November 2013 doc IEEE 802 11 131404 r
November 2013 doc. : IEEE 802. 11 -13/1404 r 0 Some Thoughts on the PAR Authors: Submission Date: 2013 -11 -11 Slide 1 Eldad Perahia (Intel)
November 2013 doc. : IEEE 802. 11 -13/1404 r 0 Items for PAR Scope, Purpose, Need • Metrics • Targeted deployment scenarios • Operating Bands Submission Slide 2 Eldad Perahia (Intel)
November 2013 doc. : IEEE 802. 11 -13/1404 r 0 Metrics • Possible efficiency metrics – area throughput – average throughput per STA • X times improvement in efficiency metric relative to 11 n/ac • improve user quality of experience – minimum average data rate – maximum connection setup delay – maximum packet transmission delay Submission Slide 3 Eldad Perahia (Intel)
November 2013 doc. : IEEE 802. 11 -13/1404 r 0 Targeted deployment scenarios • Support improvements to wireless corporate office, outdoor hotspot, dense residential apartments, or stadiums • Abstraction to more general description: – improvement in high density deployments • both single and multiple management entities – improvement in operator deployments – improvement in outdoor operation Submission Slide 4 Eldad Perahia (Intel)
November 2013 doc. : IEEE 802. 11 -13/1404 r 0 Operating Bands • below 6 GHz operation • Avoid conflict with TGaf, TGah by restricting to >1 GHz • In 2. 4 GHz and 5 GHz – ensure backward compatibility and coexistence with legacy IEEE 802. 11 devices in the 2. 4 GHz and 5 GHz unlicensed bands. Submission Slide 5 Eldad Perahia (Intel)
November 2013 doc. : IEEE 802. 11 -13/1404 r 0 PAR Word Doc • 13/1405 Submission Slide 6 Eldad Perahia (Intel)
- Slides: 6