Nov 2009 doc IEEE 802 11 091162 r

  • Slides: 85
Download presentation
Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 802. 11 Nov 2009

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 802. 11 Nov 2009 Closing Plenary Reports Authors: Submission Date: 2009 -11 -20 1 Adrian Stephens, Intel Corporation

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract • This document

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract • This document is a digest of the closing reports of all 802. 11 sub-groups for presentation at the Nov 2009 closing plenary meeting. Submission 2 Adrian Stephens, Intel Corporation

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Agenda for 2009 -11

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Agenda for 2009 -11 -17 • • • Roll Call / Contacts / Reflector Go round table and get brief status report Review action items from previous meeting Numbering Alignment process Amendment Ordering / ANA Status / Draft Snapshots Lessons learned from TGw/TGn Rev. Com Lessons learned from initial editing of TGn Style Guide for 802. 11 09/1034 r 0 Conference Calls Submission 3 Adrian Stephens, Intel Corporation from slide 1 of 11 -09/1110 r 2 (part) by Peter Ecclesine (Cisco Systems)

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Draft Development Snapshot Changes

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Draft Development Snapshot Changes from last report shown in red. T G Published or Draft Baseline Documents 802. 11 k r y w n z p v u s z 2007 2008 10. 0 11. 0 6. 0 p 2007 2008 10. 0 11. 0 5. 0 9. 0 v 2007 2008 2009 6. 0 9. 0 7. 03 u 2007 2008 2009 6. 0 9. 0 7. 0 8. 0 s 2007 2008 9. 0 10. 0 4. 0 6. 01 5. 01 6. 01 3. 04 m b 2007 Inc 2008 Inc Inc - - - - aa 2007 2008 9. 0 10. 0 4. 0 6. 0 7. 0 3. 0 Submission 2008 mb 1. 03 aa - 0. 02 Most current doc shaded green. Source MEC Style Guide Word Yes 2007 Menzo Wentink 17 -July Frame 7. 2 Yes 2009 Wayne Fisher 2 -Nov Frame 7. 2 No 2007 Emily Qi 18 -Nov Frame 7. 2 Yes 2007 Necati Canpolat 18 -Nov Frame 8. 0 No 2007 Kazuyuki Sakoda , protem 18 -Nov Frame 7. 2 No 2009 Adrian Stephens 12 -May Hang Lui 18 -Nov No Editor Slide 4 4 Adrian Stephens, Intel Corporation from slide 2 of 11 -09/1110 r 2 (part) by Peter Ecclesine (Cisco Systems) Snapshot Date

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 802. 11 Style Guide

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 802. 11 Style Guide • See 11 -09 -1034 -00 -0000 -wg 11 -style-guide. doc Submission 5 Adrian Stephens, Intel Corporation from slide 3 of 11 -09/1110 r 2 (part) by Peter Ecclesine (Cisco Systems)

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Closing Report Date: 2009

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Closing Report Date: 2009 -11 -20 Authors: Submission 6 Adrian Stephens, Intel Corporation from slide 1 of 11 -09/1288 r 0 by Clint Chaplin, Chair (Samsung)

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract Closing report for

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract Closing report for WNG SC for November 2009, Atlanta, Georgia, USA Submission 7 Adrian Stephens, Intel Corporation from slide 2 of 11 -09/1288 r 0 by Clint Chaplin, Chair (Samsung)

November 2009 doc. : IEEE 802. 11 -09/1162 r 0 • Three presentations at

November 2009 doc. : IEEE 802. 11 -09/1162 r 0 • Three presentations at this meeting – Continuous network discovery using Opportunistic Scanning (11 -091207 -01) – Marc Emmelmann • Straw Poll: Should IEEE 802. 11 WNG receive further presentations analyzing if existing mechanisms can be used to support seamless handoff for (highly) mobile users? • Result: Yes - 21; No - 0; Abstain - 4. – Time-based ranging technology for IEEE 802. 11 (11 -09 -1212 -00) – Dong Kyoo Kim – IEEE 802. 11 for High Speed Mobility (11 -09 -1000 -02) – Hiroki Nakano • Does WNG think that we need further presentations exploring the need for support for mobile communication. • Result: Yes - 25; No - 0; Need More Discussion - 3; Don’t Care - 1. • Minutes – 11 -09 -1208 r 0 • Plans for January 2010 – 2 hour session Submission 8 Adrian Stephens, Intel Corporation from slide 3 of 11 -09/1288 r 0 by Clint Chaplin, Chair (Samsung)

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 November 2009 TGmb Closing

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 November 2009 TGmb Closing Report Date: 2009 -11 -19 Authors: Submission 9 Adrian Stephens, Intel Corporation from slide 1 of 11 -09/1291 r 0 by Matthew Gast, Trapeze Networks

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract Closing report for

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract Closing report for TGmb for November 2009 plenary meeting in Atlanta, Georgia, USA. Submission 10 Adrian Stephens, Intel Corporation from slide 2 of 11 -09/1291 r 0 by Matthew Gast, Trapeze Networks

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 TGmb Status Time to

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 TGmb Status Time to (re)circulate… Photo credit: Matthew Gast; used with permission (duh) Submission 11 Adrian Stephens, Intel Corporation from slide 3 of 11 -09/1291 r 0 by Matthew Gast, Trapeze Networks

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Accomplishments • No interpretation

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Accomplishments • No interpretation requests received • Comment processing from LB 149 is complete – Asking for recirculation ballot – 15 days is standard recirculation time, we have requested approximately four weeks due to holiday season and incorporation of 802. 11 w-2009 • Roll-up of 802. 11 n-2009 will commence in parallel to letter ballot – Recirculation anticipated in March 2010 that includes 802. 11 n 2009 Submission 12 Adrian Stephens, Intel Corporation from slide 4 of 11 -09/1291 r 0 by Matthew Gast, Trapeze Networks

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Onward to January •

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Onward to January • No change to end date in plan of record – Staying in working group ballot longer • Requesting weekly teleconferences every Friday for 90 minutes at 11 am ET beginning January 29 • Goal: Recirculation letter ballot after March meeting Submission 13 Adrian Stephens, Intel Corporation from slide 5 of 11 -09/1291 r 0 by Matthew Gast, Trapeze Networks

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Revised TGmb Plan of

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Revised TGmb Plan of Record (changes from start of week underlined) ü May 2008 – Issue Call for Comment/Input ü July 2008 – begin process input and old Interpretation requests Acknowledge previous Task Group referrals ü ü ü Sept 2008 – PAR revision process started Nov 2008 – close receipt of new input Nov 2008 – WG/EC approval of PAR Revision Dec 2008 – Nes. Com/SASB approval PAR Revision May 2009 – First WG Letter ballot – (includes All published Amendments as of May 2009) ü Nov 2009 – Recirc start • May 2010 – Form Sponsor Pool (45 days) • July 2010 – Sponsor Ballot Start – (Include all published amendments as of July 2010) • November 2010 – Sponsor Recirc • March 2011 – WG/EC Final Approval • June 2011 – Rev. Com/SASB Approval Submission 14 Adrian Stephens, Intel Corporation from slide 6 of 11 -09/1291 r 0 by Matthew Gast, Trapeze Networks

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 References • Agenda: 11

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 References • Agenda: 11 -09/1134 r 10 • Minutes: 11 -09/1190 r 0 Submission 15 Adrian Stephens, Intel Corporation from slide 7 of 11 -09/1291 r 0 by Matthew Gast, Trapeze Networks

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 TGp Closing Report Date:

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 TGp Closing Report Date: 2009 -09 -24 Author: Submission 16 Adrian Stephens, Intel Corporation from slide 1 of 11 -09/1289 r 0 by Lee Armstrong (Armstrong Consulting, Inc. )

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract TGp closing report

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract TGp closing report for November meetings Submission 17 Adrian Stephens, Intel Corporation from slide 2 of 11 -09/1289 r 0 by Lee Armstrong (Armstrong Consulting, Inc. )

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 November Meetings Summary •

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 November Meetings Summary • LB 158 completed since September meeting, passed, no new comments • Sponsor Ballot #0 started, will close on 22 November • Current comment resolution document, 11 -09 -1200 -02 -000 p, represents the 49 comments received as of Wednesday afternoon • 4 time slots during the week • Majority of meeting time in discussions of key comments, not in voting on resolutions Submission 18 Adrian Stephens, Intel Corporation from slide 3 of 11 -09/1289 r 0 by Lee Armstrong (Armstrong Consulting, Inc. )

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Status • D 9.

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Status • D 9. 0 is the current draft • Waiting on ballot closing this weekend • TGp designated as P 802. 11 p Comment Resolution Committee (CRC) • Weekly teleconferences planned for every Thursday @ 1500 Piscataway time will be CRC meetings • Plan is to complete comment resolution prior to January meetings Submission 19 Adrian Stephens, Intel Corporation from slide 4 of 11 -09/1289 r 0 by Lee Armstrong (Armstrong Consulting, Inc. )

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 TGs Atlanta Closing Report

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 TGs Atlanta Closing Report Date: 2009 -11 -20 Author: Name Address Affiliation Phone Email Dee Denteneer HTC 37; 5656 AE Eindhoven; The Netherlands Philips +31 40 2749743 Dee. Denteneer@phil ips. com Submission 20 Adrian Stephens, Intel Corporation from slide 1 of 11 -09/1243 r 1 by Dee Denteneer

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract TGs closing report

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract TGs closing report for the November 2009 meeting. Resolved outstanding comments and ready to go to recirculation. Submission 21 Adrian Stephens, Intel Corporation from slide 2 of 11 -09/1243 r 1 by Dee Denteneer

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Status • TGs passed

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Status • TGs passed LB 147 with 79% approval rate (May 2009) • Before the meeting: • Comment resolution spreadsheet 11 -09/471 r 18 with 118 comments open • Most recent TGs Draft is D 3. 04 • After meeting • Most recent TGs comment resolution spread sheet is 11 -09/471 r 23, with resolutions to all comments • An annotated agenda for TGs at this meeting in 1109/1099 r 9 • The TGs draft minutes will be uploaded as 11 -09/1223 r 0 Submission 22 Adrian Stephens, Intel Corporation from slide 3 of 11 -09/1243 r 1 by Dee Denteneer

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Next Steps • Produce

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Next Steps • Produce Draft 4. 0 and go to recirculation • TGs is holding teleconferences on Wednesdays through the January Plenary at 4 pm (ET)for up to 1½ hours on the Following Dates • December 2, January 6, January 13 • Goal for the November 2009 TGs meeting in Los Angeles, USA: – Start resolving comments received in recirculation Submission 23 Adrian Stephens, Intel Corporation from slide 4 of 11 -09/1243 r 1 by Dee Denteneer

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 • Motion: – Having

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 • Motion: – Having approved comment resolutions for all of the comments received from LB#147 on P 802. 11 s Draft 3. 0 as contained in document 11 -09/471 r 23, – Instruct the editor to prepare Draft 4. 0 incorporating these resolutions and, – Approve a Working Group Recirculation Ballot of at least 15 days asking the question “Should P 802. 11 s Draft 4. 0 be forwarded to Sponsor Ballot? ” • Moved by Theodorus Denteneer on behalf of TGs • TGs vote: – Moved: Guido Hiertz Seconded: Dan Harkins Result: y: 9 -n: 0 -a: 0 Submission 24 Adrian Stephens, Intel Corporation from slide 5 of 11 -09/1243 r 1 by Dee Denteneer

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Moved to schedule TGs

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Moved to schedule TGs teleconferences on December 2 , January 6, and January 13 at 4 pm for a maximum of 90 minutes to resolve comments and discuss agendas. Approved by unanimous consent Submission 25 Adrian Stephens, Intel Corporation from slide 6 of 11 -09/1243 r 1 by Dee Denteneer

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Closing Report Date: 2009

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Closing Report Date: 2009 -11 -20 Authors: Submission 26 Adrian Stephens, Intel Corporation from slide 1 of 11 -09/1279 r 2 by Stephen Mc. Cann, RIM

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract Closing report for

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract Closing report for TGu Interworking with External Networks for November 2009, Atlanta, Georgia, USA Submission 27 Adrian Stephens, Intel Corporation from slide 2 of 11 -09/1279 r 2 by Stephen Mc. Cann, RIM

November 2009 doc. : IEEE 802. 11 -09/1162 r 0 • Initial Sponsor Ballot

November 2009 doc. : IEEE 802. 11 -09/1162 r 0 • Initial Sponsor Ballot (#0) progress – Initial meeting of TGu CRC – Resolved 83 technical comments this week, with 73 remaining – 6 submissions presented and approved to resolve comments • 11 -09 -1120 r 5 – Next sponsor re-circulation ballot in early January 2010 • Teleconferences – Wednesdays at 11 ET (from 2 nd December 2009) • Plans for January 2010 – Review CRC sponsor ballot activities – Continue to resolve sponsor ballot comments Submission 28 Adrian Stephens, Intel Corporation from slide 3 of 11 -09/1279 r 2 by Stephen Mc. Cann, RIM

November 2009 doc. : IEEE 802. 11 -09/1162 r 0 • Expert Review –

November 2009 doc. : IEEE 802. 11 -09/1162 r 0 • Expert Review – List of 10 experts compiled (11 -09 -1271 r 0) – Send out invitation emails to participate – For positive responses, then send copies of IEEE 802. 11 u D 8. 0 for review and comments to further the draft (with time duration) – TGu chair will then place response comments into future re -circulation sponsor ballot. Submission 29 Adrian Stephens, Intel Corporation from slide 4 of 11 -09/1279 r 2 by Stephen Mc. Cann, RIM

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 November 2009 Closing Report

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 November 2009 Closing Report Date: 2009 -11 -19 Authors: Submission 30 Adrian Stephens, Intel Corporation from slide 1 of 11 -09/1290 r 0 by Dorothy Stanley (Aruba Networks)

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract This document contains

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract This document contains the TGv closing report for November 2009. Submission 31 Adrian Stephens, Intel Corporation from slide 2 of 11 -09/1290 r 0 by Dorothy Stanley (Aruba Networks)

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Goals and Accomplishments •

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Goals and Accomplishments • Comment resolution from Initial Sponsor Ballot – 327 comments, 208 resolutions completed, 119 remain • Teleconferences – Dec 1, 8, 15, Jan 12, noon-2 pm Eastern Submission 32 Adrian Stephens, Intel Corporation from slide 3 of 11 -09/1290 r 0 by Dorothy Stanley (Aruba Networks)

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Output Documents • 11

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Output Documents • 11 -09 -1290 -00 -000 v-TGv-November-2009 -closingreport. ppt • 11 -09 -1130 -03 -000 v-November-2009 -agenda. ppt • 11 -09 -1166 -00 -000 v-November-2009 -meeting notes Submission 33 Adrian Stephens, Intel Corporation from slide 4 of 11 -09/1290 r 0 by Dorothy Stanley (Aruba Networks)

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 TGv Timeline – Updated

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 TGv Timeline – Updated Sept, 2009 • Initial Working Group Letter Ballot: July 07 – completed – Jan 08 – D 2. 0, May 08 – D 3. 0, Nov 08 – D 4. 0 • Re-circulation Working Group Letter Ballot: November 08 (D 4. 0) – Mar 09 – D 5. 0, May 09 – D 6. 0, July 09 – D 7. 0, D 7. 0(unchanged) • Form Sponsor Ballot Pool: August 09 (was June 09) • Initial Sponsor Ballot: Oct 09 – D 7. 0 (was Sept 09) • Approved Sponsor Ballot: Nov 09 – Jan 09 – D 8. 0, Feb D 9. 0, March D 10. 0, April D 11. 0 – May 12 th ( or so) for Revcom June Approval • Final WG/EC Approval: July 2010 • Rev. Com/Standards Board Approval: June 4 th/June 5 th(or so) • Note: TGv PAR is authorized through Dec 2010 Submission 34 Adrian Stephens, Intel Corporation from slide 5 of 11 -09/1290 r 0 by Dorothy Stanley (Aruba Networks)

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Goals for Nov 09

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Goals for Nov 09 - Jan 2010 • Complete initial Sponsor Ballot comment resolution • Recirculation Sponsor Ballot Submission 35 Adrian Stephens, Intel Corporation from slide 6 of 11 -09/1290 r 0 by Dorothy Stanley (Aruba Networks)

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 References Submission 36 Adrian

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 References Submission 36 Adrian Stephens, Intel Corporation from slide 7 of 11 -09/1290 r 0 by Dorothy Stanley (Aruba Networks)

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 TGz Atlanta Closing Report

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 TGz Atlanta Closing Report Date: 20 November 2009 Authors: Submission 37 Adrian Stephens, Intel Corporation from slide 1 of 11 -09/1292 r 0 by Menzo Wentink (Qualcomm)

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 TGz Accomplishments in November

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 TGz Accomplishments in November • TGz made significant progress in reaching consensus on comments received on the initial sponsor ballot – The comments are in 11 -09/1185 r 0 – Text submissions are in 11 -09/1218 r 4 (TDLS discovery), 1109/1281 r 0 (TDLS path switch) and 11 -09/1230 r 3 (Off-channel selection) • We expect to start a first recirculation sponsor ballot after the Los Angeles meeting in January Submission 38 Adrian Stephens, Intel Corporation from slide 2 of 11 -09/1292 r 0 by Menzo Wentink (Qualcomm)

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 802. 11 aa –

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 802. 11 aa – Robust Audio Video Transport Streaming Atlanta Closing Report Date: 2009 -11 -18 Authors: Submission 39 Adrian Stephens, Intel Corporation from slide 1 of 11 -09/1269 r 0 by Ganesh Venkatesan, Intel Corporation

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract TGaa Closing Report

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract TGaa Closing Report for the IEEE 802. 11 Atlanta, Georgia Session (November 2009) Submission Slide 40 40 Adrian Stephens, Intel Corporation from slide 2 of 11 -09/1269 r 0 by Ganesh Venkatesan, Intel Corporation

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Goals for the session

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Goals for the session • • Submission Continue listening to technical proposals and adopting corresponding text into the TGaa draft Joint meeting with 802. 11 ac on approaches to OBSS Joint meeting with 802. 1 AVB Resolve comments from Internal review of Draft D 0. 01/D 0. 02 41 Adrian Stephens, Intel Corporation from slide 3 of 11 -09/1269 r 0 by Ganesh Venkatesan, Intel Corporation

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Technical Presentations Document number

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Technical Presentations Document number Title 1150/r 1 Feedback-jamming Multicast ARQ results with capture effect Jochen Miroll 1139/r 3 OBSS Management Text Graham Smith 1138/r 2 Outline of Proposed OBSS Solution Graham Smith 1137/r 1 EDCA Bandwidth Factor Graham Smith 1136/r 1 AP Shut Out Neighborhood Effect Graham Smith 0926/r 5 Interworking with 802. 1 Qat Ganesh Venkatesan 1215/r 0 Non-contentious (internal review) comments assigned to Brian. H Brian Hart 1251/r 0 Intra-AC Prioritization Use Cases Alex Ashley 1157/r 1 Explain OBSS issue as well as possible simulation scenarios for OBSS in TGac Takatori Yasushi Submission Author(s) Slide 42 42 Adrian Stephens, Intel Corporation from slide 4 of 11 -09/1269 r 0 by Ganesh Venkatesan, Intel Corporation

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Accomplishments 1. Listened to

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Accomplishments 1. Listened to 9 technical presentations 2. Adopted resolutions to some internal review comments into TGaa draft (1215 r 0) 3. Listened to the complete OBSS solution and adopted the corresponding (updated) text (1139 r 3) 4. Brainstormed on intra-AC prioritization Use Cases 5. Met jointly with 802. 1 AVB 6. Approved 09/926 r 5 as the guiding document describing the work that needs to be done in 802. 11 aa and 802. 1 Qat Submission 43 Adrian Stephens, Intel Corporation from slide 5 of 11 -09/1269 r 0 by Ganesh Venkatesan, Intel Corporation

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Joint meeting with 802.

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Joint meeting with 802. 1 AVB 1. 2. 3. 4. Presented a solution to support 802. 1 Qat in 802. 11 (09/926 r 5) Presented a draft version of changes to 802. 11 in order to support 802. 1 Qat in 802. 11. Status Update on 802. 11 aa Status Update on 802. 1 AVB 1. 2. 3. 5. 802. 1 AS may have up to 2 recirculations before starting sponsor ballot 802. 1 Qat has planned a recirculation before starting sponsor ballot 802. 1 Qav is ratified Goals for the March 2010 joint meeting 1. Submission Complete changes to 802. 11 in order to support 802. 1 Qat and have the changes included in a 11 aa draft Slide 44 44 Adrian Stephens, Intel Corporation from slide 6 of 11 -09/1269 r 0 by Ganesh Venkatesan, Intel Corporation

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Goals for the January

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Goals for the January Interim Enter January 2010 session with TGaa Draft 0. 03 Adopt text corresponding to all remaining PAR topics into TGaa Draft in the January meeting Work towards completing Draft 1. 0 by March 2010 Submission 45 Adrian Stephens, Intel Corporation from slide 7 of 11 -09/1269 r 0 by Ganesh Venkatesan, Intel Corporation

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Teleconferences Mondays 11: 00

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Teleconferences Mondays 11: 00 -12: 30 Hrs ET on the following days: Nov 30, 2009 Dec 14, 2009 Jan 11, 2010 Submission 46 Adrian Stephens, Intel Corporation from slide 8 of 11 -09/1269 r 0 by Ganesh Venkatesan, Intel Corporation

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 TGac November 2009 Closing

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 TGac November 2009 Closing Report Date: 2009 -11 -19 Authors: Submission 47 Adrian Stephens, Intel Corporation from slide 1 of 11 -09/1277 r 1 by Osama Aboul-Magd (Samsung)

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract This document is

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract This document is the closing report for the TGac for the November 2009 session. Submission 48 Adrian Stephens, Intel Corporation from slide 2 of 11 -09/1277 r 1 by Osama Aboul-Magd (Samsung)

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Work Completed • Selection

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Work Completed • Selection of ad hoc group chairs is completed – – PHY (Vinko Erceg, Minho Cheong, Raja Banerjea) MAC (Matthew Fischer, Allan Zhu, Jae Seung Lee) MU-MIMO (Brian Hart, Robert Stacey, Sameer Vermani) Coexistence (Youhan Kim, Eldad Perahia, Yasushi Takatori) • Ad Hoc groups conducted their first meetings with focus on procedure discussion. Ad Hoc group reports are included in: – – PHY 09/1261 r 0 MAC 09/1260 r 1 MU-MIMO 09/1262 r 0 Coexistence 09/1265 r 2 • The TG accepted a new revision of the Functional Requirements and Evaluation Methodology document (09/0451 r 8). • The TG agreed on an initial guideline for Ad Hoc scope (09/1175 r 1). • Technical Presentations. Submission 49 Adrian Stephens, Intel Corporation from slide 3 of 11 -09/1277 r 1 by Osama Aboul-Magd (Samsung)

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 January 2010 Goals •

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 January 2010 Goals • Plan to continue with Ad Hoc group meetings with focus to further define the scope and work items for each ad hoc. • Submissions Submission 50 Adrian Stephens, Intel Corporation from slide 4 of 11 -09/1277 r 1 by Osama Aboul-Magd (Samsung)

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Conference Call Times •

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Conference Call Times • December 3, 2009 – PHY Ad Hoc 21: 00 -22: 00 ET • December 17, 2009 – MAC Ad Hoc 20: 00 – 21: 00 ET – MIMO-MU Ad Hoc 11: 00 – 12: 00 ET • January 7, 2010 – Coexistence Ad Hoc 20: 00 – 22: 00 ET • January 14, 2010 – PHY Ad Hoc 11: 00 -12: 00 ET Submission 51 Adrian Stephens, Intel Corporation from slide 5 of 11 -09/1277 r 1 by Osama Aboul-Magd (Samsung)

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 TGad November 2009 Closing

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 TGad November 2009 Closing Report Date: 2009 -11 -19 Authors: Submission 52 Adrian Stephens, Intel Corporation from slide 1 of 11 -09/1117 r 0 by Eldad Perahia, Intel Corporation

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract This document is

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract This document is the closing report for the TGad for the November 2009 session. Submission 53 Adrian Stephens, Intel Corporation from slide 2 of 11 -09/1117 r 0 by Eldad Perahia, Intel Corporation

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Work Completed (1/2) •

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Work Completed (1/2) • Evaluation Methodology – – – 09/1160, Proposed Evaluation Methodology Additions, John Barr 09/1216, Internet traffic modeling, Sai Nandagopalan 09/1213, 60 GHz Impairments Modeling, Vinko Erceg 09/1222 r 1, Hard disk drive traffic model, Eldad Perahia 09/1229, Application of 60 GHz Channel Models for Comparison of TGad Proposals, Alexander Maltsev – 09/296 r 12, Update to Evaluation Methodology document, Eldad Perahia – 09/1210, Coexistence Techniques, Tuncer Baykas • Motion to adopt 09/0296 r 12 as the first draft of the TGad evaluation methodology failed 24/20/7 Submission 54 Adrian Stephens, Intel Corporation from slide 3 of 11 -09/1117 r 0 by Eldad Perahia, Intel Corporation

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Work Completed (2/2) •

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Work Completed (2/2) • Channel Modeling, Tues PM 2, Wed PM 2, Th AM 2 – 09/1252, Inter Cluster Parameters of Living Room Channel Model for 60 GHz WLAN Systems, Alexander Maltsev – 09/1152, 60 -GHz Living-Room Channel Measurements, Tian-Wei Huang – 09/1169, Human Body Blockage - Guidelines for TGad MAC development, Thomas Kürner – 09/1170, Modeling the human induced 60 GHz channel dynamics, Thomas Kürner – 09/1165, 60 GHz Cubicle Wall Reflectivity, Chris Hansen – 09/1232, Intra-cluster response model and parameter for channel modeling at 60 GHz (Part 2), Hirokazu Sawada • Other technical submissions – 09/1153, 60 GHz Beamforming, Carlos Cordeiro – 09/1168, SCR Design and Performance Assessment, John Stine • Call for Proposals – Motion to adopt 09/1206 r 0 as the TGad call for proposals passed 50/0/19 – Chair to announce in WG and email reflector Submission 55 Adrian Stephens, Intel Corporation from slide 4 of 11 -09/1117 r 0 by Eldad Perahia, Intel Corporation

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Call for Proposals •

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Call for Proposals • • https: //mentor. ieee. org/802. 11/dcn/09/11 -09 -1206 -00 -00 ad-draft-call-forproposals. doc Two types of proposals – New Techniques – Complete Proposals • • Definition in https: //mentor. ieee. org/802. 11/dcn/09/11 -09 -0935 -03 -00 adselection-procedure. doc Notification of intent to present: December 18, 2009 – Must email both TG chair and WG chair – Date applies to proposers of both New Techniques and Complete Proposals • For New Techniques presented in March 2010 – Date that material must be on mentor: February 28, 2010 • For New Techniques presented in May 2010 – Date that material must be on mentor: May 2, 2010 • For Complete Proposals presented in May 2010 – Date that material must be on mentor: May 2, 2010 Submission 56 Adrian Stephens, Intel Corporation from slide 5 of 11 -09/1117 r 0 by Eldad Perahia, Intel Corporation

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Goals for January 2010

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Goals for January 2010 • Continue working on task group documents • Technical contributions Submission 57 Adrian Stephens, Intel Corporation from slide 6 of 11 -09/1117 r 0 by Eldad Perahia, Intel Corporation

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Conference call times •

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Conference call times • Dec 10 – 10: 00 -12: 00 ET – Evaluation Methodology • Jan 7 – 10: 00 -12: 00 ET – Channel Model Submission 58 Adrian Stephens, Intel Corporation from slide 7 of 11 -09/1117 r 0 by Eldad Perahia, Intel Corporation

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 IEEE 802. 11 TV

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 IEEE 802. 11 TV White Spaces Study Group Closing Report Date: 2009 -11 -20 Authors: Submission 59 Adrian Stephens, Intel Corporation from slide 1 of 11 -09/1286 r 0 by Rich Kennedy, Research In Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract This presentation is

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract This presentation is the closing report for the Atlanta meeting of the IEEE 802. 11 TVWS SG. Submission 60 Adrian Stephens, Intel Corporation from slide 2 of 11 -09/1286 r 0 by Rich Kennedy, Research In Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Agenda • Introduction •

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Agenda • Introduction • Administrative items including • Review and respond to the received comments on the 802. 11 TVWS PAR and 5 C – 11 -09 -0934 -05 -tvws-par-nescom-form-plus-5 c • Plan for the IEEE 802 Wireless Interim in Los Angeles [January 18 th through 22 nd] • Request teleconferences Submission 61 Adrian Stephens, Intel Corporation from slide 3 of 11 -09/1286 r 0 by Rich Kennedy, Research In Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Accomplishments • Reviewed all

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Accomplishments • Reviewed all of the received comments on the 802. 11 TVWS PAR and 5 C – Responses in 11 -09 -1240 -04 -tvws-replies-to-comments-on-802 -11 -tvws-par-5 c • Edited the PAR and 5 C document and uploaded it – 11 -09 -0934 -08 -tvws-par-nescom-form-plus-5 c • Selected one teleconference slot to request – 20: 00 ET on January 12 th • Discussed the plan for now until the January interim Submission 62 Adrian Stephens, Intel Corporation from slide 4 of 11 -09/1286 r 0 by Rich Kennedy, Research In Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Documents • 11 -09

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Documents • 11 -09 -1240 -04 -tvws-replies-to-comments-on-802 -11 -tvws-par-5 c • 11 -09 -0934 -08 -tvws-par-nescom-form-plus-5 c Submission 63 Adrian Stephens, Intel Corporation from slide 5 of 11 -09/1286 r 0 by Rich Kennedy, Research In Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Thanks to all who

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Thanks to all who participated! See you in LA Submission 64 Adrian Stephens, Intel Corporation from slide 6 of 11 -09/1286 r 0 by Rich Kennedy, Research In Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Qo. SMAN SG Closing

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Qo. SMAN SG Closing Report – Nov 2009 Date: 2009 -11 -19 Authors: Submission 65 Adrian Stephens, Intel Corporation from slide 1 of 11 -09/1211 r 1 by Michael Montemurro, Research In Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract This document is

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract This document is the closing report for the Qo. SMAN SG for the November 2009 session. Submission 66 Adrian Stephens, Intel Corporation from slide 2 of 11 -09/1211 r 1 by Michael Montemurro, Research In Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Work Completed • Thanks

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Work Completed • Thanks to Stephen Mc. Cann as acting Secretary for the group. – Minutes: https: //mentor. ieee. org/802. 11/dcn/09/11 -09 -1209 -00 -00 qm-minutesnovember-2009. doc • Discussion on the process moving forward as a Task Group • Processed PAR and 5 C comments: – https: //mentor. ieee. org/802. 11/dcn/09/11 -09 -1241 -03 -00 qm-qosman-par-commentresolutions. xls • Completed and accepted the PAR and 5 C document – https: //mentor. ieee. org/802. 11/dcn/09/11 -09 -0942 -08 -00 qm-qosman-par-nescomform-plus-5 cs. doc • A Teleconference has been planned for January 14 at 11: 00 h ET. • Motions to approve PAR comment resolutions and PAR and 5 C document. Submission 67 Adrian Stephens, Intel Corporation from slide 3 of 11 -09/1211 r 1 by Michael Montemurro, Research In Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Motion to approve QOSMAN

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Motion to approve QOSMAN PAR comment resolutions Move to accept the QOSMAN PAR comment resolutions in document https: //mentor. ieee. org/802. 11/dcn/09/1109 -1241 -02 -00 qm-qosman-par-comment-resolutions. xls. • Moved: Stephen Mc. Cann • Seconded: Paul Lambert • Vote: Yes – 6, No – 0, Abstain – 1. • Motion Passes. Submission 68 Adrian Stephens, Intel Corporation from slide 4 of 11 -09/1211 r 1 by Michael Montemurro, Research In Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 SG Motion Believing that

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 SG Motion Believing that the Qo. SMAN PAR and Five Criteria contained in the documents referenced below meet IEEE-SA guidelines, Request that the Qo. SMAN PAR and the Five Criteria contained in document 11 -09 -0942 -07 -00 qm-qosmanpar-nescom-form-plus-5 cs. doc be forwarded to the 802. 11 WG for approval of the full Working Group. • Moved: Paul Lambert • Seconded: Stephen Mc. Cann • Vote: Yes – 6, No – 0, Abstain – 0. Submission 69 Adrian Stephens, Intel Corporation from slide 5 of 11 -09/1211 r 1 by Michael Montemurro, Research In Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 802. 11 WG Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 802. 11 WG Motion Believing that the Qo. SMAN PAR and Five Criteria contained in the documents referenced below meet IEEE-SA guidelines, Request that the Qo. SMAN PAR and the Five Criteria contained in 11 -09 -0942 -07 -00 qm-qosman-par-nescom-form-plus-5 cs. doc be posted to the IEEE 802 Executive Committee (EC) agenda for WG 802 preview and EC approval to submit to Nes. Com. • Moved by Michael Montemurro on behalf of the IEEE 802. 11 QOSMAN SG vote: Moved: Paul Lambert, Seconded: Stephen Mc. Cann, Result: 6 -0 -0 Submission 70 Adrian Stephens, Intel Corporation from slide 6 of 11 -09/1211 r 1 by Michael Montemurro, Research In Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Task Group Process Strawman

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Task Group Process Strawman • Prepare a Requirements Document – Consider use cases to justify requirements – Use previous submissions as a basis – Prioritize the requirements (mandatory/optional) • Solicit individual proposals • First Draft Submission 71 Adrian Stephens, Intel Corporation from slide 7 of 11 -09/1211 r 1 by Michael Montemurro, Research In Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 January 2009 Goals •

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 January 2009 Goals • • Begin work as a Task Group Elect Task Group Officers: Chair, Editor, and Secretary Establish a timeline. Create a requirements and use cases document for management frame prioritization. Submission 72 Adrian Stephens, Intel Corporation from slide 8 of 11 -09/1211 r 1 by Michael Montemurro, Research In Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Closing Report Date: 2009

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Closing Report Date: 2009 -11 -20 Authors: Submission 73 Adrian Stephens, Intel Corporation from slide 1 of 11 -09/1284 r 0 by Andrew Myles, Cisco

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract Closing report for

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract Closing report for JTC 1 ad hoc for November 2009, Atlanta, Georgia, USA Submission 74 Adrian Stephens, Intel Corporation from slide 2 of 11 -09/1284 r 0 by Andrew Myles, Cisco

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 JTC 1 ad hoc

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 JTC 1 ad hoc discussed the WAPI NP proposal & wrote two liaisons to SC 6 • Progress in Atlanta – Discussed China NB’s proposal for a WAPI NP in ISO/IEC – Wrote letter (11 -09 -1254 r 1) to SC 6 responding to claims that 802. 11 isn insecure in the WAPI NP proposal – Wrote letter to SC 6: • Reporting recent and planned future activities in the IEEE 802. 11 Working Group • Flagging an intention to submit certain documents to ISO/IEC using the PDSO process • Offering JTC 1 and SC 6 National Bodies the opportunity to submit comments into the Sponsor Ballot process • Plans for Jan 2010 – Consider any JTC 1 liaison issues – Start technical evaluation of WAPI Submission 75 Adrian Stephens, Intel Corporation from slide 3 of 11 -09/1284 r 0 by Andrew Myles, Cisco

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 JTC 1 ad hoc

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 JTC 1 ad hoc approved a liaison to SC 6 relating to ISO/IEC JTC 1/SC 6 N 14123 • Motion – The IEEE 802. 11 JTC 1 ad hoc recommends to the IEEE 802. 11 WG and IEEE 802 Ex. Com that the letter contained in 11 -09 -1254 r 1 be liaised to ISO/IEC JTC 1/SC 6. This letter provides a response to some of the material liaised to the IEEE staff in ISO/IEC JTC 1/SC 6 N 14123. The letter should be sent to the SC 6 Secretariat. It should also be CC’ed to the individuals and organisations addressed by the e-mail that notified IEEE staff about ISO/IEC JTC 1/SC 6 N 14123. IEEE staff should be authorised to make any necessary editorial changes • Moved: David Hunter • Seconded: Jerry Thrasher • Result 11/0/0 Submission 76 Adrian Stephens, Intel Corporation from slide 4 of 11 -09/1284 r 0 by Andrew Myles, Cisco

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 802. 11 WG will

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 802. 11 WG will consider a liaison to SC 6 relating to ISO/IEC JTC 1/SC 6 N 14123 • Motion – The IEEE 802. 11 JTC 1 ad hoc and IEEE 802. 11 WG recommends to the IEEE 802 Ex. Com that the letter contained in 11 -09 -1254 r 1 be liaised to ISO/IEC JTC 1/SC 6. This letter provides a response to some of the material liaised to the IEEE staff in ISO/IEC JTC 1/SC 6 N 14123. The letter should be sent to the SC 6 Secretariat. It should also be CC’ed to the individuals and organisations addressed by the e-mail that notified IEEE staff about ISO/IEC JTC 1/SC 6 N 14123. IEEE staff should be authorised to make any necessary editorial changes • Moved: • Seconded: • Result: Submission 77 Adrian Stephens, Intel Corporation from slide 5 of 11 -09/1284 r 0 by Andrew Myles, Cisco

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 JTC 1 ad hoc

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 JTC 1 ad hoc approved a liaison to SC 6 relating to plans to use the PSDO • Motion – The IEEE 802. 11 JTC 1 ad hoc recommends to the IEEE 802. 11 WG and IEEE 802 Ex. Com that the letter contained in 11 -09 -1273 r 1 be liaised to ISO/IEC JTC 1/SC 6. This letter documents recent and planned future activities in the IEEE 802. 11 Working Group, flags an intention to submit certain documents to ISO/IEC using the PDSO process, and offers JTC 1 and SC 6 National Bodies the opportunity to submit comments into the Sponsor Ballot process. The letter should be sent to the SC 6 Secretariat. The IEEE 802. 11 Working Group Chair should be authorised to make any necessary editorial changes. • Moved: Dan Harkins • Seconded: Jim Raab • Result 12/0/0 Submission 78 Adrian Stephens, Intel Corporation from slide 6 of 11 -09/1284 r 0 by Andrew Myles, Cisco

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 802. 11 WG will

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 802. 11 WG will consider a liaison to SC 6 relating to plans to use the PSDO • Motion – The IEEE 802. 11 JTC 1 ad hoc and IEEE 802. 11 WG recommends to IEEE 802 Ex. Com that the letter contained in 11 -09 -1273 r 1 be liaised to ISO/IEC JTC 1/SC 6. This letter documents recent and planned future activities in the IEEE 802. 11 Working Group, flags an intention to submit certain documents to ISO/IEC using the PDSO process, and offers JTC 1 and SC 6 National Bodies the opportunity to submit comments into the Sponsor Ballot process. The letter should be sent to the SC 6 Secretariat. The IEEE 802. 11 Working Group Chair should be authorised to make any necessary editorial changes. • Moved: • Seconded: • Result: Submission 79 Adrian Stephens, Intel Corporation from slide 7 of 11 -09/1284 r 0 by Andrew Myles, Cisco

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 IEEE 802. 11 Regulatory

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 IEEE 802. 11 Regulatory Ad Hoc Committee Closing Report Date: 2009 -11 -20 Authors: Submission 80 Adrian Stephens, Intel Corporation from slide 1 of 11 -09/1287 r 0 by Rich Kennedy, Research In Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract This presentation is

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Abstract This presentation is the closing report for the Atlanta meeting of the IEEE 802. 11 Regulatory Ad Hoc Committee. Submission 81 Adrian Stephens, Intel Corporation from slide 2 of 11 -09/1287 r 0 by Rich Kennedy, Research In Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Agenda • Introduction •

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Agenda • Introduction • The regulatory summaries – North America – European Union – Asia • FOCUS: – Input to ERM TG 11 on EN 300 328 v 1. 8. 1 – FCC changes in the 5 GHz band Submission 82 Adrian Stephens, Intel Corporation from slide 3 of 11 -09/1287 r 0 by Rich Kennedy, Research In Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Accomplishments • Provided updates

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Accomplishments • Provided updates on relevant regulatory actions • Discussed the status of the revision of ERM TG 11 – Called for more participation to prevent unwanted regulations • Discussed the impact of new 5 GHz certification rules – FCC KDB 443999 – “devices will not permit operations on channels which overlap the 5600 - 5650 MHz band” – Operation in 5250 – 5350 MHz and 5470 – 5725 MHz bands is restricted to indoor – With these stipulations, certification can begin again • Discussed the just released (17 November) Ofcom consultation on “Geolocation for Cognitive Access” – Responses due 9 February 2010 – Will plan response on conference calls Submission 83 Adrian Stephens, Intel Corporation from slide 4 of 11 -09/1287 r 0 by Rich Kennedy, Research In Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Documents • 11 -09

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Documents • 11 -09 -1141 -01 -0 reg-atlanta-meeting-plan-and-agenda-nov-2009 • http: //fjallfoss. fcc. gov/oetcf/kdb/forms/FTSSearch. Result. Page. cfm? switch=P&id=41732 • http: //www. ofcom. org. uk/consult/condocs/cogaccess. pdf Submission 84 Adrian Stephens, Intel Corporation from slide 5 of 11 -09/1287 r 0 by Rich Kennedy, Research In Motion

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Thanks to all who

Nov 2009 doc. : IEEE 802. 11 -09/1162 r 0 Thanks to all who participated! See you in Atlanta Submission 85 Adrian Stephens, Intel Corporation from slide 6 of 11 -09/1287 r 0 by Rich Kennedy, Research In Motion