News from Anti-Proton ANnihilation at DArmstadt QCD physics with antiprotons GDR-PH-QCD, IPN Orsay, December 6 -7 , 2012 SPh. N, 26 -X-2012 Egle Tomasi-Gustafsson 1

Feu vert pour la grande installation de recherche Fair La Fair Gmb. H a

Feu vert pour la grande installation de recherche Fair La Fair Gmb. H a reçu le 29 octobre 2012 l’autorisation lui permettant de construire la nouvelle grande installation de recherche Fair (Facility for Antiproton and Ion Research). La construction durera au moins six ans. Le maître d’ouvrage est la Fair Gmb. H. Celle-ci rassemble des sociétaires d’Allemagne, du Land de Hesse, et des gouvernements de huit pays européens et asiatiques. SPh. N, 26 -X-2012 Egle Tomasi-Gustafsson 2

Feu vert pour la grande installation de recherche Fair • Le contrat international correspondant,

Feu vert pour la grande installation de recherche Fair • Le contrat international correspondant, l’accord Fair, a été signé par l’Allemagne, la Finlande, la France, l’Inde, la Pologne, la Roumanie, la Russie, la Suède et la Slovénie. • Il représente un investissement total de plus d’un milliard d’euros (CHF 1, 2 mia. ), dont la moitié sera allouée à la construction. • Les coûts des accélérateurs de particules et des installations d’expérimentation sont quant à eux estimés à environ 500 millions d’euros (CHF 600 mio. ). • La nouvelle installation Fair sera six fois plus grande que l’installation actuelle du GSI…. SPh. N, 26 -X-2012 Egle Tomasi-Gustafsson 3

About 3000 scientists from around the world will carry out experiments to understand the

About 3000 scientists from around the world will carry out experiments to understand the fundamental structure of matter, to explore exotic forms of it and to find final answers of how the universe evolved from its primordial state into what we see today. FAIR covering four major fields: allows to carry out several physics programs in parallel, APPA Physics - Atomic, Plasma Physics and Applications CBM Compressed Baryonic Matter NUSTAR Physics – Nuclear Structure, Astrophysics and Reactions The PANDA (Antiproton Anihilation at Darmstadt) Experiment SPh. N, 26 -X-2012 Egle Tomasi-Gustafsson http: //www. faircenter. de 4

Some history In February 2003 the German Federal Government gave green light for the

Some history In February 2003 the German Federal Government gave green light for the GSI plans. The German Government has committed up to 75% of the cost of construction, the remainder is to be funded by international partners. The new facility FAIR (Facility for Antiproton and Ion Research) is organised as an international research centre. In October 2010 nine countries in Wiesbaden have signed the international agreement on the joint construction of FAIR in Darmstadt SPh. N, 26 -X-2012 Egle Tomasi-Gustafsson 5

Antiprotons at FAIR http: //www. fair-center. eu/ http: //www-panda. gsi. de/ SIS 100/300 50

Antiprotons at FAIR http: //www. fair-center. eu/ http: //www-panda. gsi. de/ SIS 100/300 50 Me. V SIS 18 p-Linac 30 Ge. V Protons HESR Cu Target 107 p/s @ 3 Ge. V Parameters of HESR PANDA Accelerating pbar production Cooling • Injection of pbar at 3. 7 Ge. V • proton Linac 50 Me. V • Slow synchrotron (1. 5 -14. 5 Ge. V/c) • accelerate p in SIS 18/SIS 100 • Storage ring for internal target operation Collecting RESR/CR • produce target 32 cm-2 s-1 • Luminosity uppbar to L~on 2 x 10 Accumulating • collect pbar in CR, • Beam cooling (stochastic & electron ) Precooling 100 m • cooling in RESR SPh. N, 26 -X-2012 Egle Tomasi-Gustafsson 6

Some numbers • FAIR will provide antiproton and ion beams with unprecedented intensity and

Some numbers • FAIR will provide antiproton and ion beams with unprecedented intensity and quality. • In the final construction FAIR consists of eight ring colliders with up to 1, 100 meters in circumference, two linear accelerators and about 3. 5 kilometers beam control tubes. • The existing GSI accelerators serve as a preaccelerators. SPh. N, 26 -X-2012 Egle Tomasi-Gustafsson 7

More numbers • • • Almost 600, 000 cubic metres of concrete Over 35,

More numbers • • • Almost 600, 000 cubic metres of concrete Over 35, 000 tonnes of steel 500, 000 tonnes of other construction material will be used to build FAIR. Over one million cubic metres of soil will be excavated during construction and used at a later stage to cover underground structures. Work on the foundations is set to start shortly. This will involve embedding around 1, 500 piles, with diameters of 1. 2 metres, up to 65 metres into the ground to create a suitable foundation for the buildings. During the most intensive construction periods, up to 600 construction workers, technicians and engineers will be working at the site. SPh. N, 26 -X-2012 Egle Tomasi-Gustafsson 8

5. 11. 2012. FAIR employees planted the first 500 trees today SPh. N, 26

5. 11. 2012. FAIR employees planted the first 500 trees today SPh. N, 26 -X-2012 Egle Tomasi-Gustafsson 9

SPh. N, 26 -X-2012 Egle Tomasi-Gustafsson 10

SPh. N, 26 -X-2012 Egle Tomasi-Gustafsson 10

Timescale of 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 experiment commissioning

Timescale of 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 experiment commissioning installation at FAIR pre-assembly mass production R&D TDR FAIR SPh. N, 26 -X-2012 Egle Tomasi-Gustafsson 11

Thank you for your attention! SPh. N, 26 -X-2012 Egle Tomasi-Gustafsson 12

Thank you for your attention! SPh. N, 26 -X-2012 Egle Tomasi-Gustafsson 12

Open questions in QCD (some. . ) • Confinement: why free quarks are not

Open questions in QCD (some. . ) • Confinement: why free quarks are not observed? • Origin of the hadron mass: the Higgs mechanism accounts for some percent of the hadron mass • How are color neutral objects formed? • Establish existence and properties of exotics, hybrids, glueballs • Structure of the nucleon (charge, magnetic, spin distributions) SPh. N, 26 -X-2012 Egle Tomasi-Gustafsson 13