North Campus Photovoltaic Array PROJECT BY LOGAN DYKES
North Campus Photovoltaic Array PROJECT BY: LOGAN DYKES INSTRUCTOR: DR. CRIS KOUTSOUGERAS ADVISOR: DR. RANA MITRA, DR CRIS. KOUTSOUGERAS ADVISOR/CLIENT: MR. BYRON PATTERSON
PROJECT LOCATION NORTH CAMPUS BETWEEN CONTROLLERS & ADMISSIONS
PHOTOVOLTAICS MAIN COMPONENT TO SOLAR POWER SEMICONDUCTORS SUNLIGHT DC -> AC TO ENERGY
COMPONENTS PV CELLS INVERTER BALANCE OF SYSTEM WIRING MOUNTING DISCONNECTS
REGULATIONS NATIONAL ELECTRIC CODE NATIONAL FIRE PROTECTION ASSOCIATION STATE CODES ALWAYS FOLLOW STRICTEST GUIDELINES
WHY GO SOLAR? MOST WIDELY USED RENEWABLE RELATIVELY LOW COST EMERGING ADVANCES CARBON NEUTRAL SOLE PRODUCTION = ENERGY
ARRAY DESIGN CONSIDERATIONS SHADING PREVENTION LOCAL MEASUREMENTS SUN TRAJECTORY MAX # OF UNSHADED PANELS INVERTER PREFERENCE MATCHING CELLS WITH INVERTER WIRING (A) DISCONNECTS (A)
MOUNTING EQUIPMENT WEIGHT OF SYSTEM STRONG WINDS AWNING LOAD CAPACITY DURABLE, BUT NOT HEAVY HOW/WHERE TO MOUNT NECESSARY HARDWARE SUPPORT ARRAY TILT
THE BILL/INSTRUCTIONS CREATED AFTER THE DESIGN SPREADSHEET INSTRUCTIONS DIAGRAMS AND SCHEMATICS
DELIVERABLES OPTIMUM PLACEMENT OF PV CELLS MEASURE BUILDING DIMS FOR SHADING EVALUATE AZIMUTH & ELEVATION ANGLES ADDRESS SHADING CONCERNS MAXIMUM VS EFFICIENT PLACEMENT SIZE THE PV SYSTEM WORK AROUND MR. PATTERSON’S PREFERENCES INVERTER -> PV CELLS -> WIRE -> DISCONNECTS
DELIVERABLES CREATE SUPPORT STRUCTURE TILT OF PANELS STRESS ANALYSIS MOUNTING CONSIDERATIONS LIST PARTS NECESSARY FOR PROJECT SPREADSHEET: QUANTITIES, COSTS, TOTAL MAXIMIZING BENEFITS WITHIN BUDGET DESIGN PLAN TO INSTALL LIST OF INTRUCTIONAL PROCEDURES SCHEMATICS/DIAGRAMS
TIMEFRAME DESIGN SIZE FOR PV PLACEMENT (9/7 – 9/28) THE SYSTEM (9/29 – 10/13) CREATE SUPPORT STRUCTURE (10/13 – 11/3) SPREADSHEET DESIGN FOR PARTS (11/4 – 11/18) PLAN TO INSTALL (11/18 – 11/30)
CONCLUSION ANY QUESTIONS?