National disaster contingency planning emergency relief material reserve

  • Slides: 17
Download presentation

National disaster contingency planning, emergency relief material reserve and emergency shelter 国家灾害�急�案、�急救援物���及�急避 �所 Krishna

National disaster contingency planning, emergency relief material reserve and emergency shelter 国家灾害�急�案、�急救援物���及�急避 �所 Krishna Bahadur Raut Joint Secretary, Disaster Management Division, Ministry of Home Affairs Government of Nepal

National Institutional Arrangement for Disaster Response (According to 1982 Act) 国家灾害响应机构设置 (根据 1982年法令)

National Institutional Arrangement for Disaster Response (According to 1982 Act) 国家灾害响应机构设置 (根据 1982年法令)

Existing Legal Instruments 现有法律条例 Natural Calamity (Relief ) Act, 1982 Government Work Division Regulation,

Existing Legal Instruments 现有法律条例 Natural Calamity (Relief ) Act, 1982 Government Work Division Regulation, 2009 National Strategy for DRM, 2009 Rescue and Relief Standards, 2007 National Disaster Response Framework, 2013 Local Self Governance Act, 1999 Sector specific Policies and Plans Disaster Preparedness and Response Plan in all districts So. P for National Emergency Operation Centre Common Assessment Guidelines Disaster Management Fund Prime Minister Natural Disaster Relief Fund Central Natural Disaster Relief Fund Local government Disaster Management Fund

National Emergency Response Mechanism (Go. N) 国家应急响应机制 UN Resident / Humanitarian Coordinator UNDAC /

National Emergency Response Mechanism (Go. N) 国家应急响应机制 UN Resident / Humanitarian Coordinator UNDAC / SAR teams Clusters Activated International Appeal Government Agencies Local NGO’s GON Declares Disaster (area, time) CNDRC meeting held Mo. HA, / NEOC INGOs & others Disaster Situation Analysis (CDO, DDRC)

Coordination Structure during Mega Disasters 巨灾期间的协调机制 Central Natural Disaster Relief Committee (CNDRC) Clusters NEOC/LEMA

Coordination Structure during Mega Disasters 巨灾期间的协调机制 Central Natural Disaster Relief Committee (CNDRC) Clusters NEOC/LEMA International Responders UN Agencies Funds & Programme Multi-National Force Coordination Center (MNCC) On Site Operations Coordination Center (OSOCC) Red Cross Movement Civil/ Private Sectors

Contingency Planning at National and Sub -national Level 国家和地方应急预案 NDRF 2013 the key national

Contingency Planning at National and Sub -national Level 国家和地方应急预案 NDRF 2013 the key national document on systemic preparedness planning and response: one of the major priorities is Contingency Planning. Emergency Preparedness Planning: annual process engaging all the stakeholders, under Mo. HA leadership, initiated as monsoon preparedness decade ago. Hospital Preparedness for Emergency Plan is in place. Hazard specific contingency plans engaging all 11 clusters, e. g. National level Monsoon Preparedness Plan 2016. District Disaster Preparedness and Response Planning process as a roll out of contingency planning. DDMP, LDRMP are prepared in district and community level.

Emergency Response Preparedness Plans 应急响应准备项目 1. National Strategy on Early Warning System finalization and

Emergency Response Preparedness Plans 应急响应准备项目 1. National Strategy on Early Warning System finalization and testing 2. Stock pilling of Food, SAR Kits, NFIs 3. Simulation exercises and drills 4. Resources Inventory (roster of experts; USAR equipments; list of hospitals & its capacity, ambulance) 5. Identification and site planning of open spaces 6. Development of USAR capacities 7. Development of Emergency Communication Strategy and Emergency Communication Set Up 8. Development of guidelines for accepting

National Emergency Operation Centre (NEOC), a national operational set up under Mo. HA 内政部国家应急行动中心(NEOC)

National Emergency Operation Centre (NEOC), a national operational set up under Mo. HA 内政部国家应急行动中心(NEOC) Normal Phase (Preparedness & IM) Alert Phase Recovery Phase (Coordinate Early Recovery efforts) Response Phase (leads coordination and communication for response) (keep alerts agencies and authorities for an imminent emergency) NEOC House

Network of Emergency Operation Centres 应急行动中心网络

Network of Emergency Operation Centres 应急行动中心网络

NEOC国家EOC CB EWS 社区� 警系� DEOC 地方EOC NEOC 国家EOC

NEOC国家EOC CB EWS 社区� 警系� DEOC 地方EOC NEOC 国家EOC

Arrangements and Capacities 相关安排和能力建设 • 83 Open Spaces and more evacuation sites identified •

Arrangements and Capacities 相关安排和能力建设 • 83 Open Spaces and more evacuation sites identified • NEOC, 49 DEOCs, 5 REOCs & one MEOC • Rubble Removal Plan under process • Dead Body Management Guidelines • Disaster Management Training Centre at APF • DRR Focal Points in different Ministries and Agencies; • Eleven Clusters and their Contingency Plans

Contingency Planning and Earthquake Response 2015 应急方案及2015地震响应 • NDRF was used as a main

Contingency Planning and Earthquake Response 2015 应急方案及2015地震响应 • NDRF was used as a main tool in the earthquake response activation and coordination. • National emergency response mechanism activated, and coordination mechanism during mega disaster was applied. • Affected districts used their DPRP as the main tool. • All the clusters activated.

HCT Planning 人道主义协调小组应急预案 HCT Contingency Plan – Earthquake preparedness for next large (Mw>8) EQ

HCT Planning 人道主义协调小组应急预案 HCT Contingency Plan – Earthquake preparedness for next large (Mw>8) EQ scenario – Evolving scenario ( multi-hazards ) – Cluster Operational Planning

 • • • Emergency Relief Materials Reserve 应急救援物资储备 Five regional warehouses (only four

• • • Emergency Relief Materials Reserve 应急救援物资储备 Five regional warehouses (only four in operation) and Warehouses of NFC National Minimum Standard on Non-Food Relief Items Humanitarian Staging Area has been established at International Airport Cluster wise relief materials identified and standards agreed Nepal Red Cross has about one dozen warehouses in different parts of Nepal

Emergency Shelter 应急避难场所 Ministry of Urban Development/Department of Urban Development and Building Construction is

Emergency Shelter 应急避难场所 Ministry of Urban Development/Department of Urban Development and Building Construction is responsible to prepare emergency shelter with Contingency Plan. 83 Open spaces identified and protected in Kathmandu valley, were instrumental for temporary shelter during 2015 earthquake response. Now, Basic physical infrastructures are under construction in some open spaces.

Thank you 谢谢

Thank you 谢谢