NLC - The Next Linear Collider Project 8 -Pack LLRF Status & Schedule Steve Smith July 23, 2002
LLRF Generation Next Linear Collider Author Name Date Steve Smith July 23, ‘ 02 # Slide
RF Generator Chassis Next Linear Collider Author Name Date Steve Smith July 23, ‘ 02 # Slide
RF Generator Chassis Next Linear Collider Author Name Date Steve Smith July 23, ‘ 02 # Slide
RF Processing Channel RF Generator Digital I/O Trip RF Cal RF (x 8) Octal Downconverter Trip IQA (x 8) Digitizer SIS ddress Mux A le Enab Reset IF (x 8) I&Q (x 8) LO 1 Thresh Mon IF Mon RM S LO 2 Next Linear Collider Peak Hold ADC VMIC 3122 Ppeak Scope / DVM Author Name Date Steve Smith July 23, ‘ 02 # Slide
Downconverter Chassis Next Linear Collider Author Name Date Steve Smith July 23, ‘ 02 # Slide
Downconverter Chassis Next Linear Collider Author Name Date Steve Smith July 23, ‘ 02 # Slide
Downconverter Chassis Next Linear Collider Author Name Date Steve Smith July 23, ‘ 02 # Slide
Next Linear Collider Author Name Date Steve Smith July 23, ‘ 02 # Slide
Next Linear Collider Author Name Date Steve Smith July 23, ‘ 02 # Slide
Next Linear Collider Author Name Date Steve Smith July 23, ‘ 02 # Slide
Next Linear Collider Author Name Date Steve Smith July 23, ‘ 02 # Slide
Next Linear Collider Author Name Date Steve Smith July 23, ‘ 02 # Slide
CPU SCANNER BLANK BLANK BLANK BLANK BLANK CPU BLANK IQA IQA SIS SIS LO PLL RF PLL Special Joeger BK Trig BLANK Special BLANK VMIC 4132 VMIC 4132 VMIC 3122 VMIC 2534 XYCOM CPU VME Crate Layout Next Linear Collider LLRF VME Crate #1 Layout (FAST) RF Monitor VME Crate #2 -3 Layout (SLOW) Author Name Date Steve Smith July 23, ‘ 02 # Slide
Schedule Next Linear Collider Author Name Date Steve Smith July 23, ‘ 02 # Slide
LLRF Generator Schedule. Next Linear Collider Author Name Date Steve Smith July 23, ‘ 02 # Slide
LLRF Monitor Schedule Next Linear Collider Author Name Date Steve Smith July 23, ‘ 02 # Slide
Status & Issues Next Linear Collider • First 2 downconverter chassis are ready – remaining ones soon complete. • RF generator chassis assembled – Needs mixer I&Q driver boards – And switch driver • Still designing stuff – Coupling, attenuation – Panels – Control algorithms • We are ~ 4 weeks late – Constrained by manpower, lab priorities. Author Name Date Steve Smith July 23, ‘ 02 # Slide
- X.next = x.next.next
- International linear collider
- Pack in, pack out
- Nlc prma
- Nlc hoofddorp
- Nlc ema
- Nlc calibration
- Nlc india intranet
- Nlc salary slip
- Fcc collider
- Fcc collider
- Bnl
- Muon collider
- Visual basic programming language
- Unity sphere collider
- Hadron collider
- Hadron collider
- Martinello colider
- Formal style characteristics