November 2005 doc IEEE 802 15 050695 r
November 2005 doc. : IEEE 802. 15 -05/0695 r 0 Project: IEEE P 802. 15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG 3 c Closing Report] Date Submitted: [17 November 2005] Source: [Reed Fisher] Company [Oki Electric Industry Co. , Ltd. ] Address [2514 E. Maddox Rd. , Buford, GA 30519 USA. ] Voice: [1 -770 -271 -0529] E-Mail: [reedfisher@bellsouth. net] Re : [] Abstract: [Description of TG 3 c November meeting proceedings ] Purpose: [Report to 802. 15 Closing Plenary Meeting, 18 November 2005] Notice : This document has been prepared to assist the IEEE P 802. 15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P 802. 15. Submission 1 Reed Fisher, Oki Electric Industry Co. , Ltd.
November 2005 doc. : IEEE 802. 15 -05/0695 r 0 TG 3 c Vancouver Meeting Report 18 November, 2005 Submission 2 Reed Fisher, Oki Electric Industry Co. , Ltd.
November 2005 doc. : IEEE 802. 15 -05/0695 r 0 1. 16: 00 Monday 14 November. Call to order. 2. TG 3 c Leadership: Chair: R. Fisher. vice Chairs: H. Ogawa, A. Mathew Secretaries : H. Ikeda, S. K Yong 3. 3. Attendance: total 59 attendees 4. Eight 2 -hour time slots were allocated Submission 3 Reed Fisher, Oki Electric Industry Co. , Ltd.
November 2005 doc. : IEEE 802. 15 -05/0695 r 0 5. TG 3 c Achievements: -Update of Call For Intent (CFI) l. CFI due date was extended from 11 Nov. to 11 December l. Received 21 responses to CFI by 15 November -Update of channel modeling activity -Update of TG 3 c Selection Criteria document l Required PHY-SAP payload data rate increase to =>2 Gbps by motion and carried -Update information on WCA petition to FCC -Draft Down Selection document prepared -Project Timeline updated 6. 17: 00 Wednesday 16 November. Meeting adjourned Submission 4 Reed Fisher, Oki Electric Industry Co. , Ltd.
November 2005 doc. : IEEE 802. 15 -05/0695 r 0 7. Documents & Contributions: 05/620 r 2, Agenda, R. Fisher 05/439 r 4, CFI update, R. Fisher 05/660 r 0, Channel model status report, A. Mathew 05/644 r 0, 60 GHz Channel Model Parameters for IBM Measurement Set, S Emami 05/654 r 0, Recommendations for the 3 c Channel Model Subgroup, S. K. Yong 05/661 r 0, Limitations of the Channel and Potential Problems to the System Design, S. K. Yong 05/672 r 0, Update of WCA Petition, G. Baldwin 05/596 r 0, Regulatory Requirements, A. Mathew 05/671 r 0, Status of 60 GHz Unlicensed Band Korean Regulation, W. Lee 05/430 r 3, Technical Requirement Subgroup Report, A. Seyedi 05/666 r 1, Wireless Display Throughput Requirements, A. Sadri 05/675 r 0, Data Rate Requirements, A. Seyedi 05/616 r 3, Co-existence Model Calculation Bases, H. Ikeda 05/634 r 1, Draft PHY Proposal for 60 GHz WPAN, E. Grass 05/689 r 0, Preliminary 60 GHz Channel Measurement & Modeling, T. Pollock 05/686 r 0, Channel Model Project Plan, A. Mathew 05/692 r 0, Draft TG 3 c Down Selection Document , A. Seyedi Submission 5 Reed Fisher, Oki Electric Industry Co. , Ltd.
- Slides: 5