CI Integrated Build/Verify/Test Starts With the OOI SE Process and Team • • The new OOI CI consists of: – A Service Oriented Architecture (SOA) framework called u. Frame (Universal Framework) developed by Raytheon Omaha – A set of dataset/instrument/platform drivers and data product algorithms which plug in to the u. Frame framework developed by IO staff – User interface developed by Applied Science Associates (ASA) – The CI architecture & HDWR , integration, test and validation by Rutgers University/OL Re-constituted System Engineering Process started with generating the Systems Engineering Management Plan (SEMP) Final
The SEMP Final, CONOPS, Use Cases, and CI Requirements Define the Design and the Bridge to Validation • • • The SEMP Final defines the scope of the remaining OOI MREFC tasks through complete Commissioning of the OOI - Completed finalizing the OOI Concept of Operations (CONOPS) - Completed Updating the Use Cases - Completed Updating the OOI Vocabulary - Completed Updating the Cyberinfrastructure (CI)Requirements - Completed Update the Configuration Management Plan - Submitted Designing, developing, integrating, and testing the OOI Cyberinfrastructure – Design Progressing - Group 4 delivered and in Integration – Initial capability in place for verification – Plan in review for completion Performing the remaining acquisition of equipment – CI equipment delivered Deploying and/or turning the remaining marine arrays and platforms - Ongoing Conditional Acceptance of the Marine Infrastructure and Cyberinfrastructure gives early assessment and time to update performance. Commissioning of the Marine Infrastructure and Cyberinfrastructure occurs when CI is released 2
Integrated Build Plan May September August July June Commissioning Conditional Acceptance Events Globals Papa/Surface Moorings/ Endurance//Cabled Alpha/Beta Alpha Test Beta Test NSF Review Initial Capability CSPP Load Test (Build 4. 1) Clustered Cassandra servers Hardware/ Network Build 3 CI Build Integration Test Procedures u. Frame/UI CI Tasking Cabled Array Data & Test Uncabled Data Plug-ins Sensors & Algorithms Clustered Cassandra server Build 6 (Not in Plan) Final/datacenter Integration Build 4 V&V 3 u. Frame 4. 1 V&V Test Procedures 3 Build 5 V&V 4 UI u. Frame 4. 5 Bench Live 6 u. Frame/UI 5 UI C 2 Array 6 Full Array Calibration/Ingest/metadata Redmine V&V 5 u. Frame 5 5 6 Full Array
CI Architecture/Build/Implementation Don/Ivan 4