Open ADE Open ADE ESPI Roadmap Open ADE
- Slides: 6
Open. ADE: Open. ADE, ESPI, Roadmap, Open. ADE 2. 0 Scope and Requirements July 19, 2010 David Mollerstuen, Open. ADE TF Co-Chair Steve Van Ausdall, Open. ADE TF Co-Chair
Agenda for Face-to-Face Meetings • Open. ADE Introduction, Review (optional) • NAESB Energy Services Provider Interface (ESPI) Overview (optional) • Open. ADE Roadmap (four months / twelve months) • Open. ADE 2. 0: Scope, Business and User Requirements • UCAIug / Open. SG Open. ADE as Interoperability Testing and Certification Authority (ITCA) for Open. ADE / NAESB ESPI • Sample implementation of ESPI
Goals for this (Tuesday PM 2) Meeting • Open. ADE Introduction, Review (optional) • NAESB Energy Services Provider Interface (ESPI) Overview (optional) • Open. ADE Roadmap (four months / twelve months) • Open. ADE 2. 0: Scope, Business and User Requirements
Open. ADE 2011 Roadmap (Proposed) • Q 3 2011 – Complete ITCA startup and ESPI certification capability – Draft Open. ADE 2. 0 Requirements • Q 4 2011 – Certification of first candidate implementation – Complete Open. ADE 2. 0 Requirements • Q 1 2012 – NAESB: ESPI 2. 0?
Candidate Open. ADE 2. 0 Scope • • • Pricing / Schedule (TOU tier, block thresholds) Messaging (for “human” consumption) Load Control Meter Event Data HAN Device Interaction Delivery of ADE content directly to consumers
Candidate Open. ADE 2. 0 Scope (cont. ) • • Outage events (planned, unplanned) Goals (targets), projections Power quality, other events (incl. Errors) Other grid conditions, needs, control – Role reversal, fair is fair (roles can change) • Capabilities and state of distributed resources (This page was from scoping effort in 03/2011)