of Run-7 and 8 proposals Meeting AEAC: 1 st week in February Weekly APEX Friday Meetings resume January 23 Collection of APEX Results