NICET Fire Alarm Tech Level 1 Practice Test



































- Slides: 35
NICET Fire Alarm Tech Level 1 Practice Test # 2 © Ted Smith 2017
Instructions • Be sure to place this presentation in Slide Show Mode if it is not already in that mode before proceeding • The purpose of this drill is to help you improve your skill at finding answers to questions using the applicable fire codes and also to help increase your knowledge of the Fire Alarm codes. • Each slide will contain a question. The question will remain in the screen for a period of 2 minutes. At the end of the two minutes, a notification will sound and the slide will transition to the next slide which will have the correct answer to the question. After 15 seconds the next question will appear and the process will continue. • During the test do not worry about the correct answers when those slide appear. You will be given an opportunity to review the answers with out the time at the end of the test. • Click on the slide to start the timer and begin the test
Denver Building Amendments • Records of all system installations, inspections, tests and maintenance required shall be maintained on the premises. The name and Denver Fire Department License number of the person(s) performing the work shall be legible on all forms. • True • False
Answer • True 901. 6. 2
Denver Building Amendments • A testing procedure, reviewed by the smoke control system design professional engineer, shall be submitted to the fire department ____ hours in advance of the acceptance tests being performed. • A. 24 • B. 48 • C. 72 • D. 96
answer • C. 72 hours • 909. 10. 1(1)
Denver building amendments • _____ sets of scaled, engineered installation shop drawings shall be submitted for Fire Department review. Documents shall be of sufficient clarity and detail to fully describe the scope of work. Handwritten notes and comments on reproduced drawings are not acceptable. • A. 1 • B. 2 • C. 3 • D. 4
answer • B. 2 • 907. 1. 2
Denver Building Amendments • Light fixtures installed in Marijuana Operations Extraction rooms shall be installed in accordance with the NEC as a _________ location. • • A. Class I, Div. 1 B. Class I, Div. 2 C. Class II, Div. 1 D. Class II, Div. 2
Answer • A. Class I, Div. 1 • 3903. 1. 5 and 3903. 2. 2
Denver Building Amendments • Smoking is prohibited where conditions are such as to make smoking a hazard, and in spaces where flammable or combustible materials are stored. • True • False
answer • True • IFC 310. 2
Denver Building Amendments • Installation of cables used for survivability of fire pump circuits shall comply with: • • A. NEC Article 695 B. UL 2196 C. Listing Requirements D. All of the above
Answer • D. All of the above • DBA 913. 2. 2
Denver Building Amendments • In a high rise building, automatic smoke detection is required in all interior corridors which serve as a means of egress for Group _____, ______ and _______ occupancies with an occupant load of 10 or more. • • A. F 1, F 2 and F 3 B. R 1, R 2 and R 3 C. R 1, R 3 and R 4 D. R 1, R 2 and R 4
answer • D. R 1, R 2 and R 4 • DBA 907. 2. 13. 1(3)
Denver Building Amendment • The radio system control channel in a high rise shall exceed -100 d. Bm at 95% or more of the locations measured within each floor plate. Which of the following areas is not required to have 1000% signal coverage at -100 d. Bm? • • A. Parking Garage B. Fire Command Center C. Stairwell D. Elevator lobby
Answer • A. Parking Garage • DBA 907. 2. 13. 2 • DBA 510. 1. 1
END of QUIz. THE TIME WILL STOP NOW. PLEASE CLICK ON THE SLIDE TO CONTINUE WITHOUT THE TIMER AND REVIEW EACH QUESTION.
Denver Building Amendments • Records of all system installations, inspections, tests and maintenance required shall be maintained on the premises. The name and Denver Fire Department License number of the person(s) performing the work shall be legible on all forms. • True • False
Answer • True 901. 6. 2
Denver Building Amendments • A testing procedure, reviewed by the smoke control system design professional engineer, shall be submitted to the fire department ____ hours in advance of the acceptance tests being performed. • A. 24 • B. 48 • C. 72 • D. 96
answer • C. 72 hours • 909. 10. 1(1)
Denver building amendments • _____ sets of scaled, engineered installation shop drawings shall be submitted for Fire Department review. Documents shall be of sufficient clarity and detail to fully describe the scope of work. Handwritten notes and comments on reproduced drawings are not acceptable. • A. 1 • B. 2 • C. 3 • D. 4
answer • B. 2 • 907. 1. 2
Denver Building Amendments • Light fixtures installed in Marijuana Operations Extraction rooms shall be installed in accordance with the NEC as a _________ location. • • A. Class I, Div. 1 B. Class I, Div. 2 C. Class II, Div. 1 D. Class II, Div. 2
Answer • A. Class I, Div. 1 • 3903. 1. 5 and 3903. 2. 2
Denver Building Amendments • Smoking is prohibited where conditions are such as to make smoking a hazard, and in spaces where flammable or combustible materials are stored. • True • False
answer • True • IFC 310. 2
Denver Building Amendments • Installation of cables used for survivability of fire pump circuits shall comply with: • • A. NEC Article 695 B. UL 2196 C. Listing Requirements D. All of the above
Answer • D. All of the above • DBA 913. 2. 2
Denver Building Amendments • In a high rise building, automatic smoke detection is required in all interior corridors which serve as a means of egress for Group _____, ______ and _______ occupancies with an occupant load of 10 or more. • • A. F 1, F 2 and F 3 B. R 1, R 2 and R 3 C. R 1, R 3 and R 4 D. R 1, R 2 and R 4
answer • D. R 1, R 2 and R 4 • DBA 907. 2. 13. 1(3)
Denver Building Amendment • The radio system control channel in a high rise shall exceed -100 d. Bm at 95% or more of the locations measured within each floor plate. Which of the following areas is not required to have 1000% signal coverage at -100 d. Bm? • • A. Parking Garage B. Fire Command Center C. Stairwell D. Elevator lobby
Answer • A. Parking Garage • DBA 907. 2. 13. 2 • DBA 510. 1. 1