November 2010 doc 15 10 0923 00 leci
November 2010 doc. : 15 -10 -0923 -00 -leci Project: IEEE P 802. 15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: LECIM-SG Closing Report for Dallas, Texas November 2010 Date Submitted: November 2010 Source: David Howard, On Ramp Wireless Contact: David Howard, On Ramp Wireless Voice: +1 (858)592 -6008 x 221 , E-Mail: david. a. howard@ieee. org Re: LECIM Closing Report for November 2010 Session Abstract: LECIM Closing Report for Dallas, Texas Purpose: Information to 802. 15 WG Notice: This document has been prepared to assist the IEEE P 802. 15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P 802. 15. LECIM SG Slide 1 David Howard, On Ramp Wireless
November 2010 doc. : 15 -10 -0923 -00 -leci Low Energy Critical Infrastructure Monitoring Tuesday EV 1: • Draft PAR and 5 C comment discussion • Responses to individual comments prepared • Initial revisions to PAR and 5 C discussed and captured into document 15 -10 -0894 -00 -leci LECIM SG Slide 2 David Howard, On Ramp Wireless
November 2010 doc. : 15 -10 -0923 -00 -leci Low Energy Critical Infrastructure Monitoring Wednesday AM 1: • Draft PAR and 5 C comment discussion, review and editing. • PAR and 5 C revised based on comments, and resolutions contained in 15 -10 -0894 -03 -leci • Motion to submit revised PAR and 5 C to WG passed LECIM SG Slide 3 David Howard, On Ramp Wireless
November 2010 doc. : 15 -10 -0923 -00 -leci LECIM SG SG Motion to submit to the IEEE 802. 15 working group the revised PAR 756 R 8 and 5 C 757 R 4 documents. Moved by: Evan Green (self) Second by: Shu Kato (NICT) • 32 for • 0 against • 0 abstain Motion Carries LECIM SG Slide 4 David Howard, On Ramp Wireless
November 2010 doc. : 15 -10 -0923 -00 -leci LECIM SG WG Motion Request that the PAR and Five Criteria contained in documents 15 -10 -0756 -08 and 15 -10 -0757 -04 be approved by the IEEE 802. 15 WG and that the EC be requested to forward the PAR to NESCOM. Moved by: Second by: David Howard (On-Ramp Wireless, Inc. ) Shu Kato (NICT) • 70 For • 0 Against • 0 Abstain Motion Carries LECIM SG Slide 5 David Howard, On Ramp Wireless
November 2010 doc. : 15 -10 -0923 -00 -leci LECIM SG The two sessions were attended by more than 32 individuals, representing more than 24 organizations. Comments and resolutions: Meeting minutes (draft): SG LECIM Draft PAR: SG LECIM Draft 5 C: LECIM SG doc: IEEE 802. 15 -10 -0894 -03 -leci doc: IEEE 802. 15 -10 -0904 -00 -leci doc: IEEE 802. 15 -10 -0756 -08 -leci doc: IEEE 802. 15 -10 -0757 -04 -leci Slide 6 David Howard, On Ramp Wireless
- Slides: 6