NCC pre design Drawing EDMS Approval procedure before
NCC pre design Drawing. EDMS Approval procedure before final design. Drawing from Thierry Renaglia 9/30/2020 FP 420 Integration. DD INFN To 1
New station layout. 3 D silicon + GASTOF or QUARTIC 9/30/2020 FP 420 Integration. DD INFN To 2
Station layout. Compatibility with detectors to be checked. 9/30/2020 FP 420 Integration. DD INFN To 3
Stations on New Connection Cryostat 9/30/2020 FP 420 Integration. DD INFN To 4
9/30/2020 FP 420 Integration. DD INFN To 5
Silicon 3 d mounting proposal Carbon bearing and synthetics balls fixed on detector frame. Components act both as reference system and thermal insulator. Cooling feedthroughs Electrical feedthroughs Carbon bearing system Synthetics ruby balls Conical seat Flat seat V groove seat 9/30/2020 FP 420 Integration. DD INFN To 6
Si 3 d package envelope dimension. 9/30/2020 FP 420 Integration. DD INFN To 7
Detectors Table. Proposal 1. 9/30/2020 FP 420 Integration. DD INFN To 8
Detectors Table proposal 2 9/30/2020 FP 420 Integration. DD INFN To 9
Radiation Shielding. 1 9/30/2020 FP 420 Integration. DD INFN To 10
Radiation Shielding. 2 Back fixed plates supported by NCC Structure (~210 kg x 3) Fixed plates supported by detector table (~240 kg x 3) Fixed Beam pipes section supported by NCC structure (~180 kg x 2) Passages for services 9/30/2020 FP 420 Integration. DD INFN To 11
Mobile shielding closed position scenario. Mobile shielding (~160 kg x 6) 9/30/2020 FP 420 Integration. DD INFN To 12
Mobile shielding opened on central station scenario 9/30/2020 FP 420 Integration. DD INFN To 13
Mobile shielding on pumping stations ? 9/30/2020 FP 420 Integration. DD INFN To 14
Radiation shielding layout 9/30/2020 FP 420 Integration. DD INFN To 15
Radiation shielding detail – face view- 9/30/2020 FP 420 Integration. DD INFN To 16
Cross section A-A (mobile shielding) 9/30/2020 FP 420 Integration. DD INFN To 17