NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges Over Route 80 Town of

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges Over Route 80 Town of Tully, New York Region 3 PIN 3501. 76, Contract No. D 900023 Onondaga County Draft Request for Proposals RFP Informational Meeting September 3, 2014

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Rules of Contact 2 Catherine Traina Attn: Interstate 81 Bridges Over Route 80 in R 3 Design-Build Project Office of Contract Management New York State Department of Transportation 50 Wolf Road, 6 th Floor Albany, New York 12232 Catherine. Traina@dot. ny. gov

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Agenda 3 Project Overview Department’s Goals & Project Requirements Scope of Work Status of ROW and Utilities General Contract Information Procurement Schedule RFP Content Quality Control & Quality Assurance Evaluation and Selection Additional Information and Submission Guidelines Questions and Answers

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) General Location 4 N Interstate 81 over Route 80 Town of Tully, Onondaga County

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) BIN 1030661 5 Interstate 81 SB Over Route 80 (BIN 1030661) N

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) BIN 1030662 6 Interstate 81 NB Over Route 80 (BIN 1030662) N

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Goals 7 Ensure a long service life for all Project elements to satisfy long term preservation goals Ensure the safety of the traveling public Maximize the impact of public investment by: Providing cost-effective solutions that maximize value over the lifespan of the project Sequencing construction to minimize effects on vehicular traffic operations Reducing future maintenance requirements Minimizing effects on the local community Minimizing impacts on the environment

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Goals (Continued) 8 Deliver the Project safely, on schedule, and within budget Ensure coordination with utility owners, third parties, the surrounding community, Project stakeholders, and any adjacent construction projects Ensure compliance with the Project’s environmental commitments and conditions Provide best value to the Department

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) General Scope of Work 9 Full bridge replacement (substructures and superstructures) of the following bridges: BIN 1030661 – I-81 SB over Route 80 BIN 1030662 – I-81 NB over Route 80 Removal of existing substructures and superstructures, including potential remediation and disposal of lead paint and asbestos-containing materials Approach roadway reconstruction as required to connect the existing roadways to the new bridges, including guide rail replacement Construction of asphalt paths on the north and south sides of Route 80 between the Route 11 intersection and the Route 11 A intersection

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) General Scope of Work (Continued) 10 Cleaning of existing ditches along both sides of Route 80 between the Route 11 intersection and the Route 11 A intersection Replacement of ground-mounted signs along Route 80 between the Route 11 intersection and the Route 11 A intersection Coordination of utility relocation and/or preservation of existing utilities with utility owners Development of a Work Zone Traffic Control Plan Any additional Environmental and Construction Related Permits by Design-Builder

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Right-of-Way 11 The Department owns all Right-of-Way for the existing structures. No additional Right-of-Way acquisitions or temporary easements are anticipated to be required for this project. Any Right-of-Way fencing damaged or removed by the Design-Builder during construction shall be replaced with new Right-of-Way fencing meeting current Department standards.

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Utility Coordination – Existing Utilities 12 In accordance with Part 4 – Utility Requirements, Design-Builder is responsible for: Verifying utility facility locations Identifying & resolving any conflicts not yet documented Coordinating with utility owners for utility relocations Providing stakeout and final layout of utility relocations Protecting existing utilities Cost of repairing damages to utilities caused by Design-Builder Informing the Department of all meetings and

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Utility Coordination – Existing Utilities 13 Known utilities located in the Project area: National 6 -Inch Grid gas line 18’+/- south of Route 80 centerline Primary aerial lines on the north side of Route 80 that cross over Interstate 81 Verizon Duct Time of NY bank 28’+/- north of Route 80 centerline Warner Aerial lines on the north side of Route 80 attached to the National Grid poles - These cross under Interstate 81 and are attached to the underside of the Interstate bridges.

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Utility Coordination – Existing Utilities 14 Time Warner Cable shall be responsible for any necessary relocation of its aerial facilities within the project limit. The Design-Builder shall be responsible for negotiating a three-party agreement between the utility, the Department and the Design -Builder. Impact on other utilities is dependent on the approach taken by the Design-Builder. A meeting will be scheduled between the utilities and the short listed firms. The Department will invite the short listed firms and the utilities within the project limits to this meeting within the next two weeks.

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Contract Information 15 Project Completion Date shall be the earlier of: October 31, 2016 or The number of days past NTP proposed by the successful Proposer on Form SCD (ITP Appendix E) Special Provision 6 Liquidated Damages will be imposed for not meeting the Project completion date and for days in excess of the number of calendar days indicated to complete the Milestones shown on Form SCD. Up to 3 Early Completion Bonuses will be awarded: For the number of calendar days that all traffic in permanently transferred onto each new structure earlier than the respective Interim Completion Milestone Dates (with no further lane closures) and/or For the number of calendar days that Project Completion is

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Contract Information (Continued) 16 Lump Sum Design-Build Contract Best Value Selection Process (50% Price, 50% Quality) Payment Schedule provided in the RFP Stipend to Unsuccessful Proposers - 50% of Qualified Costs up to $45 K* max. (Must satisfy criteria in ITP General Instructions) Escrow Submission of Bid Documents for Successful Proposer Buy America Clause Iran Divestment Act Clause DBE Participation Goal - 12%

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Anticipated Procurement Schedule 17 Activity Draft RFP Info Meeting Due Date September 3, 2014 Final RFP to Shortlisted Firms September 19, 2014 Final Date for Requests for Changes to Proposer’s Organization and Personnel November 24, 2014 Final Date for Receipt of Proposer Questions November 26, 2014 Issue Date for Final Addendum and/or Answers to Proposer Questions December 3, 2014 Proposals Due December 22, 2014 Post Proposal Meetings (if required) Selection of Best Value Execution of Contract Award Notice to Proceed TBD Mid-January 2015 Late February 2015 March 12, 2015

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Request for Proposals (RFP) Documents 18 RFP Documents: Instructions to Proposers • • General Instructions Appendix A – Project Information Appendix B – Administrative Submittal Requirements Appendix C – Technical Submittal Requirements Appendix D – Price Proposal Submittal Requirements Appendix E – Forms Appendix F – Conflict of Interest Policy Appendix G – Abbreviations and Definitions

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Request for Proposals (RFP) Documents (Continued) 19 Part 1: D-B Agreement Part 2: General Provisions, Section DB 100 and Appendices Part 3: Project Requirements (Scope of Work) Part 4: Utility Requirements Part 5: Special Provisions Part 6: RFP Plans Part 7: Engineering Data Part 8: Special Specifications (Including New DB Specifications) Part 9: Design-Builder’s Proposal Part 10: RFP Addenda (If Any) Reference Documents on Department’s web site (Not part of the Contract Documents)

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Quality Control (QC) 20 QC is Design-Builder’s Responsibility. Design-Builder shall appoint a QC Manager responsible for the QC Plans for both Design and Construction. Design QC shall be performed by the Designer in accordance with the QC Plan. Construction Inspection shall be performed by an Independent Engineering Firm hired by the Design-Builder. Materials Testing shall be performed by an Independent Materials Testing Firm or Laboratory hired by the Design. Builder. The Materials Testing Firm shall report to the Construction Inspection Firm. Offsite Plant Quality Control shall be performed by the Department.

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Quality Assurance (QA) 21 Design and Construction QA is the Department’s Responsibility. The Department may perform QA on any of the Design. Builder’s Design and Construction activities. The Department will utilize an Independent Consultant to perform QA of the Design-Builder’s Designs. Construction QA will be performed by Department staff. Offsite Plant Quality Assurance will be performed by the Department.

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) RFP Evaluation and Selection 22 Pass/Fail Evaluation Factors Legal – Financial – Administrative – DBE Compliance - Price Proposal (Bond/Conformance) Quality Evaluation Factors (50%) Key Personnel (30 points) Management Approach (25 points) Overall Design-Build Team Organization (7 points) Design Management Plan (5 points) Construction Management Plan (6 points) Quality Control Plan (7 points) Technical Solutions (35 points) Design Approach (10 points) Construction Approach (10 points) Initial Baseline Schedule (15 points) Project Support (5 points) Proposal Format(5 points) Price (50%) Design-Builder must obtain a minimum score of 60 points on Quality Evaluation factors

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Additional Information – Submission Guidelines 23 All proposals must be self-contained. • Proposals should not have links to external web sites. • Proposals should contain all information needed for evaluation. Do not assume the Department “knows” your firm and its experience/qualifications.

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Additional Information – Submission Guidelines 24 Submit ALL Forms required. Do not alter any Form unless indicated on the Form. Do not add any appendices or attachments to the Forms. Do not include photographs or illustrations unless specifically indicated. Do not submit: Form SA (Stipend Agreement) Form BDEA (Bid Document Escrow Agreement) PAB (Payment Bond (Labor and Material Bond)) PEB (Performance Bond (Faithful Performance Bond))

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Additional Information 25 Responses to Proposer Questions will be posted on the Department’s Project Web Site. Reference Documents are Posted on the Department’s Project Web Site: https: //www. dot. ny. gov/main/business-center/designbuildproject 10 Reference Documents include: Design Report (When Available) Bridge Inspection Reports Record Plans Asbestos Survey Reports Soil Boring Logs Archaeological Monitoring and Data Recovery Plan (Pending)

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Rules of Contact 26 Catherine Traina Attn: Interstate 81 Bridges over Route 80 in R 3 Design-Build Project Office of Contract Management New York State Department of Transportation 50 Wolf Road, 6 th Floor Albany, New York 12232 Catherine. Traina@dot. ny. gov

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76;

Interstate 81 Bridges Over Route 80 in Region 3 Design-Build Project (PIN 3501. 76; D 900023) Questions and Answers 27 Questions ?